Abstract:

依据计算机、网络、通信等技术当前和未来可能的发展,从计算机及网络、相关计算数学和计算模式这3个方面,探讨和预测了新的先进计算技术(如云计算等)及其在电力系统仿真分析中的应用.新能源变革形势下,为适应智能电网的发展,未来的电力系统仿真分析技术在准确性、快速性、灵活性等方面将得到极大提升.

References

[1]  Wang Lei,Morison K.Implementation of online security assessment[J].IEEE Power & Energy Magazine,2006,4(5):47-59.
[2]  RTDS Technologies Inc..RTDS handbook[R].Manitoba,Canada:RTDS Technologies Inc.,2007.
[3]  严剑峰,于之虹,田芳,等.电力系统在线动态安全评估和预警系统[J].中国电机工程学报,2008,28(34):87-93. Yan Jianfeng,Yu zhihong,Tian fang,et al.Dynamic security assessment & early warning system of power system[J].Proceedings of the CSEE,2008,28(34):87-93 (in Chinese).
[4]  田芳,李亚楼,周孝信,等.电力系统全数字实时仿真装置[J].电网技术,2008,32(22):17-22. Tian Fang,Li Yalou,Zhou Xiaoxin,et al.Advanced digital power system simulator[J].Power System Technology,2008,32(22):17-22(in Chinese).
[5]  Varshney S,Srivastava L,Pandit M.ANN based integrated security assessment of power system using parallel computing[J].International Journal of Electrical Power & Energy Systems,2012,42(1):49-59.
[6]  李兢,沈沉,陈颖,等.基于自校正控制的电力系统分布式计算[J].电力系统自动化,2010,34(10):18-23. Li Jing,Shen Chen,Chen Ying,et al.Application of the self-tuning control method to distributed computing of power systems[J].Automation of Electric Power Systems,2010,34(10):18-23(in Chinese).
[7]  张海波,蒋良敏,陶文伟,等.实用化分布式动态潮流计算系统的设计与实现[J].电力系统自动化,2008,32(2):11-15,44. Zhang Haibo,Jiang Liangmin,Tao Wenwei,et al.Design and implementation of a practical distributed power flow calculation system[J].Automation of Electric Power Systems,2008,32(2):11-15,44(in Chinese).
[8]  程新功,厉吉文,曹立霞,等.电力系统最优潮流的分布式并行算法[J].电力系统自动化,2003,27(24):23-27. Cheng Xingong,Li Giwen,Cao Lixia,et al.Distributed parallel computing method of power system OPF [J].Automation of Electric Power Systems,2003,27(24):23-27(in Chinese).
[9]  王成山,张家安.暂态稳定分布式仿真计算的改进算法[J].电力系统自动化,2004,28(14):28-32. Wang Chengshan,Zhang Jiaan.An improved distributed simulation and computing algorithm for transient stability [J].Automation of Electric Power Systems,2004,28(14):28-32(in Chinese).
[10]  李芳.电力系统小干扰稳定分布式并行算法研究[D].北京:中国电力科学研究院,2006. Li Fang.Study on distributed parallel computing method for power system small signal stability[D].Beijing:China Electric Power Research Institute,2006(in Chinese).
[11]  Shahidehpour M,Wang Yaoyu.Communication and control in electric power systems:applications of parallel and distributed processing[M].Piscataway,NJ,USA:IEEE Press,2003:47-56.
[12]  Korres G N,Contaxis G C.Application of a reduced model to a distributed state estimator[C]//Proceedings of 2000 IEEE Power Engineering Society Winter Meeting.Singapore:IEEE PES,2000:999-1004.
[13]  郭秀云,李惠琴,梁建明,等.机电系统建模方法综述[J].机电工程技术,2005,34(12):13-16,26. Guo Xiuyun,Li Huiqin,Liang Jianming,et al.Mechatronics system modeling method review [J]. Mechatronics Engineering Technology,2005,34(12):13-16,26(in Chinese).
