大型集群风电接入输电系统规划研究综述

DOI: 10.13334/j.0258-8013.pcsee.2014.10.007, PP. 1566-1574

Keywords: 大型集群风电,不确定因素,输电系统规划,网源规划

Full-Text   Cite this paper   Add to My Lib

Abstract:

大型集群风电接入给电力系统的规划和运行增加了更多的不确定因素。由于风电的间歇性、随机性、波动性及风电场选址等问题,传统的电网规划方法越来越不适应当前多不确定信息的电网规划工作。针对大型集群风电接入对电网规划的影响,评述了集群风电出力不确定性建模,并基于规划模型和评估方法,综述了近年来国内外计及风电不确定性的系统潮流计算方法以及含集群风电的输电系统规划领域的研究现状和研究成果。从输电系统规划、网源协调规划等方面着手,结合特高压电网、环保效益等研究热点,展望了如何在未来大型集群风电接入情况下获得最优规划决策方案的输电系统规划理论和方法。

References

[1]  Moeini-Aghtaie M, Abbaspour A, Fotuhi-Firuzabad M.Incorporating large-scale distant wind farms in probabilistic transmission expansion planning, part I:theory and algorithm[J].IEEE Transactions on Power Systems, 2012, 27(3):1585-1593.
[2]  雷亚洲.与风电并网相关的研究课题[J].电力系统自动化, 2003, 27(8):84-89.
[3]  Lei Yazhou.Studies on wind farm integration into power system[J].Automation of Electric Power Systems, 2003, 27(8):84-89(in Chinese).
[4]  万振东.考虑大规模风电消纳能力的电网灵活规划[D].上海:上海交通大学, 2012.
[5]  Wan Zhendong.Flexible transmission system expansion considering accommodation capacity of large scale wind power[D].Shanghai:Shanghai Jiao Tong University, 2012(in Chinese).
[6]  Wang Ruogu, Wang Jianxue, You Shutang, et al.A novel transmission planning method for integrating large-scale wind power[C]//Asia-Pacific Power and Energy Engineering Conference(APPEEC).Shanghai, China:IEEE PES, 2012:1-4.
[7]  Zhang Wei, Wang Weimin.Wind speed forecasting via ensemble Kalman filter[C]//The 2nd International Conference on Advanced Computer Control(ICACC).Shenyang, China:IEEE, 2010:73-77.
[8]  孙元章, 吴俊, 李国杰, 等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报, 2011, 4(29):41-47.
[9]  Sun Yuanzhang, Wu Jun, Li Guojie, et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE, 2011, 4(29):41-47(in Chinese).
[10]  王茜, 张粒子.采用NSGA-II混合智能算法的风电场多目标电网规划[J].中国电机工程学报, 2011, 31(19):17-24.
[11]  Wang Qian, Zhang Lizi.Multi-objective transmission planning associated with wind farms applying nsga-ii hybrid intelligent algorithm[J].Proceedings of the CSEE, 2011, 31(19):17-24(in Chinese).
[12]  Billinton R, Wangdee W.Reliability-based transmission reinforcement planning associated with large-scale wind farms[J].IEEE Transactions on Power Systems, 2007, 1(22):34-41.
[13]  Dong Z Y, Wong K P, Meng K, et al.Wind power impact on system operations and planning[C]//IEEE Power and Energy Society General Meeting.Minneapolis, America:IEEE, 2010:1-5.
[14]  Zhang Xinsong, Yuan Yue, Wu Boweng, et al.A novel algorithm for power system planning associated with large-scale wind farms in deregulated environment[C]// The 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT).Weihai, China:IEEE PES, 2011:1613-1617.
[15]  吴义纯.含风电场的电力系统可靠性与规划问题的研究[D].合肥:合肥工业大学, 2006.
[16]  Wu Yichun.Research on reliability evaluation and expansion planning of power system including wind farms[D].Hefei:Hefei University of Technology, 2006(in Chinese).
[17]  牟聿强, 王秀丽, 别朝红, 等.风电场风速随机性及容量系数分析[J].电力系统保护与控制, 2009, 37(1):65-70.
[18]  Mu Yuqiang, Wang Xiuli, Bie Zhaohong, et al.Analysis of wind speed probability distribution and wind turbine generator capacity factor[J].Power System Protection and Control, 2009, 37(1):65-70(in Chinese).
[19]  Bowden G J, Barker P R, Shestopal V O, et al.Weibull distribution function and wind power statistics[J].Wind Engineering, 1983, 7(2):85-98.
[20]  Jiang Wen, Yan Zheng, Feng Donghan.A review on reliability assessment for wind power[J].Renewable and Sustainable Energy Reviews, 2009(13):2485-2494.
[21]  于晗, 钟志勇, 黄杰波, 等.考虑负荷和风电出力不确定性的输电系统机会约束规划[J].电力系统自动化, 2009, 33(2):20-24.
