雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89. Lei Yazhou.Studies on wind farm integration into power system[J].Automation of Electric Power Systems,2003,27(8):84-89(in Chinese).
[2]
Karki R,Thapa S,Billinton R.A simplified risk-based method for short-term wind power commitment[J].IEEE Transactions on Sustainable Energy,2012,3(3):498-505.
[3]
Karki R,Po H,Billinton R.A simplified wind power generation model for reliability evaluation[J].IEEE Transactions on Energy Conversion,2006,21(2):533-540.
[4]
张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31. Zhang Hongyu,Yin Yonghua,Shen Hong,et al.Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J].Proceedings of the CSEE,2011,31(22):26-31(in Chinese).
[5]
白建华,张钦,辛颂旭,等.风电利用水平评价关键指标研究[J].中国电力,2012,45 (11):7-11. Bai Jianhua,Zhang Qin,Xin Songxu,et al.Research on key indexes comparison of wind power utilization level[J].Electric Power,2012,45(11):7-11(in Chinese).
[6]
张丽英,叶挺路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,30(25):1-9. Zhang Liying,Ye Tinglu,Xin Yaozhong,et al.Problems and measures of power grid accommodating large scale wind power[J].Proceedings of the CSEE,2010,30(25):1-9(in Chinese).
[7]
Bart C U,Madeleine G,Engbert P,et al.Impacts of wind power on thermal generation unit commitment and dispatch[J].IEEE Transactions on Energy Conversion, 2007,22(1):44-50.
邹斌,李冬.基于有效容量分布的含风电场电力系统随机生产模拟[J].中国电机工程学报,2012,32(7):23-32. Zou Bin,Li Dong.Power system probabilistic production simulation with wind generation based on available capacity distribution[J].Proceedings of the CSEE,2012,32(7):23-32(in Chinese).
[10]
陈道君,龚庆武,张茂林,等.考虑能源环境效益的含风电场多目标优化调度[J].中国电机工程学报,2011,31(13):10-17. Chen Daojun,Gong Qingwu,Zhang Maolin,et al.Multi- objective optimal dispatch in wind power integrated system incorporating energy-environmental efficiency [J].Proceedings of the CSEE,2011,31(13):10-17(in Chinese).
[11]
田廓,曾鸣,鄢帆,等.考虑环保成本和风电接入影响的动态经济调度模型[J].电网技术,2011,35(6):55-59. Tian Kuo,Zeng Ming,Yan Fan,et al.A dynamic economic scheduling model considering environmental protection cost and impact of connecting wind power to power grid[J].Power System Technology,2011,35(6):55-59(in Chinese).
[12]
李智,韩学山,杨明,等.计及接纳风电能力的电网调度模型[J].电力系统自动化,2010,34(19):15-19. Li Zhi,Han Xueshan,Yang Ming,et al.Assessment of transient voltage stability of load bus considering mechanical torque of dynamic load[J].Automation of Electric Power Systems,2010,34(19):15-19(in Chinese).
[13]
袁铁江,晁勤,吐尔逊·依不拉音,等.电力市场环境下含风电机组的环境经济调度模型及其仿真[J].电网技术,2009,33(6):67-71. Yuan Tiejiang,Chao Qin,Tuerxun Yibulayin,et al.An environmental/economic dispatch model for power grid containing wind power generation units and its simulation in electricity market environment[J].Power System Technology,2009,33(6):67-71(in Chinese).
[14]
姚瑶,于继来.计及风电备用风险的电力系统多目标混合优化调度[J].电力系统自动化,2011,35(22):118-124. Yao Yao,Yu Jilai.Multi-objective hybrid optimal dispatch of power systems considering reserve risk due to wind power[J].Automation of Electric Power Systems,2011,35(22):118-124(in Chinese).
[15]
陈振寰,陈永华,行舟,等.大型集群风电有功智能控制系统控制策略:(二)风火电“打捆”外送协调控制[J].电力系统自动化,2011,35(21):12-15. Chen Zhenhuan,Chen Yonghua,Xing Zhou,et al.A control strategy of active power intelligent control system for large cluster of wind farms part two:Coordination control for shared transmission of wind power and thermal power[J].Automation of Electric Power Systems,2011,35(21):12-15(in Chinese).
[16]
郭小江,马世英,申洪,等.大规模风电直流外送方案与系统稳定控制策略[J].电力系统自动化,2012,36(15):107-115. Guo Xiaojiang,Ma Shiying,Shen Hong,et al.HVDC grid connection schemes and system stability control strategies for large-scale wind power[J].Automation of Electric Power Systems,2012,36(15):107-115(in Chinese).
[17]
张强,冯艳虹,王绍德.特高压交流通道风火联合送电问题研究[J].中国电力,2012,45(6):1-4. Zhang Qiang,Feng Yanhong,Wang Shaode.Research on UHV AC transmission of combined electricity generated from wind and thermal[J].Electric Power,2012,45(6):1-4(in Chinese).
[18]
Selvakumar A I,Thanushkodi K.A new particle swarm optimization solution to nonconvex economic dispatch problems[J].IEEE Transactions on Power Systems,2007,22(1):42-51.
[19]
黄泽霞,俞攸红,黄德才.惯性权自适应调整的量子粒子群优化算法[J].上海交通大学学报,2012,46(2):228-232. Huang Zexia,Yu Youhong,Huang Decai.Quantum- behaved particle swarm algorithm with self-adapting adjustment of inertia weight[J].Journal of Shanghai Jiaotong University,2012,46(2):228-232(in Chinese).
[20]
李士勇,李盼池.量子计算与量子优化算法[M].哈尔滨:哈尔滨工业大学出版社,2009:101-117. Li Shiyong,Li Panchi.Quantum computation and quantum optimization algorithms[M].Harbin:Harbin Institute of Technology Press,2009:101-117(in Chinese).
[21]
Kennedy J,Eberhart R.Particle swarm optimization[C]// Proceedings of IEEE Conference on Neural Networks.Perth,Australia:IEEE,1995:1942-1948.
[22]
韩丰,李隽,王智冬,等.七个千万千瓦级输电系统规划设计[R].北京:国网北京经济技术研究院,2010. Han Feng,Li Jun,Wang Zhidong,et al.Seventy million kilowatts of wind power base transmission system planning and design[R].Beijing:State Power Economic Research Institute,2010(in Chinese).