[14]  侯涛.电力系统中的人工智能方法及其应用[J].云南电力技术,2004,32(2):59-60,62. Hou Tao.Artificial intelligence method and its application in electric power system[J].Yunnan Electric Power,2004,32(2):59-60,62 (in Chinese).
[15]  陈楷,刘轶,王卉.基于人工智能的电力调度决策支持系统研究[J].中国电力教育,2010(30):247-248. Chen Kai,Liu Yi,Wang Hui.Study on power dispatching decision support system based on artificial intelligence [J].China Electric Power Education,2010(30):247-248 (in Chinese).
[16]  宋云亭.发输电合成系统可靠性综合评估的智能模型和算法研究[D].北京:清华大学,2003. Song Yunting.Study on intelligent model and algorithm of reliability comprehensive evaluation of composite power system[D].Beijing:Tsinghua University(in Chinese).
[17]  张卓.电力参数测量模型及实时测量系统的研究[D].南京:河海大学,2005. Zhang Zhuo.Study on power parameter measuring model and real-time measuring system[D].Nanjing:Hohai University(in Chinese).
[18]  伍双喜,吴文传,张伯明,等.用PMU实测数据辨识同步发电机参数的关键问题[J].电力系统自动化,2012,36(17):50-55. Wu Shuangxi, Wu Wenchuan, Zhang Boming,et al.Key issues of synchronous generator parameter identification using PMU measurements[J].Automation of Electric Power Systems,2012,36(17):50-55(in Chinese).
[19]  EPRI.提供给美国国家标准技术研究院的有关智能电网互操作性标准蓝图的报告[2009中文版][R].2009,http://www.doc88.com/p-53741141703.html. EPRI.Report on smart grid interoperability standard blueprint to USA National Standard Technology Institute[R].2009.http://www.doc88.com/p-53741141703.html(in Chinese).
[20]  曾沅.智能电网研究现状与发展趋势[R].2010.http:// wenku.baidu.com/view/c0e012687e21af45b307a8a2.html. Zeng Yuan.Smart grid research status and development trend[R].2010.http://wenku.baidu.com/view/c0e012687e21af45b307a8a2.html(in Chinese).
[21]  Zhou Ning,Huang Zhenyu,Jarek N,et al.Wide-area situational awareness of power grids with limited phasor measurements[C]//Proceeding of Third International Conference on Critical Infrastructures.Alexandria,VA:IEEE PES,2006:207-213.
[22]  汤涌.基于电机参数的同步电机模型[J].电网技术,2007,31(12):47-51. Tang Yong.A discussion about standard parameter models of synchronous machine[J].Power System Technology,2007,31(12):47-51(in Chinese).
[23]  郑晓雨,贺仁睦,马进.逐步多元回归法在负荷模型扩展中的应用[J].中国电机工程学报,2011,31(4):72-77. Zheng Xiaoyu,He Renmu,Ma Jin.Application of stepwise multiple regression to load model extension [J].Proceedings of the CSEE,2011,31(4):72-77(in Chinese).
[24]  U.S.-Canada Power System Outage Task Force.Final report on the August 14, 2003 blackout in the United States and Canada:causes and recommendations [DB/OL].2004.http://www.nerc.com.
[25]  汤涌,卜广全,易俊.印度“7.30”、“7.31”大停电事故分析及启示[J].中国电机工程学报,2012,32(25):167-174. Tang Yong,Bu Guangquan,Yi Jun.Analysis and lessons of the blackout in Indian power grid on July 30 and 31, 2012[J].Proceedings of the CSEE,2012,32(25):167-174(in Chinese).
[26]  郑超,侯俊贤,严剑峰,等.在线动态安全评估与预警系统的功能设计与实现[J].电网技术,2010,34(3):55-60. Zheng Chao,Hou Junxian,Yan Jianfeng,et al.Functional design and implementation of online dynamic security assessment and early warning system[J].Power System Technology,2010,34(3):55-60(in Chinese).
