Bertsimas D,Litvinov E,Sun X A,et al.Adaptive robust optimization for the security constrained unit commitment problem[J].IEEE Trans. on Power Systems,2013,28(1):52-63.
[2]
Ding T,Bo R,Gu W,et al.Absolute value constraint based method for interval optimization to SCED model[J].IEEE Trans. on Power Systems,2014,29(2):980-981.
[3]
Zimmerman R D,Murillo-Sánchez C E,Thomas R J.MATPOWER:steady-state operations, planning, and analysis tools for power systems research and education [J]. IEEE Transactions on Power Systems,2011,26(1): 12-19.
Morales J M,Perez R J.Point estimate schemes to solve the probabilistic power flow[J].IEEE Trans. on Power Systems,2013,28(2):1550-1559.
[6]
Hajian M,Rosehart W D,Zareipour H.Probabilistic power flow by Monte Carlo simulation with Latin supercube sampling[J].IEEE Trans. on Power Systems,2007,22(4):1594-1601.
[7]
Miranda V,Saralva J T.Fuzzy modelling of power system optimal load flow[J].IEEE Trans. on Power Systems,1992,7(2):843-849.
Ding Tao,Cui Haotao,Gu Wei,et al.Uncertain power flow based on interval and affine arithmetic [J].Automation of Electric Power Systems,2012,36(13):51-55(in Chinese).
Wang Shouxiang,Wu Zhifeng,Wang Chengshan.Interval algorithm of DC power flow considering uncertainty in power systems[J].Automation of Electric Power Systems,2007,31(5):18-22(in Chinese).
[12]
Zhang H,Li P.Probabilistic analysis for optimal power ?ow under uncertainty[J].IET Generation,Transmission & Distribution,2010,4(5):553-561.
[13]
Yu H,Rosehart W D.An optimal power flow algorithm to achieve robust operation considering load and renewable generation uncertainties[J].IEEE Trans. on Power Systems,2012,27(4):1808-1817.
[14]
Lee J,Kim J H,Joo S K.Stochastic method for the operation of a power system with wind generators and superconducting magnetic energy storages(SMESs) [J].IEEE Transactions on Applied Superconductivity,2011,21(2):2144-2148.
[15]
Zhang Hui,Li P.Chance constrained programming for optimal power flow under uncertainty[J].IEEE Trans. on Power Systems,2011,26(4):2417-2424.
[16]
Wang Y,Xia Q,Kang C Q.Unit commitment with volatile node injections by interval optimization[J].IEEE Trans. on Power Systems,2011,26(3):1705-1713.
[17]
Saric A T,Stankovic A M.An application of interval analysis and optimization to electric energy markets [J].IEEE Trans. on Power Systems,2006,21(2):515-523.
[18]
Chinneck J W,Ramadan K.Linear programming with interval coefficients[J].Journal of the Operational Research Society,2000(51):209-220.
[19]
Al-Khayyal F A,Larsen V,Voorhis T V.A relaxation method for nonconvex quadratically constrained quadratic programs[J].Journal of Global Optimization,1995,6:215-230.
[20]
Linderoth J.A simplicial branch and bound algorithm for solving quadratically constrained quadratic programs [J].Math Programs,2005,103(2):251-282.
[21]
Raber U.A simplicial branch and bound method for solving nonconvex all quadratic programs[J].Journal of Global Optimization,1998(13):417-432.
[22]
张伯明,陈寿孙,严正.高等电力网络分析[M].北京:清华大学出版社,2007:210-214.
[23]
Zhang Boming,Chen Shousun,Yan Zheng.Advanced power network analysis[M].Beijing:Tsinghua University Press,2007:210-214(in Chinese).