Gu Yujiong,Dong Yuliang,Yang Kun.Synthetic evaluation on condition of equipment in power plant based on fuzzy judgment and RCM analysis[J].Proceedings of the CSEE,2004,24(6):189-194(in Chinese).
Xu Wei, Hu Weiming, Sun Peng. Equipment reliability prediction based on dual-parametric Weibull distribution [J].Proceedings of the CSEE,2013,11(2):112-116(in Chinese).
Wen Yanqing,Liu Baoliang. The parameter estimation of Weibull distribution under the condition of completed data[J].Journal of Shanxi Datong University,2009,25(4):17-19(in Chinese).
Yu Xiaohong, Zhang Laibin, Wang Chaohui, et al. The reliability analysis of equipment life based on the new parameter estimation method of Weibull distribution [J].Mechanical Strength,2007,29(6):932-936(in Chinese).
[9]
黄平,孟永钢.最优化理论与方法[M].北京:清华大学出版社,2008,76-78.
[10]
Huang Ping,Meng Yonggang.Optimization theories and methods[M].Beijing:Tsinghua University Press,2008,76-78(in Chinese).
[11]
Jesse A A.Maintenance optimisation for wind turbines [D].Aberdeen:The Robert Gordon University.2008.
[12]
Poore R,Walford C.Development of an operations and maintenance cost model to identify cost of energy savings for low wind speed turbines[R].Washington:National Renewable Energy Laboratory,2008.
[13]
Tian Zhigang,Jin Tongdan,Wu Bairong,et al.Condition based maintenance optimization for wind power generation systems under continuous monitoring [J].Renewable Energy,2011,36(5):1502-1509.
[14]
左洪福,蔡景,王华伟,等.维修决策理论与方法[M].北京:航空工业出版社,2008:41-50.
[15]
Zuo Hongfu,Cai Jing,Wang Huawei,et al.Maintenance decision theory and method[M].Beijing:Aviation Industry Press,2008:41-50(in Chinese).
[16]
吴佳梁,王广良,魏振山,等.风力机可靠性工程[M].北京:北京化工出版社,2010:72-74.
[17]
Wu Jialiang,Wang Guangliang,Wei Zhenshan,et al.Reliability engineering of wind turbine[M].Beijing:Chemical Industry Press,2010::::72-74(in Chinese).
[18]
Khairy A H Kobbacy, Prabhakar Murthy D N.Complex System Maintenance Handbook[M].London:British Library Cataloguing in Publication Data,2008:264-268.
[19]
Zhijun Cheng,Zheng Yang,Bo Guo.Opportunistic maintenance optimization of a two-unit system with different unit failure patterns[C]// IEEE 2012 International Conference.Chengdu:Quality,Reliability,Risk, Maintenance and Safety Engineering (ICQR2MSE), 2012:409-412.
Zhao Hongshan,Yan Shengteng,Liu Jingqing.Optimi- zation maintenance of wind turbine based on opportunistic maintenance model[J].Power System and Clean Energy,2012,28(7):1-5(in Chinese).
[22]
Nicolai R P,Dekker R.Optimal maintenance of multi- component systems: a review[R].Rotterdam:Econometric Institute Report,2008.
[23]
Berg M.Optimal replacement policies for two unit machines with increasing running costs[J].Stochastic Processes and Applications,1976,4(1):89-106.
[24]
Huang Jiansheng.Preventive replacement/maintenance program development and evaluation for multi-unit systems with dependency: stochastic modeling and simulation study[D].America:University of South Florida,1993.
[25]
Andreasson N.Optimization of opportunistic replacement activities in deterministic and stochastic multi-component systems[D].Sweden:Chalmers University of Technology and Gothenburg University Goteborg,2004.
[26]
鄢盛腾.基于机会维修模型的的风电机组优化维修[D].保定:华北电力大学,2012.
[27]
Yan Shengteng.Optimization maintenance of wind turbine based on opportunistic maintenance model [D].Baoding: North China Electric Power University,2012(in Chinese).
Cao Zhongzhong,Yang Kun,Gu Yujiong,et al,Quantitative RCM analyzing method for feed pump units in power plant[J].Proceedings of the CSEE,2003,23(9):207-211(in Chinese).