[27]  中国南方电网公司.交直流电力系统仿真技术[M].1版.北京:中国电力出版社,2007:2. China Southern Power Grid.AC/DC power system simulation technology[M].1st ed.Beijing:China Electric Power Press,2007:2(in Chinese).
[28]  刘奇.高性能计算发展动态[N].中国计算机报,2007-06-25. Liu Qi.High performance computing development [N].China Computer,2007-06-25(in Chinese).
[29]  薛巍.电网仿真考验高性能计算[N].计算机世界,2006-09-25. Xue Wei.Power grid simulation testing high performance computing[N].Computer World,2006-09-25(in Chinese).
[30]  廖力,张涛.云计算综述及其前景展望[J].科技资讯,2009(29):210. Liao Li,Zhang Tao.Cloud computing review and its prospect[J].Science & Technology Information,2009(29):210(in Chinese).
[31]  房秉毅,张云勇,程莹,等.云计算国内外发展现状分析[J].电信科学,2010(S1):1-5. Fang Bingyi,Zhang Yunyong,Cheng Ying,et al.Analysis in the present and developing status of cloud computing [J].Telecommunications Science,2010(S1):1-5(in Chinese).
[32]  Foster I, Zhao Y, Raicu I, et al.Cloud computing and grid computing 360 degree compared[C]//Proceedings of Grid Computing Environments Workshop.Austin,TX,USA:IEEE Computer Society,2008:1-10.
[33]  Rittinghouse John W,Ransome J F.Cloud computing:implementation,management and security[M].USA:CRC Press,2010:1-10.
[34]  汤涌.交直流电力系统多时间尺度全过程仿真和建模研究新进展[J].电网技术,2009,33(16):1-8. Tang Yong.New progress in research on multi-time scale unified simulation and modeling for AC/DC power systems[J].Power System Technology,2009,33(16):1-8(in Chinese).
[35]  HeffernanMD,TurenerKS,Arrillaga J,et al.Computation of AC-DC system disturbance,part I and II and III [J].IEEE Trans. on Power Apparatus and Systems,1981,100(11):4341-4363.
[36]  岳程燕,田芳,周孝信,等.电力系统电磁暂态-机电暂态混合仿真接口原理.电网技术,2006,30(1):23-27,88. Yue Chengyan,Tian Fang,Zhou Xiaoxin,et al.Principle of interfaces for hybrid simulation of power system electromagnetic-electromechanical transient process [J].Power System Technology,2006,30(1):23-27,88(in Chinese).
[37]  Tian Fang,Yue Chengyan,Wu Zhongxi,et al.Realization of electromechanical transient and electromagnetic transient real time hybrid simulation in power system[C]// Proceedings of the IEEE/PES T&D 2005AP.Dalian,China:IEEE PES,2005:SM1-03 T&D-C0384.
[38]  田芳,李亚楼,周孝信,等.电力系统全数字实时仿真装置[J].电网技术,2008,32(22):17-22. Tian Fang,Li Yalou,Zhou Xiaoxin,et al.Advanced digital power system simulator[J].Power System Technology,2008,32(22):17-22(in Chinese).
[39]  李亚楼.大规模电力系统机电暂态实时仿真算法及软件的研究[D].北京:中国电力科学研究院,2003. Li Yalou.Study on large-scale power system electromechanical transient real-time simulation algorithm and software[D].Beijing:China Electric Power Research Institute,2003(in Chinese).
[40]  李传栋,房大中,杨金刚,等.大规模电网并行潮流算法[J].电网技术,2008,32(7):34-39. Li Chuandong,Fang Dazhong,Yang Jingang,et al.New research on parallel power-flow calculation for large-scale power system[J].Power System Technology,2008,32(7):34-39(in Chinese) .
