Tuan L A,Bhattacharya K.Competitive framework for procurement of interruptible load services[J].IEEE Transactions on Power Systems,2003,18(2):460-465.
[2]
Huang K Y,Chin H C,Huang Y C.A model reference adaptive control strategy for interruptible load management[J].IEEE Transactions on Power Systems,2003,19(1):683-689.
[3]
Huang K,Huang Y.Integrating direct load control with interruptible load management to provide instantaneous reserves for ancillary services[J].IEEE Transactions on Power Systems,2004,19(3):1626-1634.
Yao Jianguo,Yang Shengchun,Wang Ke,et al.Concept and research framework of smart grid “source-grid-load” interactive operation and control[J].Automation of Electric Power Systems,2012,36(21):1-6(in Chinese).
[6]
刘晓.新能源电力系统广域源荷互动调度模式理论研究[D].华北电力大学,2012.
[7]
Liu Xiao.Theoretical study on wide area source and load interactive scheduling mode of new energy power system[D].North China Electric Power University,2012(in Chinese).
[8]
Callaway D S,Hiskens I A.Achieving controll ability of loads[J].Proceedings of the IEEE,2011,99(1):184-199.
Fan Gaofeng,Wang Weisheng,Liu Chun,et al.Wind power prediction based on artificial neural network[J].Proceedings of CSEE,2008,28(34):118-123(in Chinese).
Li Zhi,Han Xueshan,Han Li,et al.An ultra-short-term wind power forecasting method in regional grids[J].Automation of Electric Power Systems,2010,34(7):90-94(in Chinese).
Wang Jian,Yan Gangui,Song Wei,et al.Review of wind power prediction[J].Journal of Northeast China Institute of Electric Power Engineering,2011,31(3):20-24(in Chinese).
Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.Optimal real power flow in wind power integrated system[J].Power System Technology,2002,26(6):18-21(in Chinese).
Ai Xin,Liu Xiao.Dynamic economic dispatch for wind farms integrated power system based on credibility theory[J].Proceedings of the CSEE,2011,31(s):12-18(in Chinese).
Chen Haiyan,Chen Jinfu,Duan Xianzhong.Fuzzy modeling and optimization algorithm on dynamic economic dispatch in wind power integrated system[J].Automation of Electric Power Systems,2006,30(2):22-26(in Chinese).
[23]
Liang Ruey-Hsun,Liao Jianhao.A fuzzy optimization approach for generation scheduling with wind and solar energy systems[J].IEEE Transactions on Power Systems,2007,22(4):1665-1674.
Wang Hongtao,He Chengming,Fang Guanghua,et al.A Gradual optimization model of dispatching schedule taking account of wind power prediction error bands[J].Automation of Electric Power Systems,2011,35(22):131-135(in Chinese).
Yao Yao,Yu Jilai.Multi-objective hybrid optimal dispatch of power systems considering reserve risk due to wind power[J].Automation of Electric Power Systems,2011,35(22):118-124(in Chinese).
Zhang Boming,Wu Wenchuan,Zheng Taiyi,et al.Design of a multi-time scale coordinated active power dispatching system for accommodating large scale wind power penetration[J].Automation of Electric Power Systems,2011,35(1):1-5(in Chinese).
Zhang Na,Lü Quan,Zhang Xian,et al.A multi-level unit commitment coordinated strategy for power system with wind power[J].Automation of Electric Power Systems,2013,37(11):39-45(in Chinese).
[32]
Li Fangxing,Wei Yanli.A probability-driven multilayer framework for scheduling intermittent renewable energy[J].IEEE Transactions on Sustainable Energy,2012,3(3):455-464.
Zhang Guoqiang,Zhang Boming,Wu Wenchuan.Coordinated roll generation scheduling considering wind power integration[J].Automation of Electric Power Systems,2011,35(19):18-22(in Chinese).
[35]
Galus M D,Stephan K,Göran Andersson.Provision of load frequency control by PHEVs,controllable loads,and a cogeneration unit[J].IEEE Transactions on Industrial Electronics,2011,58(10):4568-4582.
Tan Jinjing,Wang Beibei,Li Yang.Modeling of user response to time-of-use price based on multi-agent technology[J].Power System Technology.2012,36(2):257-263(in Chinese).
[38]
Le Xie,Joo J Y,Ilic M D.Integration ofintermittent resources with price:responsive loads[C]//41st North American Power SymposiuIn.USA:IEEE Computer Society,2009:1-6.
[39]
Hamidi V,Li F,Robinson F.The effect of responsive demand in domestic sector on power system operation in the networks with high penetration of renewables[C]// IEEE Power and Energy Society General Meeting.USA:Inst. of Elec. and Elec. Eng. Computer Society,2008:1-8.
[40]
Callaway Duncan S.Tapping the energy storage potential in electric loads to deliver load following and regulation with application to wind energy[J].Energy Conversion and Management,2009,50(5):1389-1400.
Liu Xiaocon,Wang Beibei,Li Yang,et al.Day-ahead generation scheduling model considering demand side interaction under smart grid paradigm[J].Proceedings of the CSEE,2013,33(1):30-39(in Chinese).
Wang Beibei,Liu Xiaocong,Li Yang.Day-ahead generation scheduling and operation simulation considering demand response in large-capacity wind power integrated systems[J].Proceedings of the CSEE,2013,33(22):35-44(in Chinese).
Zhu Lingzhi,Chen Ning,Han Hualing.Key problems and solutions of w ind power accommodation[J].Automation of Electric Power Systems,2011,35(22):29-34(in Chinese).
[47]
Ackermann T.Wind power in power system[M].London,UK:John Wiley&Sons,2005:365-381.
[48]
风电并网运行报告[R].北京:国家电网公司,2009.
[49]
Report on integration of wind power in the power system[R].Beijing:State Grid Corporation of China,2009(in Chinese).
Zhang Liying,Ye Tinglu,Xin Yaozhoug,et al.Problems and measures of power grid accommodating large scale wind power[J].Proceedings of the CSEE,2010,30(25):1-9(in Chinese).
Wang Songyan,Li Bijun,Yu Jilai1,et al.Analysis on time-varying characteristics of probability error in forecast of wind speed and wind power[J].Power System Technology.2013,37(4):967-973(in Chinese).