[1] | Montanari A A,Tavares M C,Portela C M.Secondary arc voltage and current harmonic content for field tests results[C]//2009 International Conference on Power Systems Transients.Kyoto,Japan:CRIEP,2009:150-155.
|
[2] | 谷定燮.1000kV级交流输变电系统过电压与绝缘配合研究[R].武汉:国网武汉高压研究院,2006.谷定燮.Overvoltage suppression and insulation coordination of 1000kV AC transmission lines [R].Wuhan:Wuhan high voltage institute of state grid,2006(in Chinese).
|
[3] | 陈珩.电力系统暂态分析[M].中国电力出版社,2007:50-52.Chen Hang.Power system transit analysis[M].China Electric Power Press,2007:50-52(in Chinese).
|
[4] | 颜湘莲,陈维江,王承玉.长间隙小电流空气电弧动态特性(英文版)[J].电工技术学报,2009,24(11):165-171.Yan Xianglian,Chen Weijiang,Wang Chengyu.Dynamic characters research of air arc at low current in long gap[J].Transactions of China Electrotechical Society,2009,24(11):165-171(in English).
|
[5] | Gu Shanqing,He Jinliang,Zeng Rong,et al.Motion characteristics of long ac arcs in atmospheric air [J].Applied physics letters,2007(90):051501-3.
|
[6] | 李召兄,文俊,徐超,等.特高压同塔双回输电线路的潜供电流[J].电工技术学报,2010,25(11):148-154.Li Zhaoxiong,Wen Jun,Xu Chao,et al.Secondary arc current of UHV do uble-circuit transmission line [J].Transactions of China Electrotechical Society,2010,25(11):148-154(in Chinese).
|
[7] | 孟涛,林莘,徐建源.分段电弧模型下VFTO的计算与分析[J].电工技术学报,2010,25(9):69-73.Meng Tao,Lin Xin,Xu Jianyuan.Calculation of very fast transient over-voltage on the condition of segmental arcing model[J].Transactions of China Electrotechical Society,2010,25(9):69-73(in Chinese).
|
[8] | Terzijia V V,Koglin H J.On the modeling of long arc in still air and arc resistance calculation[J].IEEE Transactions on Power Delivery,2004,19(3):1012-1017.
|
[9] | Johns A T,Aggarwal R K,Song Y H.Improved techniques for modeling fault arcs on faulted EHV tranmission system[J].IEE Proceeding-Generation,Tranmission,Distribution,1994,141(2):148-154.
|
[10] | 吴剑凌,张思,张仪,等.特高压线路采用HSGS限制潜供电流的研究[J].电力系统保护与控制,2010:38(6):52-55.Wu Jianling,Zhang Si,Zhang Yi,et al.Study on secondary arc current of UHV line using HSGS[J].Power System Protection and Control,2010,38(6):52-55(in Chinese).
|
[11] | 秦晓辉,张志强,徐征雄,等.基于准稳态模型的特高压半波长交流输电系统稳态特性与暂态稳定研究[J].中国电机工程学报,2011,31(31):66-76.Qin Xiaohui,Zhang Zhiqiang,Xu Zhengxiong,et al.Study on the steady state characteristic and transient stability of UHV AC half-wave-length[J].Proceedings of the CSEE,2011,31(31):66-76(in Chinese).
|
[12] | Samorodov G,Krasilnikova T,Dikoy V,et al.Nonconventional reliable AC transmission systems for power delivery at long and very long distance[C]// Transmission and Distribution Conference and Exhibition 2002.Yokohama,Japan:IEEE,2002:982-987.
|
[13] | Dos Santos M L,Jardini J A,Casolari RP,et al.Power transmission over long distances:economic comparison between HVDC and half-wavelength line[J].IEEE Transactions on Power Delivery,2013(88):1-7.