[41]  岳程燕,周孝信,李若梅.电力系统电磁暂态实时仿真中并行算法的研究[J].中国电机工程学报,2004,24(12):1-7. Yue Chengyan,Zhou Xiaoxin,Li Ruomei.Study of parallel approaches to power system electromagnetic transient real-time simulation[J].Proceedings of the CSEE,2004,24(12):1-7(in Chinese).
[42]  Kim B H,Baldick R.A comparison of distributed optimal power flow algorithms[J].IEEE Transactions on Power Systems,2000,15(2):599-604.
[43]  Osano M,Capretz M A M.A distributed method for solving nonlinear equations applying the power load flow calculation[C]//Proceeding of the Thirtieth Hawaii International Conference on System Sciences.Wailea,HI:University of Hawaii,1997:676-680.
[44]  Daniel A B,Tylavsky J.Parallel processing in power system computation[J].IEEE Trans. on Power Systems,1992,7(2):629-638.
[45]  Semlyen A.Fundamental concepts of a Krylov subspace power flow methodology[J].IEEE Transactions on Power Systems,1996,11(3):1528-1534.
[46]  Flueck A J,Chiang H D.Solving the nonlinear power flow equations with an inexact Newton method using GMRES [J].IEEE Transactions on Power Systems,1998,13(2):267-273.
[47]  Jalili-Marandi V,Zhou Zhiyin,Dinavahi V.Large-scale transient stability simulation of electrical power systems on parallel GPUs[J].IEEE Transactions on Parallel and Distributed Systems,2012,23(7):1255-1266.
[48]  车仁飞.配电网潮流计算及重构算法的研究[D].济南:山东大学,2003. Che Renfei.Study on distribution network load flow calculation and reconfiguration algorithm[D].Jinan:Shandong University,2003(in Chinese).
[49]  刘伟,李恒,孙福杰,等.基于GIS和区间FTU的配电网网损计算方法[J].电网技术,2003,27(4):68-71. Liu Wei,Li Heng,Sun Fujie,et al.A new GIS and sectional FTU based calculation method for transmission losses in distribution networks[J].Power System Technology,2003,27(4):68-71(in Chinese).
[50]  Borozan V,Rajictc D.Minimum loss reconfiguration of unbalanced distribution networks[J].IEEE Transactions on Power Delivery,1997,12 (1):435-441.
[51]  Chen T H,Chen M S,Lee W J,et al.Distribution system short circuit analysis-A rigid approach[J].IEEE Trans. on Power Systems,1992,7(1):444-450.
[52]  Ghosh D Das.Method for load-flow solution of radial distribution networks[J].IEE Proceedings-Generation,Transmission and Distribution,1999,146(6):641-648.
[53]  Lee S,Valenti A,Bel I.Distribution fast simulation and modeling(D—FSM)high level requirements[R].Palo Alto,California:US EPRI,2005.
[54]  余贻鑫,徐臣,贾宏杰.智能电网快速仿真与模拟任务调度优化方法[J].计算机工程与应用,2009,45(19):26-30. Yu Yixin,Xu Chen,Jia Hongjie.Optimal algorithms for task scheduling on smart grid fast simulation and modeling[J].Computer Engineering and Applications,2009,45(19):26-30(in Chinese).
[55]  陈海焱,陈金富,段献忠.含分布式电源的配电网潮流计算[J].电力系统自动化,2006,30(1):35-40. Chen Haiyan,Chen Jinfu,Duan Xianzhong.Study on power flow calculation of distribution system with DGs[J].Automation of Electric Power Systems,2006,30(1):35-40(in Chinese).
[56]  郭力,王成山.含多种分布式电源的微网动态仿真[J].电力系统自动化,2009,33(2): 82-86. Guo Li,Wang Chengshan.Dynamical simulation on microgrid with different types of distributed generations [J].Automation of Electric Power Systems,2009,33(2):82-86(in Chinese).
[57]  赵晶晶.含分布式发电的配电网优化运行研究[D].重庆:重庆大学.2009. Zhao Jingjing.Study on operation optimization of distribution system with DGs[D].Chongqing:Chongqing University(in Chinese).
