多电网调峰负荷分配问题的目标函数选取与求解

DOI: 10.13334/j.0258-8013.pcsee.2014.22.013, PP. 3683-3690

Keywords: 调峰,多电网,负荷分配,目标函数,邻域搜索算法

Full-Text   Cite this paper   Add to My Lib

Abstract:

References

[1]  杨宏,刘建新,苑津莎.风电系统中常规机组负调峰能力研究[J].中国电机工程学报,2010,30(16):26-31.
[2]  Yang Hong,Liu Jianxin,Yuan Jinsha.Research of peak load regulation of conventional generators in wind power grid[J].Proceedings of the CSEE,2010,30(16):26-31(in Chinese).
[3]  赵洁,刘涤尘,雷庆生,等.核电机组参与电网调峰及与抽水蓄能电站联合运行研究[J].中国电机工程学报,2011,31(7):1-6.
[4]  Zhao Jie,Liu Dichen,Lei Qingsheng,et al.Analysis of nuclear power plant participating in peak load regulation of power grid and combined operation with pumped storage power plant[J].Proceedings of the CSEE,2011,31(7):1-6(in Chinese).
[5]  何光宇,王稹,裴哲义,等.三峡电力系统调峰问题的研究[J].电网技术,2003,27(10):12-16.
[6]  He Guangyu,Wang Zhen,Pei Zheyi,et al.Peak-load dispatching of Three Gorges power system[J].Power System Technology,2003,27(10):12-16(in Chinese).
[7]  唐海华,陈森林,赵宇.三峡梯级电站短期优化调度模型及算法[J].水电能源科学,2008,26(3):133-136.
[8]  Tang Haihua,Chen Senlin,Zhao Yu.Model and algorithm of short-term optimal scheduling of Three Gorges cascaded hydropower stations[J].Water Resources and Power,2008,26(3):133-136(in Chinese).
[9]  武新宇,程春田,申建建,等.大规模水电站群短期优化调度方法(III):多电网调峰问题[J].水利学报,2011,43(1):31-42.
[10]  Wu Xinyu,Cheng Chuntian,Shen Jianjian,,et al.Short-term optimal operation methods of large-scale hydropower plants(III):solution method of peak load regulation for multi power grids[J].Journal of Hydraulic Engineering,2011,43(1):31-42(in Chinese).
[11]  张运洲.我国跨区域电力资源配置前景分析[J].中国电力,2004,37(9):5-7.
[12]  Zhang Yunzhou.Prospect analysis of cross-regional power resource disposition[J].Electric Power,2004,37(9):5-7(in Chinese).
[13]  范明天,张祖平,杨少勇,等.具有抽水蓄能电厂的多区域电网日经济调度研究[J].电网技术,2000,24(8):57-61.
[14]  Fan Mingtian,Zhang Zuping,Yang Shaoyong,et al.Economic dispatch of multi-regional power network involving pump storage plants[J].Power System Technology,2000,24(8):57-61(in Chinese).
[15]  尹明万.三峡梯级水电站汛期日运行方式优化[J].水利学报,1998,29(2):79-83.
[16]  Yin Mingwan.Optimization of the daily operation of the Three Gorges cascade hydroelectric station in flood season[J].Journal of Hydraulic Engineering,1998,29(2):79-83(in Chinese).
[17]  喻杉,纪昌明,张验科,等.基于负荷曲线的水电站群短期运行效益研究[J].水电能源科学,2012,30(2):56-59.
[18]  Yu Shan,Ji Changmin,Zhang Yanke,et al.Short-term operation benefit analysis of cascade hydropower stations based on load curve[J].Water Resources and Power,2012,30(2):56-59(in Chinese).
[19]  Cheng Chuntian,Shen Jianjian,Wu Xinyu,et al.Short-Term hydro scheduling with discrepant objectives using multi-step progressive optimality algorithm1[J].Journal of the American Water Resources Association,2012,48(3):464-479.
[20]  Cheng Chuntian,Shen Jianjian,Wu Xinyu.Short-term scheduling for large-scale cascaded hydropower system with multi-vibration zones of high head[J].Journal of Water Resources Planning and Management,2011,138(3):257-267.
[21]  王鹏,张灵凌,梁琳,等.火电机组有偿调峰与无偿调峰划分方法探讨[J].电力系统自动化,2010,34(9):87-90.
[22]  Wang Peng,Zhang Lingling,Liang Lin,et al.A method for division of paid peak-regulation and free peak-regulation for thermal power units[J].Automation of Electric Power Systems,2010,34(9):87-90(in Chinese).
[23]  高山,单渊达.遗传算法搜索优化及其在机组启停中的应用[J].中国电机工程学报,2001,21(3):45-48.
[24]  Gao Shan,Shan Yuanda.Advanced genetic algorithm approach to unit commitment with searching optimization[J].Proceedings of the CSEE,2001,21(3):45-48(in Chinese).
[25]  陆建宇,王强,申建建,等.华东电网直调多电源短期联合优化调度方法[J].华东电力,2013,41(5):931-937.
[26]  Allan D W.Statistics of atomic frequency standards[J].Proceedings of the IEEE,1966,54(2):221-230.
[27]  Lu Jianyu,Wang Qiang,Shen Jianjian,et al.Optimized direct dispatching method for East China Grid with multi-power short-term joint[J].East China Electric Power,2013,41(5):931-937(in Chinese).
[28]  Elena D,Michel M D.Encyclopedia of Distances[M].Berlin Heidelberg:Springer Press,2009:94-96.
[29]  唐焕文,秦学志.实用最优化方法[M].大连:大连理工大学出版社,2005:252-256.
[30]  Tang Huanwen,Qin Xuezhi.Practical methods of optimization[M].Dalian:Dalian University of Technology Press,2005:252-256(in Chinese).
[31]  Ahuja,Ravindra K,Özlem E,et al.A survey of very large-scale neighborhood search techniques[J].Discrete Applied Mathematics,2002,123(1):75-102.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133