结合状态削减技术的电力系统黑启动动态规划算法

DOI: 10.13334/j.0258-8013.pcsee.2014.25.025, PP. 4409-4419

Keywords: 电力系统,黑启动,马尔科夫决策模型,动态规划,状态削减

Full-Text   Cite this paper   Add to My Lib

Abstract:

电力系统黑启动预案是电网运行安全的必要保障,但人工进行方案决策的现状难以适应复杂电力系统和多样化的故障后场景。为此,建立电力系统黑启动过程的马尔科夫决策过程模型,提出一种基于状态削减技术和动态规划方法的黑启动方案自动生成算法,其优化目标是以最短的时间将系统恢复至任意预定状态,能够适应不同的故障后场景,支持并行的恢复操作。采用IEEE14节点系统、新英格兰39节点系统以及鄂东南电网对算法的可行性进行了验证。算例结果表明,该算法能够在较短时间内生成合理的黑启动方案,同时能够在黑启动初期通过发电机组与负荷的协调恢复抑制网架的过电压现象。

References

[1]  Toune S,Fudo H,Genji T,et al.Comparative study of modern heuristic algorithms to service restoration in distribution systems[J].IEEE Transactions on Power Systems,2002,17(1):173-181.
[2]  Pérez-Guerrero R,Heydt G T,Jack N J,et al.Optimal restoration of distribution systems using dynamic programming[J].IEEE Transactions on Power Delivery,2008,23(3):1589-1596.
[3]  Su Ching-Tzong,Lee Chu-Sheng.Network reconfiguration of distribution systems using improved mixed-integer hybrid differential evolution[J].IEEE Transactions on Power Delivery,2003,18(3):1022-1027.
[4]  钟慧荣,顾雪平,朱玲欣.黑启动恢复中网架重构阶段的负荷恢复优化[J].电力系统保护与控制,2011,39(17):26-32.Zhong Huirong,Gu Xueping,Zhu Lingxin,et al.Optimization of load restoration during network reconfiguring process of black-start restoration[J] Power System Protection and Control,2011,39(17):26-32(in Chinese).
[5]  刘映尚,吴文传,冯永青,等.黑启动过程中的负荷恢复[J].电网技术.2007,31(13):17-22.Liu Yingshang,Wu Wenchuan,Feng Yongqing,et al.Load recovery during power system blackstart[J].Power System Technology,2007,31(13):17-22(in Chinese).
[6]  王洪涛,刘玉田,邱夕兆,等.基于多agent的电力系统主从递阶恢复决策[J].电力系统自动化,2006,30(15):5-9.Wang Hongtao,Liu Yutian,Qiu Xizhao,et al.Multi-agent based stackelberg decision for power system restoration[J].Automation of Electric Power Systems.2006,30(15):5-9(in Chinese).
[7]  王洪涛,刘玉田.电力系统恢复的主从递阶决策模型及其优化算法[J].中国电机工程学报,2007,27(1):8-13.Wang Hongtao,Liu Yutian.Leader-follower hierarchical decision model and optimal method for power system restoration[J].Proceedings of the CSEE,2007,27(1):8-13(in Chinese).
[8]  Fountas N A,Hatziargyriou N D,Valavanis K P.Hierarchical time-extended Petri nets as a generic tool for power system restoration[J].IEEE Transactions on Power Systems,1997,12(2):837-843.
[9]  Wu Jaw-Shyang,Liu Chen-Ching,Liou Kan-Lee,et al.A Petri net algorithm for scheduling of generic restoration actions[J].IEEE Transactions on Power Systems,1997,12(1):69-76.
[10]  Hou Yunhe,Liu Chen-Ching,Sun Kai,et al.Computation of milestones for decision support during system restoration[J].IEEE Transactions on Power Systems,2011,26(3):1399-1409.
[11]  刘克.实用马尔科夫决策过程[M].北京:清华大学出版社,2004:7-13.Liu Ke.Applied Markov decision processes[M].Beijing:Tsinghua University Press,2004:7-13(in Chinese).
[12]  张志毅,陈允平,袁荣湘.电力系统负荷恢复问题的混合遗传算法求解[J].电工技术学报,2007,22(2):105-109.Zhang Zhiyi,Chen Yunping,Yuan Rongxiang.Hybrid genetic algorithm for power system load restoration[J].Transactions of China Electrotechnical Society,2007,22(2):105-109(in Chinese).
[13]  Srinivas N,Kalyanmoy D.Multiobjective optimization using nondominated sorting in genetic algorithms[J].Evolutionary Computation,1994,2(3):221-248.
[14]  Zimmerman R D,Carlos E,Murillo-Sánchez,et al.Matpower:a MATLAB power system simulation package[EB/OL].Ithaca,NY:Cornell University,2011 [2011-12-.http://www.pserc.cornell.edu/matpower/.
[15]  刘艳.电力系统黑启动恢复及其决策支持技术的研究[D].保定:华北电力大学,2007.Liu Yan.Research on Power system black-start restoration and its decision support technique[D].Baoding:North China Electric Power University,2007(in Chinese).
[16]  Adibi M M,Fink L H.Overcoming restoration challenges associated with major power system disturbances:restoration from cascading failures[J].IEEE Power and Energy Magazine,2006,4(5):68-77.
[17]  刘强,石立宝,周明,等.电力系统恢复控制的机组优化启动策略[J].电力自动化设备,2009,29(4):1-5.Liu Qiang,Shi Libao,Zhou Ming,et al.Optimal start-up strategy of units during power system restoration[J].Electric Power Automation Equipment,2009,29(4):1-5(in Chinese).
[18]  韩忠晖,顾雪平,刘艳.考虑机组启动时限的大停电后初期恢复路径优化[J].中国电机工程学报,2009,29(4):21-26.Han Zhonghui,Gu Xueping,Liu Yan,et al.Optimization of restoration paths considering unit start-up time requirements at early stage of power system restoration[J].Proceedings of the CSEE,2009,29(4):21-26(in Chinese).
[19]  顾雪平,钟慧荣,贾京华.电力系统扩展黑启动方案的研究[J].中国电机工程学报,2011,31(28):25-32.Gu Xueping,Zhong Huirong,Jia Jinghua.Extended black-start schemes of power systems[J].Proceedings of the CSEE,2011,31(28):25-32(in Chinese).
[20]  Sun Wei,Liu Chen-Ching,Zhang Li.Optimal generator start-up strategy for bulk power system restoration[J].IEEE Transactions on Power Systems,2011,26(3):1357-1366.
[21]  Shimakura K,Inagaki J,Matsunoki Y,et al.A knowledge-based method for making restoration plan of bulk power system[J].IEEE Transactions on Power Systems,1992,7(2):914-920.
[22]  Nagata T,Sasaki H,Yokoyama R.Power system restoration by joint usage of expert system and mathematical programming approach[J].IEEE Transactions on Power Systems,1995,10(3):1473-1479.
[23]  Hsu Y Y,Huang H M.Distribution system service restoration using the artificial neural network approach and pattern recognition method[J].IEE Proceedings- Generation,Transmission and Distribution,1995,142(3),251-256.