|
[14] | Yatsenko R,Samorodov G,Krasilnikova T,et al.Economic and reliable electric tie for energy export from south-yakutia hydro power complex to Korea [J].Power and Electroohvsics,2002:422-425.
|
[15] | 孙珂.特高压半波长交流输电经济性分析[J].电网技术,2011,35(9):51-54.Sun Ke.Economic analysis on UHV half-wavelength AC power transmission[J].Power System Technology,2011,35(9):51-54(in Chinese).
|
[16] | 宋云亭,周霄,李碧辉,等.特高压半波长交流输电系统经济性与可靠性评估[J].电网技术,2011,35(9): 1-6.Song Yunting,Zhou Xiao,Li Bihui,et al.Economic analysis and reliability assessment of UHV half- wavelength AC transmission[J].Power System Technology,2011,35(9):1-6(in Chinese).
|
[17] | 李晓华,罗龙波,谢金泉,等.500kV同塔双回不换位线路潜供电弧对重合闸的影响分析[J].电力系统保护与控制,2013,41(7):97-102.Li Xiaohua,Luo Longbo,Xie Jinquan,et al.Analysis of the impact of un-transposed 500kV double-circuit lines secondary arc on the single phase auto-reclosing[J].Power System Protection and Control,2013,41(7):97-102(in Chinese).
|
[18] | 范李平,袁兆强,张凯.基于小波变换的单相接地故障电弧模型及其PSCAD/EMTDC仿真研究[J].电力系统保护与控制,2011,39(5):51-56.Fan Liping,Yuan Zhaoqiang,Zhang Kai.Simulation on arc model of single phase earth fault and PSCAD/EMTDC based on wavelet transformation [J].Power System Protection and Control,2011,39(5):51-56(in Chinese).
|
[19] | Hamedani Golshan M E,Golbon N.Detecting secondary arc extinction time by analyzing low frequency components of faulted phase voltage or sound phase current waveforms[J].Electrical Engineering,2005(88):141-148.
|
[20] | 曹荣江,朱拱照,崔景春.关于超高压线路上潜供电弧持续现象的研究(第一部分)[J].高电压技术,1975(1):27-77.Cao Rongjiang,Zhu Gongzhao,Cui Jingchun.Research of continuous arcing process of secondary arc on EHV transmission lines(Part I)[J].High Voltage Engineering,1975(1):27-77(in Chinese).
|
[21] | 和彦淼,宋杲,曹荣江,等.1000kV特高压输电线路潜供电弧实验研究[J].中国电机工程学报,2011,31(16):138-143.He Yanmiao,Song Gao,Cao Rongjiang,et al.Test research of secondary arc in 1000kV UHV double-circuit transmission lines[J].Proceedings of the CSEE,2011,31(16):138-143(in Chinese).
|
[22] | 和彦淼,宋杲,曹荣江.特高压同塔双回输电线路潜供电弧模拟试验等价性研究[J].电网技术,2008,32(22): 138-143.He Yanmiao,Song Gao,Cao Rongjiang.The equivalence research for secondary arc simulation test of UHV with double circuit transmission lines[J].Power System Technology,2008,32(22):138-143(in Chinese).
|
[23] | 陈维江,颜湘莲,贺子鸣,等.特高压交流输电线路单相接地潜供电弧仿真[J].高电压技术,2010,1(31):1-6.Chen Weijiang,Yan Xianglian,He Ziming,et al.Simulation for secondary arc caused by single-phase grounding in UHV AC transmission line[J].High Voltage Engineering,2010,1(31):1-6(in Chinese).
|
[24] | Dudurych I M, Gallagher T J, Rosolowski E.Arc effect on single-phase reclosing time of a UHV power transmission line[J].IEEE Transactions on Power Delivery,2004,19(2):854-860.
|
[25] | Goda Y,Matsuda S,Inaba T,et al.Forced extinction characteristics of secondary arc on UHV transmission lines[J].IEEE Transactions on Power Delivery,1993,8(3):1322-1330.
|