电力系统恢复决策优化模型与求解

DOI: 10.13334/j.0258-8013.pcsee.2014.25.024, PP. 4402-4408

Keywords: 电力系统,自愈决策,快速切负荷技术,最优潮流,带约束的最大值最小,内点法

Full-Text   Cite this paper   Add to My Lib

Abstract:

电力系统大停电后系统的快速恢复是电力系统一直以来要解决的重要问题。通过对现有黑启动模型的分析发现,针对全黑情况下启动全网的所有发电机时,现有的最优目标设置和最优问题描述有可能导致一台发电机爬坡而其他发电机等待的现象。为解决这一问题,充分考虑发电机的物理调节特性,提出描述实际问题的变约束的最大值最小的优化模型,并通过引入时间变量t,将变约束的最大值最小优化问题等价为内点法可解的定约束最优潮流(opticalpowerflow,OPF)问题,克服了最优潮流中求解变约束最大值最小问题的难点,提出计及发电机出力特性的电力系统黑启动优化计算策略。IEEE30节点标准系统的仿真结果表明,该方法有效,可明显缩短启动时间。该成果已经成功用于电力系统自愈决策系统软件,在广东电网公司投运。

References

[1]  万秋兰.大电网实现自愈的理论研究方向[J].电力系统自动化,2009,33(17):29-32.Wan Qiulan.Theory study for self-healing of large power grid[J].Automation of Electric Power Systems,2009,33(17):29-32(in Chinese).
[2]  姚金环.对FCB若干问题的探讨[J].中国电力,2007,40(5):59-62.Yao Jinhuan.Discussion on several issues concerning FCB[J].Electric Power,2007,40(5):59-62(in Chinese).
[3]  Adibi M,Clelland P,Fink L,et al.Power system restoration-a task force report[J].IEEE Transactions on Power Systems,1987,2(2):271-277.
[4]  周云海,闵勇,杨滨.黑启动及其决策支持系统[J].电力系统自动化,2001,25(15):43-46.ZhouYunhai,Min Yong,Yang Bin.Decision support system for black-start[J].Automation of Electric Power Systems,2001,25(15):43-46(in Chinese).
[5]  Lindstrom R R.Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation[J].IEEE Transactions on Power Systems,1990,5(1):162-168.
[6]  Ketabi A,Asmar H,Ranjbar A M,et al.An approach for optimal units start-up during bulk power system restoration[C]//2001 Large Engineering Systems Conference on Power Engineering.Halifax,Canada:LESCOPE '01,2001:190-194.
[7]  Hou Yunhe,Liu Chen-Ching,Sun Kai,et al.Computation of milestones for decision support during system restoration[J].IEEE Transactions on Power Systems,2011,26(3):1399-1409.
[8]  周云海,刘映尚,胡翔勇,等.大停电事故后的系统网架恢复[J].中国电机工程学报,2008,28(10):32-36.ZhouYunhai,LiuYingshang,Hu Xiangyong.Power system network reconstruction after blackout [J].Proceedings of the CSEE,2008,28(10):32-36(in Chinese).
[9]  马慧远.考虑恢复序列的电力系统黑启动分区研究[D].保定:华北电力大学,2011.Ma Huiyuan.Research of power system black-start network partitioning considering recovery sequence [D].Baoding:North China Electric Power University,2011(in Chinese).
[10]  顾雪平,钟慧荣,贾京华,等.电力系统扩展黑启动方案的研究[J].中国电机工程学报,2011,21(28):25-32.Gu Xueping,Zhong Huirong,Jia Jinghua,et al.Extended black-start schemes of power systems[J].Proceedings of the CSEE,2011,21(28):25-32(in Chinese).
[11]  Liu Qiang,Shi Libao,Zhou Ming,et al.A new solution to generators start-up sequence during power system restoration[C]//Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies.Nanjing,China:IEEE,2008:2845-2849.
[12]  Liu Chen-Ching,Liou Kan-Lee,Chu R F,et al.Generation capability dispatch for bulk power system restoration:a knowledge-based approach[J].IEEE Transactions on Power Systems,1993,8(1):316-325.
[13]  胡键,郭志忠,刘迎春,等.故障恢复问题和发电机恢复排序分析[J].电网技术,2004,28(18):1-4,15.Hu Jian,Guo Zhizhong,LiuYingchun,et al.Power system restoration and analysis of restoration sequence of generating sets[J].Power System Technology,2004,28(18):1-4,15(in Chinese).
[14]  Sun Wei,Liu Chen-Ching,Zhang Li.Optimal generator start-up strategy for bulk power system restoration [J].IEEE Transactions on Power Systems,2011,26(3):1357-1366.
[15]  张江红,孟宪朋,刘怀东,等.最优潮流算法综述[J].华北电力技术,2010(7):23-26,45.Zhang Jianghong,Meng Xianpeng,Liu Huaidong,et al.A summary of algorithms for optimal power flow[J].North China Electric Power,2010(7):23-26,45(in Chinese).
[16]  池哲浩,张洪梁,赵连杰,等.电力系统最优潮流的计算方法[J].黑龙江电力,2011,33(5):343-345,349.Chi Zhehao,Zhang Hongliang,Zhao Lianjie,et al.Optimal power flow calculation method for electric power system [J].Heilongjiang Electric Power,2011,33(5):343-345,349(in Chinese).
[17]  安宇,王明.电力系统最优潮流分析[J].中国电力教育,2010(16):254-255.An Yu,Wang Ming.Optimal power flow analysis for electric power system[J].China Electric Power Education,2010(16):254-255(in Chinese).
[18]  杨林峰,简金宝,韩道兰,等.基于最优中心参数的多中心校正内点最优潮流算法[J].中国电机工程学报,2012,32(4):136-144.Yang Linfeng,Jian Jinbao,Han Daolan,et al.Multiple centrality corrections interior point optimal power flow algorithm based on optimal centering parameter [J].Proceedings of the CSEE,2012,32(4):136-144(in Chinese).