[58]  Katiraei F,Iravani MR.Power management strategies for a microgrid with multiple distributed generation units[J].IEEE Transactions on Power Systems,2006,21(4):1821-1831.
[59]  Kim T E,Kim J E.Considerations for the feasible operating range of distributed generation interconnected to power distribution system[C]//Proceedings of the IEEE Power Engineering Society Transmission and Distribution Conference.Chicago:IEEE PES,2002,1:42-48.
[60]  Zhu Y,Tomsovic K.Adaptive power flow method for distribution systems with dispersed generation[J].IEEE Transactions on Power Delivery,2002,17(2):822-827.
[61]  Vittal V,Sauer P,Meliopoulos S,et al.On-line transient stability assessment scoping study[R].Ithaca,New York,:Power Systems Engineering Research Center,2005.
[62]  薛禹胜.EEAC和FASTEST[J].电力系统自动化,1998,22(9):25-30. Xue Yusheng.EEAC and FASTEST[J].Automation of Electric Power Systems,1998,22(9):25-30(in Chinese).
[63]  张伯明,吴素农,蔡斌,等.电网控制中心安全预警和决策支持系统设计[J].电力系统自动化,2006,30(6):1-5. Zhang Boming,Wu Sunong,Cai Bin,et al.Design of an early warning and security countermeasure system for electric power control centers[J].Automation of Electric Power Systems,2006,30(6):1-5(in Chinese).
[64]  张伯明.智能安全预警:美加停电事故对调度自动化的启示[C]//电力系统安全及其战略防御高级学术研讨会论文集.北京:电网技术杂志社与中国电机工程学会,2004:147-157. Zhang Boming.Intelligent security early warning,enlightment on dispatch automation obtained from American & Canada blackout[C]//Proceedings of Power System Security and its Strategic Defense Academic Seminar.Beijing:Journal of Power System Technology & Chinese Society for Electrical Engineering,2004:147-157(in Chinese).
[65]  Demartini G,Massucco S,Wiehenkel L.Open market access and security assessment system[C]//Proceedings of the 7th International Workshop on Electric Power Control Centers.Ortisei,Italy:Italian Society for Electrical Engineering,2003:1407-1409.
[66]  罗建民,戚光宇,何正文,等.电力系统实时仿真技术研究综述[J].继电器,2006,34(18):79-86. Luo Jianmin,Qi Guangyu,He Zhengwen,et al.Research on power system real-time simulation[J].Relay,2006,34(18):79-86(in Chinese).
[67]  IREQ.HYPERSIM[R].Quebec,Canada:Hydro-QueBec,2007.
[68]  Marttila R J,Dick E P,Fischer D,et a1.Closed-loop testing with the real-time digital power system simulator [J].Electric Power Systems Research,1996,36(3):181-190.
[69]  Brandt D,Wachal R,Valiquett R.Closed loop testing of a joint VAR controller using a digital real time simulator [J].IEEE Trans. on Power Systems,1991,6(3):1140-1146.
[70]  Claus M,Messner H,Retzmann D,et a1.Verification of HVDC controller using an advanced hybrid real-time digital simulator[C]//Proceedings of POWERCON 98, International Conference on Power System Technology.Beijing,China:IEEE,CSEE,1998:493-497.
[71]  谢化安,王永源,万四维,等.东莞变电站链式STATCOM控制保护的RTDS试验研究[J].电力系统保护与控制,2013,41(4):117-122. Xie Huaan,Wang Yongyuan,Wan Siwei,et al.Research on the control and protection system of Dongguan Substation cascade static synchronous compensator based on RTDS[J].Power System Protection and Control,2013,41(4):117-122(in Chinese).
[72]  OPAL-RT Inc..RT-LAB version 8.3.6 user guide [R].Montreal,Canada:OPAL-RT Inc.,2009.
[73]  Wang X,Giesbrecht J,Woodford D,et al.Enhanced performance of a conventional HVDC analogue simulator with a real-time digital simulator[C]//Proceedings of the 11th Power System Computation Conference.Avignon,France:,1993:663-669.
