中国可再生能源协会风能专业委员会.2012年中国风电装机容量统计[R].北京:中国可再生能源协会风能专业委员会,2013. Chinese Wind Energy Association(CWEA).Chinese wind power capacity assessment in 2012[R].Beijing: Chinese Wind Energy Association,2013(in Chinese).
[2]
吴俊玲.大型风电场并网运行若干技术问题研究[D].北京:清华大学,2004. Junling Wu.Research on technology problems of large grid-connected wind farm[D].Beijing:Tsinghua University,2004(in Chinese).
[3]
张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158. Ning Zhang,Tianrui Zhou,Duan Changgang,etc.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
[4]
张丽英,叶廷路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,30(25):1-9. Zhang Liying,Ye,Tinglu Xin Yaozhong,et al.Problems and measures of power grid accommodating large scale wind power[J].Proceedings of the CSEE,2010,30(25):1-9(in Chinese).
[5]
程时杰,余文辉,文劲宇,等.储能技术及其在电力系统稳定控制中的应用[J].电网技术,2007,31(20):97-108. Cheng Shijie,Yu Wenhui,Wen Jinyu,et al.Energy storage and its application in power system stability enhancement [J].Power System Technology,2007,31(20):97-108(in English).
[6]
Ted K A Brekken,Alex Yokochi,Annette von Jouanne,et al.Optimal energy storage sizing and control for wind power applications[J].IEEE Transactions on Sustainable Energy,2011,2(1):69-77.
[7]
Chen,Haisheng Thang Ngoc Cong,Yang Wei,et al.Progress in electrical energy storage system:A critical review[J].Progress in Natural Science,2009,19(3):291-312.
[8]
韩涛,卢继平,乔梁,等.大型并网风电场储能容量优化方案[J].电网技术,2010,34(1):169-173. Han Tao,Lu Jiping,Qiao Liang,et al.Optimized scheme of energy-storage capacity for grid-connected large-scale wind farm[J].Power System Technology,2010,34(1):169-173(in Chinese).
[9]
王成山,于波,肖峻,等.平滑可再生能源发电系统输出波动的储能系统容量优化方法[J].中国电机工程学报,2012,32(16):1-8. Wang Chengshan,Yu Bo,Xiao Jun,et al.Sizing of energy storage systems for output smoothing of renewable energy systems[J].Proceedings of the CSEE,2012,32(16):1-8(in Chinese).
[10]
Juan I Perez-Diaz,Alejandro Perea,Jose R Wilhelmi.Optimal short-term operation and sizing of pumped-storage power plants in system with high penetration of wind energy[C]//Proceedings of 2010 7th International Conference on the European.Madrid:Energy Market,2010:1-6.
[11]
Yasser Moustafa Atwa,El-Saadany E F.Optimal allocation of ESS in distribution systems with a high penetration of wind energy[J].IEEE Transactions on Power Systems,2010,25(4):1815-1822.
[12]
Sercan Teleke,Mesut E Baran,Subhashish Bhattacharya,et al.Optimal control of battery energy storage for wind farm dispatching[J].IEEE Transactions on Energy Conversion,2010,25(3):787-794.
[13]
Suzuki R,Hayashi Y,Fujimoto Y.Determination method of optimal planning and operation for residential PV system and storage battery based on weather forecast[C]// Proceedings of IEEE International Conference on Power and Energy.Kota Kinabalu:IEEE PES Committee,2012:343-347.
[14]
Zheng Y,Dong Z Y,Luo F J,et al.Optimal allocation of energy storage system for risk mitigation of DISCOs with high renewable penetrations[J].IEEE Transactions on Power Systems,2014,29(1):212-220.
[15]
Bahramirad.S,Daneshi.H.Optimal sizing of smart grid storage management system in a micro-grid[C]// Proceedings of Innovative Smart Grid Technologies (ISGT).Washington DC:IEEE PES Committee,2012:1-7.
[16]
刘红英.多层规划的理论与算法研究[D].西安:西安电子科技大学,2000. Liu Hongying.Study on the theory and algorithms of multilevel programming problem[D].Xi’an:Xidian University,2000(in Chinese).
[17]
王广民,万仲平,王先甲.二(双)层规划综述[J].数学进展,2007,36(5):513-529. Wang Guangmin,Wan Zhongping,Wang Xianjia. Bibliography on bilevel programming[J].Advances in Mathematics,2007,36(5):513-529(in Chinese).
[18]
刘红英.多层规划和多目标规划的讨论[J].应用数学,2002,15:186-190. Liu Hongying.Research on the relation between multi- level programming and multi-objective programming [J].Mathematica Applicata,2002,15:186-190(in Chinese).
[19]
陈宝林.最优化理论与算法[M].二版.北京:清华大学出版社,2009:246-253. Chen Baoling.Optimization theory and algorithms [M].Second Edition.Beijing:Tsinghua University Press,2009 :246-253(in Chinese).
[20]
Miguel Carrion,Jose M Arroyo.A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J].IEEE Transactions on Power Systems,2006,21(3):1371-1378.
[21]
玄光男,程润伟.遗传算法与工程优化[M].北京:清华大学出版社,2004:1-30. Xuan Guangnan,Chen Runwei.Genetic algorithms and engineering optimization[M].Beijing:Tsinghua University Press,2004:1-30(in Chinese).