邱威, 张建华, 刘念. 含大型风电场的环境经济调度模型与解法[J]. 中国电机工程学报, 2011, 31(19): 8-16. Qiu Wei, Zhang Jianhua, Liu Nian. Model and solution for environmental/economic dispatch conside- ring large-scale wind power penetration[J]. Procee- dings of the CSEE, 2011, 31(19): 8-16.
[2]
周明, 娄雅融. 兼顾购电费用和煤耗的双目标加权模糊发电调度模型[J]. 电网技术, 2010, 34(11): 140-145. Zhou Ming, Lou Yarong. A bi-objective weighted fuzzy generation dispatching model considering both power purchase cost and coal consumption[J]. Power System Technology, 2010, 34(11): 140-145.
[3]
喻洁, 李萍, 王蓓蓓, 等. 市场机制下考虑节能环保的日计划新方式[J]. 电力系统及其自动化学报, 2008, 20(6): 64-69. Yu Jie, Li Ping, Wang Beibei, et al. New model of daily schedule considering energy-saving and environ- ment-protecting under market mechanism[J]. Procee- dings of the CSU-EPSA, 2008, 20(6): 64-69.
[4]
Cai Jiejin, Ma Xiaoqian, Li Qiong. A multi-objective chaotic ant swarm optimization for environmental/ economic dispatch[J]. Electrical Power and Energy Systems, 2010, 32(5): 337-344.
[5]
Das I, Dennis J E. Normal-boundary intersection: a new method for generating the Pareto surface in nonlinear multicriteria optimization problems[J]. SIAM Journal of Optimization, 1998, 8(3): 631-657.
[6]
王锡凡, 方万良, 杜正春. 现代电力系统分析[M]. 北京: 科学出版社, 2003.
[7]
刘明波, 谢敏, 赵维兴著. 大电网最优潮流计算[M]. 北京: 科学出版社, 2010.
[8]
张博建. 房地产上市公司投资价值研究[D]. 哈尔滨: 哈尔滨工业大学, 2010.
[9]
周玮, 彭昱, 孙辉, 等. 含风电场的电力系统动态经济调度[J]. 中国电机工程学报, 2009, 29(25): 13-18. Zhou Wei, Peng Yu, Sun Hui, et al. Dynamic economic dispatch in wind power integrated system[J]. Proceedings of the CSEE, 2009, 29(25): 13-18.
[10]
韩学山, 柳焯. 考虑机组爬坡速度和网络安全约束的经济调度解耦算法[J]. 电力系统自动化, 2002, 26(13): 32-37. Han Xueshan, Liu Zhuo. Decoupled economic dispatch including unit ramp rate and network security constraints[J]. Automation of Electric Power Systems, 2002, 26(13): 32-37.
[11]
陈旭, 左郑敏. 抽水蓄能电站在广东的发展分析[J]. 电网技术, 2006, 30(5): 56-61. Chen Xu, Zuo Zhengmin. Analysis on development of pumped-storage station in Guangdong province[J]. Power System Technology, 2006, 30(5): 56-61.
陈道君, 龚庆武, 乔卉, 等. 采用改进生物地理学算法的风电并网电力系统多目标发电调度[J]. 中国电机工程学报, 2012, 32(31): 150-158. Chen Daojun, Gong Qingwu, Qiao Hui, et al. Multi- objective generation dispatching for wind power integrated system adopting improved biogeography- based optimization algorithm[J]. Proceedings of the CSEE, 2012, 32(31): 150-158.
[14]
Roman C, Rosehart W. Evenly distributed Pareto points in multi-objective optimal power flow[J]. IEEE Transactions on Power Systems, 2006, 21(2): 1011- 1012.
[15]
Jia Z Y, Ierapetritou M G. Generate Pareto optimal solutions of scheduling problems using normal boundary intersection technique[J]. Computers and Chemical Engineering, 2007, 31(4): 268-280.
[16]
熊宁, 程浩忠, 马则良, 等. 发电机出力成本与负荷裕度置换度指标的NBI求解方法[J]. 电力系统自动化, 2010, 34(5): 34-37. Xiong Ning, Cheng Haozhong, Ma Zeliang, et al. The determination of substitute degree between generation cost and loading margin based on NBI method[J]. Automation of Electric Power Systems, 2010, 34(5): 34-37.
[17]
柳璐, 程浩忠, 马则良, 等. 考虑全寿命周期成本的输电网多目标规划[J]. 中国电机工程学报, 2012, 32(22): 46-54. Liu Lu, Cheng Haozhong, Ma Zeliang, et al. Multi- objective transmission expansion planning considering life cycle cost[J]. Proceedings of the CSEE, 2012, 32(22): 46-54.
[18]
贺舟. 基于优先级和多目标决策算法求解时间表问题的研究[D]. 北京: 北京邮电大学, 2011.
[19]
夏澍, 周明, 李庚银. 含大规模风电场的电力系统动态经济调度[J]. 电力系统保护与控制, 2011, 3(13): 71-77. Xia Shu, Zhou Ming, Li Gengyin. Dynamic economic dispatch of power system containing large-scale wind farm[J]. Power System Protection and Control, 2011, 3(13): 71-77.