[74]  Kuffel R,Wierckx R P,Forsyth P,et al.Expanding an analogue HVDC simulator’s modeling capability using a real-time digital simulator (RTDS)[C]//Proceedings of the First International Conference on Digital Power System Simulators - ICDS ‘95,College Station.Texas,USA:IEEE,1995:199-204.
[75]  胡涛,朱艺颖,张星,等.全数字实时仿真装置与物理仿真装置的功率连接技术[J].电网技术,2010,34(1):51-55. Hu Tao,Zhu Yiying,Zhang Xing,et al.Power connection technology for full-digital real-time simulator and analogue simulator[J].Power System Technology,2010,34(1):51-55(in Chinese).
[76]  张洁.未来计算机与计算机技术发展展望[J].广东科技,2006(10):140-141. Zhang Jie.Computer in the future and computer technology development prospect[J].Guangdong Science &Technology,2006(10):140-141(in Chinese).
[77]  王颖华.计算机技术现状及未来发展分析[J].计算机与网络,2010(3):136-138. Wang Yinghua.Computer technology status and future development analysis[J].China Computer & Network,2010(3):136-138(in Chinese).
[78]  Fire Fox.五种未来计算机[J].微型计算机,2003(18):19-23. Fire F.Five kinds of computer in the future[J].Micro Computer,2003(18):19-23(in Chinese).
[79]  李向林.纳米计算技术前瞻[J].科技信息,2000(12):28-29. Li Xianglin.Nanometer computing technology prospect [J].Science & Technology Information,2000(12):28-29(in Chinese).
[80]  杜鹏.未来PC的发展趋势[J].中国现代教育装备,2007(9):118-119. Du Peng.Developing trend of future PC[J].China Modern Education Equipment,2007(9):118-119(in Chinese).
[81]  Sun D-M,Marina Y.Timmermans,Tian Ying,et al.Flexible high-performance carbon nanotube integrate circuits[J].Nature Nanotechnology,2011(6):156-161.
[82]  顾冠群,沈苏彬,顾伯萱,等.新一代高性能计算机网络[J].东南大学学报:自然科学版,2002,32(3):301-310. Gu Guanqun,Shen Subin,Gu Boxuan,et al.New generation high performance computer network [J].Journal of Southeast University:Natural Science Edition,2002,32(3):301-310(in Chinese).
[83]  张晓艳,刘东华,王仲华.计算机网络发展趋势探析[J].计算机与网络,2003(6):60-61. Zhang Xiaoyan,Liu Donghua,Wang Zhonghua.Developing trend of computer network [J].China Computer & Network,2003(6):60-61(in Chinese).
[84]  常海山.也许世界只需要一台电脑[J].中国计算机用户,2008(18):38. Chang Haishan.Maybe the world only need one computer[J].China Computer Users,2008(18):38(in Chinese).
[85]  Jarvis S A,Spooner D P,Keung H N L C,et al.performance-based middleware services for grid computing[C]//Proceeding of the 5th Annual International Workshop on Active Middleware Services (AMS2003).Washington,USA:IEEE Computer Society,2003:151-159.
[86]  张步涵,方华亮,毛承雄,等.电力系统的新计算模式:网格计算[J].水电能源科学,2005,23(3):5-8. Zhang Buhan,Fang Hualiang,Mao Chengxiong,et al.A new computing mode in power system:grid computing [J].Water Resources and Power,2005,23(3):5-8(in Chinese).
[87]  周海强,茆超,鞠平,等.考虑配电网络的综合负荷模型可辨识性分析[J].电力系统自动化,2008,32(16) :16-19,77. Zhou Haiqiang,Mao Chao,Ju Ping,et al.An identifiability analysis of a synthetic load model with the distribution network considered[J].Automation of Electric Power Systems,2008,32(16):16-19,77(in Chinese).
