宋云亭,郭永基,程琳.电力系统可靠性基本数据的统计分析[J].继电器,2002,30(7):14-16,36. Song Yunting,Guo Yongji,Cheng Lin.Statistical analysis of reliability data for power system units.relay[J].2002,30(7):14-16,36(in Chinese).
[2]
宁辽逸,吴文传,张伯明,等.运行风险评估中缺乏历史统计数据时的元件停运模型[J].中国电机工程学报,2009,29(25):26-31. Ning Liaoyi,Wu Wenchuan,Zhang Boming et al.Component outage modeling method for operation risk assessment with limited power components’ failure data [J].Proceedings of the CSEE,2009,29(25):26-31(in Chinese).
[3]
宁辽逸,吴文传,张伯明.电力系统运行风险评估中元件时变停运模型分析[J].电力系统自动化,2009, 33(16):7-12. Ning Liaoyi,Wu Wenchuan,Zhang Boming.Analysis of a time-varying power component outage model for outage model for risk assessment[J].Automation of Electric Power Systems,2009,33(16):7-12(in Chinese).
[4]
丁明,周竞,汪兴强.发输电互联等值系统风险评估的解析模型[J].中国电机工程学报,2012,32(10):111-117. Ding Ming,Zhou Jing,Wang Xingqiang.An analytical model for risk evaluation of equivalent interconnected composite system[J].Proceedings of the CSEE,2012,32(10),111-117(in Chinese).
[5]
王晓滨,郭瑞鹏,曹一家,等.电力系统可靠性评估的自适应分层重要抽样法[J].电力系统自动化,2011,35(3):33-38. Wang Xiaobin,Guo Ruipeng,Cao Yijia,et al.A self-adapting stratified and importance sampling method for power system reliability evaluation[J].Automation of Electric Power Systems,2011,35(3):33-38(in Chinese).
[6]
Li Wenyuan,Zhou Jiaqi,Lu Jiping,et al.Incorporating a combined fuzzy and probabilistic load model in power system reliability assessment[J].IEEE Transactions on Power Systems,2007,22(3):1386-1388.
[7]
Billinton R,Allan R N.Reliability evaluation of power systems[M].Second edition.New York and London:Plenum Press,1996:1-2.
[8]
孙元章,周家启.大型互联网电网在线运行可靠性的基础理论[M].北京:清华大学出版社,2010:1-3. Sun Yuanzhang,Zhou Jiaoqi.Basic theory of large internet electric network on-line operation reliability[M].Beijing:Tsinghua University Press,2010:1-3(in Chinese).
[9]
李文沅.电力系统风险评估模型、方法和应用[M].北京:科学出版社,2006:10-33. Li Wenyuan.Risk assessment of power systems models,methods,and applications[M].Beijing:Science Press,2006:10-33(in Chinese).
[10]
电力行业可靠性管理标准化技术委员会.DL/T 861—2004 电力可靠性基本名词术语[S].北京:中国电力出版社,2004. Reliability Management of Power Industry Standardization Technical Committee.DL/T 861-2004 Basic vocabulary of electric power reliability[S].Beijing:China Electric Power Press,2004(in Chinese).
[11]
丁明,王伟胜,王秀丽,等.大规模光伏发电对电力系统影响综述[J] .中国电机工程学报,2014,34(1):1-14. Ding Ming,Wang Weisheng,Wang Xiuli et al.A review on the effect of large-scale PV generation on power systems[J] .Proceedings of the CSEE,2014,34(1):1-14(in Chinese).
[12]
余昆,曹一家,陈星莺,等.含分布式电源的地区电网动态概率潮流计算[J].中国电机工程学报,2011, 31(1) :20-25. Yu Kun,Cao Yijia,Chen Xingying et al.Dynamic probability power flow of district grid containing distributed generation[J] .Proceedings of the CSEE,2011,31(1):20-25(in Chinese).
[13]
Utkin L V,Coolen F P A.Imprecise reliability:an introductory overview[J].Computational Intelligence in Reliability Engineering,New Metaheuristics,Neuraland Fuzzy Techniques in Reliability,2007,40(2):261-306.
[14]
张鹏,王守相.大规模配电系统可靠性评估的区间算法[J].中国电机工程学报.2004,24(3):77-84. Zhang Peng,Wang Shouxiang.A novel interval method for reliability evaluation of large scale distribution system[J].Proceedings of the CSEE,2004,24(3):77-84(in Chinese).
[15]
张鹏,郭永基.电气主接线可靠性评估的区间方法[J].电力系统自动化,2004,28(19):48.52. Zhang Peng,Guo yongji.Interval method for power station and substation reliability evaluation[J].Automation of Electric Power Systems,2004,28(19):48-52(in Chinese).
[16]
苏慧玲,王淳.孤立发电系统的可靠性区间评估[J].继电器,2007,4,35(8):27-30,40. Su Huiling,Wang Chun.An interval approach for evaluating isolated generating system reliability[J].Relay,2007,35(8):27-40(in Chinese).
[17]
张焰.电网规划中的模糊可靠性评估方法[J].中国电机工程学报,2000.20(11):77-80. Zhang Yan.The evaluation method of fuzzy reliability in electric power network planning[J].Proceedings of the CSEE,2000,20(11):77-80(in Chinese).
[18]
陈举华,赵建国,郭毅之.电力系统可靠性研究的灰关联和模糊贴近度分析方法[J].中国电机工程学报,2002,22(1):59-63. Chen Juhua,Zhao Jianguo,Guo Yizhi.Grey relational and guzzy nearness analysis on the reliability study of power system[J] .Proceedings of the CSEE,2002,22(1):59-63(in Chinese).
[19]
雷秀仁,任震,黄雯莹.处理配电系统可靠性评估不确定性的未确知数学方法[J].电力系统自动化,2005.29(17):28-33. Lei Xiuren,Ren Zhen,Huang Wenying.Unascertained mathematical approach to management of uncertainty in reliability evaluation of distribution systems[J].Automation of Electric Power Systems,2005.29(17):28-33(in Chinese).
[20]
Utkin L V,Kozine I.On new cautious structural reliability models in the framework of imprecise probabilities[J].Structural Safety,2010,32(6):411-416.
[21]
Choi Hyun-Ho,Seo Jongwon.Safety assessment using imprecise reliability for corrosion-damaged structures[J].Computer-Aided Civil and Infrastructure Engineering,2009,24(4):293-301.
[22]
Ahmed M A,Muzaffar Z.Handling imprecision and uncertainty in software development effort prediction:A type-2 fuzzy logic based framework[J].Information and Software Technology,2009,51(3):640-654.
[23]
Aughenbaugh J M,Paredis C J J.The value of using imprecise probabilities in engineering design[J].Journal of Mechanical Design,2006,128(4):969-979.
[24]
Walley P.Statistical reasoning with imprecise probabilities[M].New York:Chapman and Hall,1991.
[25]
Lovric M.International encyclopedia of statistical science[M].Berlin Heidelberg:Springer,2011: 649-650.
[26]
Ferson S,Kreinovich V,Ginzburg Lev,et al.Constructing probability boxes and dempster-shafer structures[M].Sandia National Laboratories,2003:13-14.
[27]
Bernardini A,Tonon F.Extreme probability distributions of random/fuzzy sets and p-boxes[J].International Journal of Reliability and Safety,2009,3(1):57-78.
[28]
Birolini A.Reliability engineering:theory and practice[M].Springer,2010:162-182.