[22]  Yu Han, Zhong Zhiyong, Huang Jiebo, et al.A chance constrained transmission network expansion planning method associated with load and wind farm variations[J].Automation of Electric Power Systems, 2009, 33(2):20-24(in Chinese).
[23]  Cho K, Park J, Taegon O.Probabilistic reliability criterion for expansion planning of grids including wind turbine generators[C]//IEEE Power and Energy Society General Meeting.San Diego, America:IEEE Power and Energy Society, 2011:1-6.
[24]  李志恒.风蓄联合系统规划问题研究[D].武汉:华中科技大学, 2008.
[25]  Li Zhiheng.Research on the planning of wind & hydro integrated system[D].Wuhan:Huazhong University of Science & Technology, 2008(in Chinese).
[26]  Yu H, Chung C Y, Wong K P, et al.A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties[J].IEEE Transactions on Power Systems, 2009, 24(3):1568-1576.
[27]  华文.含风力发电的电力系统规划关键问题研究[D].杭州:浙江大学, 2012.
[28]  Hua Wen.Study on critical issues of power system planning including wind power[D].Hangzhou:Zhejiang University, 2012(in Chinese).
[29]  肖创英, 汪宁渤, 陟晶, 等.甘肃酒泉风电出力特性分析[J].电力系统自动化, 2010, 34(17):64-67.
[30]  Xiao Chuangying, Wang Ningbo, Zhi Jing, et al.Power characteristics of jiuquan wind power base[J].Automation of Electric Power Systems, 2012, 34(17):64-67(in Chinese).
[31]  穆钢, 崔杨, 严干贵.确定风电场群功率汇聚外送输电容量的静态综合优化方法[J].中国电机工程学报, 2011, 31(1):15-19.
[32]  Mu Gang, Cui Yang, Yan Gangui.A static optimization method to determine integrated power transmission capacity of clustering wind farms[J].Proceedings of the CSEE, 2011, 31(1):15-19(in Chinese).
[33]  黄裕春, 杨甲甲, 文福拴, 等.计及接纳间歇性电源能力的输电系统规划方法[J].电力系统自动化, 2013, 37(4):28-34.
[34]  Huang Yuchun, Yang Jiajia, Wen Fushuan, et al.Transmission system planning considering the capability of accommodating intermittent generation sources[J].Automation of Electric Power Systems, 2013, 37(4):28-34(in Chinese).
[35]  Barbulescu C, Kilyeni S.Congestion management transmission expansion planning considering large wind power plants[C]//The 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI).Timisoara, Rumania:IEEE, 2011:559-564.
[36]  Wang Lingfeng, Singh C.A conceptual study on reliability constrained transmission system planning including wind power[C]//IEEE Power & Energy Society General Meeting.Calgary, Canada:IEEE PES, 2009:1-7.
[37]  Gu Yang, McCalley J.Market-based Transmission Expansion Planning under Uncertainty[C]//North American Power Symposium(NAPS).Arlington, America:IEEE, 2010:1-6.
[38]  Ding Yi, Wang Peng, Goel L, et al.Long-term reserve expansion of power systems with high wind power penetration using universal generating function methods[J].IEEE Transactions on Power Systems, 2012, 26(2):766-774.
[39]  Careri F, Genesi C, Marannino P, et al.Wind power generation and transmission system planning:the Italian case[C]//The 15th IEEE Mediterranean Electrotechnical Conference.Valletta, Malta:IEEE, 2010:979-984.
[40]  王茜.风电场与输电网协调规划的模型和方法研究[D].北京:华北电力大学, 2011.
[41]  Wang Qian.Research on models and methods of coordinated planning between wind farms and transmission network[D].Beijing:North China Electric Power University, 2011(in Chinese).
[42]  张新松, 袁越, 吴博文, 等.电力市场环境下含大规模风电场的输电网规划[J].电力系统自动化设备, 2012, 32(4):100-103.
[43]  Zhang Xinsong, Yuan Yue, Wu Bowen, et al.Expansion planning of transmission network with large wind farm in deregulated electricity market environment[J].Electric Power Automation Equipment, 2012, 32(4):100-103(in Chinese).
[44]  郑静, 文福拴, 李力, 等.计及风险控制策略的含风电机组的输电系统规划[J].电力系统自动化, 2011, 35(22):71-76.
[45]  Zheng Jing, Wen Fushuan, Li Li, et al.Transmission system planning with risk-control strategies for power systems with wind generators[J].Automation of Electric Power Systems, 2011, 35(22):71-76(in Chinese).
