全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

台湾实施可中断电价进行削峰填谷的需求响应策略及其成本效益分析

DOI: 10.13334/j.0258-8013.pcsee.2014.22.005, PP. 3615-3622

Keywords: 可中断电价,削峰填谷,需求侧管理,电力市场,可靠性效益

Full-Text   Cite this paper   Add to My Lib

Abstract:

References

[1]  杨阳,张粒子,王沈征.考虑用电能效的负荷控制优化策略及模型[J].电力系统自动化,2012,36(18):103-107.
[2]  Yang Yang,Zhang Lizi,Wang Shenzheng.Optimization strategy and model of load control considering power consumption efficiency[J].Automation of Electric Power Systems,2012,36(18):103-107(in Chinese).
[3]  Hsu Y Y,Wu C J,Lee L K,et al.Design and implementation of an air-conditioning system with storage tank for load shifting[J].IEEE Transactions on Power Systems,1987,2(4):973-979.
[4]  Sheen J N,Chen C S,Yang J K.Time-of-use pricing for load management programs in Taiwan Power Company [J].IEEE Transactions on Power Systems,1994,9(1):388-396.
[5]  Sheen J N,Chen C S,Wang T Y.Response of large industrial customers to electricity pricing by voluntary time-of-use in Taiwan[J].IEE Proceedings-Generation,Transmission and Distribution,1995,142(2):157-166.
[6]  Chu Wenchen,Chen Yiping,Lin Tzuhao.The competitive model based on the demand response in the off-peak period for the taipower system[J].IEEE Transactions on Industry Applications,2008,44(4):1303-1307.
[7]  Chang-Chien Leren,An L N,Lin T W,et al.Incorporating demand response with spinning reserve to realize an adaptive frequency restoration plan for system contingencies[J].IEEE Transactions on Smart Grid,2012,3(3):1145-1153.
[8]  吴再益,吴秀婉,陈玟如,等.电力市场自由化下需量反应制度之可行性研究[R].台北:台湾综合研究院,2004.
[9]  Wu Tsiayi,Wu Hsiuwan,Chen Wenru,et al.The feasibility of demand response in a liberalized power market[R].Taipei:Taiwan Research Institute,2004(in Chinese).
[10]  李成仁.电力市场中可中断电价机制设计[J].能源技术经济,2012,24(4):11-15.
[11]  Li Chengren.Design of interruptible electricity pricing mechanism in power market[J].Energy Technology and Economics,2012,24(4):11-15(in Chinese).
[12]  周渝慧.论组合电价在国家能源战略中的平衡机理[J].中国能源,2004,26(7):21-23.
[13]  Zhou Yuhui.The balance mechanism of combined electrical power tariffs in state energy strategy[J].Energy of China,2004,26(7):21-23(in Chinese).
[14]  宋宏坤.台湾电力公司如何利用电价杠杆解决高峰电力紧缺问题[J].电力需求侧管理,2003,5(2):61-64.
[15]  Song Hongkun.How does taiwan power company take advantage of rates to solve the problem of power shortage[J].Power Demand Side Management,2003,5(2):61-64(in Chinese).
[16]  胡兆光,纪洪,赵磊.需求侧管理在北京地区移峰填谷中的应用[J].中国电力,1998,31(9):37-40.
[17]  Hu Zhaoguang,Ji Hong,Zhao Lei.Application of demand side management to peak load leveling in Beijing [J].Electric Power,1998,31(9):37-40(in Chinese).
[18]  谭忠富,谢品杰,王绵斌,等.提高电能使用效率的可中断电价与峰谷分时电价的联合优化设计[J].电工技术学报,2009,24(5):161-168.
[19]  Tan Zhongfu,Xie Pinjie,Wang Mianbin,et al.The optimal design of integrating interruptible price with peak-valley time-of-use power price based on improving electricity efficiency[J].Transactions of China Electrotechnical Society,2009,24(5):161-168(in Chinese).
[20]  Yu C W,Zhang S,Chung T S,et al.Modelling and evaluation of interruptible-load programmes in electricity markets[J].IEE Proceedings of Generation,Transmission and Distribution,2005,152(5):581-588.
[21]  王建学,王锡凡,王秀丽.电力市场可中断负荷合同模型研究[J].中国电机工程学报,2005,25(9):11-16.
[22]  Wang Jianxue,Wang Xifan,Wang Xiuli.Study on model of interruptible load contract in power market [J].Proceedings of the CSEE,2005,25(9):11-16(in Chinese).
[23]  张钦,王锡凡,王建学,等.电力市场下需求响应研究综述[J].电力系统自动化,2008,32(3):97-106.
[24]  Zhang Qin,Wang Xifan,Wang Jianxue,et al.Survey of demand response research in deregulated electricity markets[J].Automation of Electric Power Systems,2008,32(3):97-106(in Chinese).
[25]  林子皓.台电系统离峰需量反应及其竞标机制模式之建立[D].台北:台湾大同大学,2007:1-2.
[26]  Lin Zihao.The competitive model based on the demand response in the off-peak load period for Tai power system[D].Taipei:Tatung University,2007:1-2(in Chinese).
[27]  孙元章,周家启.大型互联电网在线运行可靠性的基础理论[M].北京:清华大学出版社,2010:166.
[28]  Sun Yuanzhang,Zhou Jiaqi.Large interconnected power system operational reliability basic theory[M].Beijing:Tsinghua University Press,2010:166(in Chinese).
[29]  唐捷,任震,高志华,等.峰谷分时电价的成本效益分析模型及其应用[J].电网技术,2007,31(6):61-66.
[30]  Tang Jie,Ren Zhen,Gao Zhihua,et al.Cost-benefit analysis model and its application of peak-valley time-of-use electricity price[J].Power System Technology,2007,31(6):61-66(in Chinese).
[31]  谭忠富,王绵斌,乞建勋,等.峰谷分时电价优化模型及其模糊求解方法[J].系统工程理论与实践,2008(9):145-151.
[32]  Tan Zhongfu,Wang Mianbin,Qi Jianxun,et al.Time-of- use price optimizing model and fuzzy solving method [J].Systems Engineering-Theory & Practice,2008(9):145-151(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133