郭立夫,李北伟.决策理论与方法[M].北京:高等教育出版社,2004:215-247.Guo Lifu,Li Beiwei.Decision theory and method [M].Beijing:Higher Education Press,2004:215-247(in Chinese).
[2]
高宗和,滕贤亮,涂力群.互联电网AGC分层控制与CPS控制策略[J].电力系统自动化,2004,28(1):78-81.Gao Zonghe,Teng Xianliang,Tu Liqun.Hierarchical AGC mode and cps control strategy for interconnected power systems[J].Automation of Electric Power Systems,2004,28(1):78-81(in Chinese).
[3]
Jaleeli N,Vanslyck L S.NERC's new control performance standards[J].IEEE Transactions on Power Systems,1999,14(3):1092-1099.
[4]
Clark Kara,Miller Nicholas W,Sanchez-Gasca Juan J.Modeling of GE wind turbine-generators for grid studies[R].New York:2010.
Ferreira C,Gama J,Matias L,et al.A survey on wind power ramp forecasting[R].Lemont,Illinois:Argonne National Laboratory (ANL),2011.
[7]
Freedman J,Markus M,Penc R.Analysis of West Texas wind plant ramp-up and ramp-down events[R].Albany,New York,2008.
[8]
戚永志,刘玉田.风电高风险爬坡有限度控制[J].中国电机工程学报,2013,33(13):69-75.Qi Yongzhi,Liu Yutian.Finite control of high risk wind power ramping[J].Proceedings of the CSEE,2013,33(13):69-75(in Chinese).
[9]
Hansen A D,Rensen S O P,Iov F,et al.Centralised power control of wind farm with doubly fed induction generators[J].Renewable Energy,2006,31(7):935-951.
[10]
Rodriguez-Amenedo J L,Arnaltes S,Rodriguez M A.Operation and coordinated control of fixed and variable speed wind farms[J].Renewable Energy,2008,33(3):406-414.
[11]
乔颖,鲁宗相.考虑电网约束的风电场自动有功控制[J].电力系统自动化,2009,33(22):88-93.Qiao Ying,Lu Zongxiang.Wind farms active power control considering constraints of power grids [J].Automation of Electric Power Systems,2009,33(22):88-93(in Chinese).
[12]
肖创英,汪宁渤,丁坤,等.甘肃酒泉风电功率调节方式的研究[J].中国电机工程学报,2010,30(10):1-7.Xiao Chuangying,Wang Ningbo,Ding Kun,et al.System power regulation scheme for Jiuquan wind power base[J].Proceedings of the CSEE,2010,30(10):1-7(in Chinese).
[13]
梅生伟,王莹莹,刘锋.风-光-储混合电力系统的博弈论规划模型与分析[J].电力系统自动化,2011,35(20):13-19.Mei Shengwei,Wang Yingying,Liu Feng.A game theory based planning model and analysis for hybrid power system with wind generators-photovoltaic panels-storage batteries[J].Automation of Electric Power Systems,2011,35(20):13-19(in Chinese).
[14]
王莹莹,梅生伟,刘锋.混合电力系统合作博弈规划的分配策略研究[J].系统科学与数学,2012,32(4):418-428.Wang Yingying,Mei Shengwei,Liu Feng.Imputation schemes for the cooperative game in the hybrid power system planning[J].Journal of Systems Science and Mathematical Sciences,2012,32(4):418-428(in Chinese).
[15]
叶荣,陈皓勇,卢润戈.基于微分博弈理论的两区域自动发电控制协调方法[J].电力系统自动化,2013,37(18):48-54.Ye Rong,Chen Haoyong,Lu Runge.A differential games theory based method for coordinating two-areas automatic generation control[J].Automation of Electric Power Systems,2013,37(18):48-54(in Chinese).
[16]
梅生伟,郭文涛,王莹莹,等.一类电力系统鲁棒优化问题的博弈模型及应用实例[J].中国电机工程学报,2013,33(19):47-56.Mei Shengwei,Guo Wentao,Wang Yingying,et al.A game model for robust optimization of power systems and its application[J].Proceedings of the CSEE,2013,33(19):47-56(in Chinese).
[17]
Ahlstrom M,Bartlett D,Collier C,et al.Knowledge is power:efficiently integrating wind energy and wind forecasts[J].IEEE Power and Energy Magazine,2013,11(6):45-52.
[18]
Tande John Olav Giæver,Korpås Magnus,et al.Planning and operation of large offshore wind farms in areas with limited power transfer capacity[J].Wind Engineering,2012,36(1):69-80.
[19]
Kasem A H,El-Saadany E F,El-Tamaly H H,et al.Power ramp rate control and flicker mitigation for directly grid connected wind turbines[J].IET Renewable Power Generation,2010,4(3):261-271.