[88]  李培强,李欣然,林舜江.电力负荷建模研究述评[J].电力系统及其自动化学报,2008,20(5):56-64,123. Li Peiqiang,Li Xinran,Lin Shunjiang.Critical review on synthesis load modeling[J].Proceedings of the CSU- EPSA,2008,20(5):56-64,123(in Chinese).
[89]  Acha E,Claudio R F-E,Hugo A-P,et al.柔性交流输电系统在电网中的建模与仿真[M].程新功,张勇,王中华,译.北京:机械工业出版社,2011:6-34. Acha E,Claudio R F-E,Hugo A-P,et al.FACTS modeling and simulation in power networks [M].Translated by Cheng Xingong,Zhang Yong,Wang Zhonghua.Beijing:Machinery Industry Press,2011:6-34(in Chinese).
[90]  张占奎,王德意,迟永宁,等.超导储能装置提高风电场暂态稳定性的研究[J].电力系统保护与控制,2010(24):38-42,47. Zhang Zhankui,Wang Deyi,Chi Yongning,et al.Study of transient stability enhancement of wind farm by application of superconducting magnetic energy storage devices[J].Power System Protection and Control,2010(24):38-42,47(in Chinese).
[91]  Kustom R L,Skiles J J,Wang J,et al.Research on power conditioning systems for superconductive magnetic energy storage(SMES)[J].IEEE Trans. on Magnetics,1991,127(2):2320-2323.
[92]  周双喜,吴畏,吴俊玲,等.超导储能装置用于改善暂态电压稳定性的研究[J].电网技术,2004,28(4):1-5. Zhou Shuangxi,Wu Wei,Wu Junling,et al.Application of superconducting magnetic energy storage to improve transient voltage stability[J].Power System Technology,2004,28(4):1-5(in Chinese).
[93]  Lin Yoke,Wang Youyi.Augmentation of transient stability using a superconducting coil and adaptive nonlinear control[J].IEEE Trans. on Power Systems,1998,13(2):361-366.
[94]  Hirose M,Masuda T,Sato K,et al.High-temperature superconducting (HIS) DC cable[J].SEI Technical Review,2006(61):29-35.
[95]  Slootweg J G,Kling W L.Impacts of distributed generation on power system transient stability[C]//IEEE Power Engineering Society Summer Meeting.Chicago,IL,USA:IEEE PES,2002:862-867.
[96]  Azmy A M,Erlich I.Impact of distributed generation on the stability of electrical power system[C]//IEEE Power Engineering Society General Meeting.San Francisco,CA,USA:IEEE PES,2005:780-787.
[97]  王成山,李鹏.分布式发电系统仿真理论与方法[J].电力科学与技术学报,2008,23(1):8-12. Wang Chengshan,Li Peng.Theory and methodology of power system simulation including distributed generation units[J].Journal of Electric Power Science and Technology,2008,23(1):8-12(in Chinese).
[98]  曾正,赵荣祥,杨欢.含逆变器的微电网动态相量模型[J].中国电机工程学报,2012,32(10):65-71. Zeng Zheng,Zhao Rongxiang,Yang Huan.Dynamic phasors model of micro-grid with grid-connected inverters and simulation[J].Proceedings of the CSEE,2012,32(10):65-71(in Chinese).
[99]  白晓清,韦化,Katsuki Fujisawa.求解最优潮流问题的内点半定规划法[J].中国电机工程学报,2008,28(19):56-64. Bai Xiaoqing,Wei Hua,Fujisawa K.Solution of optimal power flow problems by semi-definite programming [J].Proceedings of the CSEE,2008,28(19):56-64(in Chinese).
[100]  薛禹胜.EEAC与直接法的机理比较:(一)受扰程度函数.电力系统自动化,2001,25(11):6-11. Xue Yusheng.A critical comparison of various methods for transient stability assessment,part one: disturbed- measure functions[J].Automation of Electric Power Systems,2001,25(11):6-11(in Chinese).