[46]  于晗.基于概率的含风电场电网的输电系统规划方法研究[D].北京:华北电力大学, 2008.
[47]  Yu Han.Probabilistic approaches to network expansion planning of power systems with wind farms[D].Beijing:North China Electric Power University, 2008(in Chinese).
[48]  武鹏, 程浩忠, 邢洁, 等.不确定信息下的输电网规划新模型[J].电力系统自动化, 2008, 32(13):21-25.
[49]  Wu Peng, Cheng Haozhong, Xing Jie, et al.A new transmission network planning model considering uncertain information[J].Automation of Electric Power Systems, 2008, 32(13):21-25(in Chinese).
[50]  高赐威, 程浩忠, 王旭.考虑场景发生概率的柔性约束电网规划模型[J].中国电机工程学报, 2004, 24(11):34-38.
[51]  Gao Ciwei, Cheng Haozhong, Wang Xu, et al.Electric power network flexible planning model based on the probability of scene occurrence[J].Proceedings of the CSEE, 2004, 24(11):34-38(in Chinese).
[52]  George A O, Pavlos S G.Transmission expansion planning of systems with increasing wind power integration[J].IEEE Transactions on Power Systems, 2013, 28(2):1355-1362.
[53]  徐楠.考虑风电接入的输电网规划研究[D].保定:华北电力大学, 2009.
[54]  Xu Nan.Research on tansmission network planning considering wind farm connected[D].Baoding:North China Electric Power University, 2009(in Chinese).
[55]  柳璐, 程浩忠, 马则良, 等.考虑全寿命周期成本的输电网多目标规划[J].中国电机工程学报, 2012, 32(22):46-53.
[56]  Liu Lu, Cheng Haozhong, Ma Zeliang, et al.Multi-objective transmission expansion planning considering life cycle cost[J].Proceedings of the CSEE, 2012, 32(22):46-53(in Chinese).
[57]  乔嘉赓, 徐飞, 鲁宗相, 等.基于相关机会规划的风电并网容量优化分析[J].电力系统自动化, 2008, 32(10):84-87, 103.
[58]  Qiao Jiageng, Xu Fei, Lu Zongxiang, et al.Optimization analysis model of grid-connected wind capacity based on dependent chance programming[J].Automation of Electric Power Systems, 2008, 32(10):84-87, 103(in Chinese).
[59]  曾鸣, 吕春泉, 邱柳青, 等.风电并网时基于需求侧响应的输电规划模型[J].电网技术, 2011, 35(4):129-134.
[60]  Zeng Ming, Lü Chunquan, Qiu Liuqing, et al.A demand-side response-based transmission planning model with grid-connected wind farms[J].Power System Technology, 2011, 35(4):129-134(in Chinese).
[61]  崔晓丹, 李威, 任先成, 等.大规模风电接入的输电网规划研究述评[J].江苏电机工程, 2012, 31(6):1-5.
[62]  Cui Xiaodan, Li Wei, Ren Xiancheng, et al.Review of the research on transmission network planning with large scale wind power connected[J].Jiangsu Electrical Engineering, 2012, 31(6):1-5(in Chinese).
[63]  Fan Lingling, Osborn D, Miland J, et al.Regional transmission planning for large-scale wind power[C]// IEEE Power & Energy Society General Meeting.Calgary, Canada:IEEE PES, 2009:1-6.
[64]  袁越, 吴博文, 李振杰, 等.基于多场景概率的含大型风电场的输电网柔性规划[J].电力自动化设备, 2009, 29(10):8-12.
[65]  Yuan Yue, Wu Bowen, Li Zhenjie, et al.Flexible planning of transmission system with large wind farm based on multi-scenario probability[J].Electric Power Automation Equipment, 2009, 29(10):8-12(in Chinese).
[66]  周金辉, 余贻鑫, 曾沅.大规模风电接入下输电网扩展规划的启发式优化算法[J].电力系统自动化, 2011, 35(22):66-70.
[67]  Zhou Jinhui, Yu Yixin, Zeng Yuan.Heuristic optimization algorithm for transmission network expansion planning with large-scale wind power integration[J].Automation of Electric Power Systems, 2011, 35(22):66-70(in Chinese).
[68]  Gu Yang, McCalley J D, Ni M.Coordinating large-scale wind integration and transmission planning[J].IEEE Transactions on Sustainable Energy, 2012, 3(4):652-659.
[69]  Karki R, Hu P, Billinton R.Adequacy criteria and methods for wind power transmission planning[C]//IEEE Power & Energy Society General Meeting.Calgary, Canada:IEEE PES, 2009:1-7.
[70]  陈远.风电场接入系统规划设计研究[D].保定:华北电力大学, 2010.
[71]  Chen Yuan.Research on planning and design of wind farm integration[D].Baoding:North China Electric Power University, 2010(in Chinese).