Yu Kun,Cao Yijia,Chen Xingying,et al.Reactive power and voltage optimization of the district grid with distributed generators[J].Automation of Electric Power Systems,2011,35(8):28-32.
Feng Yongqing,Wu Wenchuan,Zhang Boming,et al.Short-term transmission line maintenance scheduling based on credibility theory[J].Proceeding of the CSEE,2007,27(4):65-71.
Feng Yongqing,Wu Wenchuan,Zhang Boming,et al.Power system operation risk assessment based on credibility theory part three engineering application[J].Automation of Electric Power Systems,2006,30(3):11-16.
Zhao Shuqiang,Li Yong,Wang Chunli.Transmission network expansion planning based on credibility theory[J].Transactions of China Electrotechnical Society,2011,26(6):166-171.
Ai Xin,Liu Xiao.Dynamic economic dispatch for wind farms integrated power system based on credibility theory[J].Proceeding of the CSEE,2011,31(z1):12-18.
Ai Xin,Liu Xiao,Sun Cuiying.A fuzzy chance constrained decision model for unit commitment of power grid containing large-scale wind farm[J].Power System Technology,2011,35(12):202-207.
[17]
徐玖平,李军.多目标决策的理论与方法[M].北京:清华大学出版社,2005.
[18]
Yang X S.A new metheuristic bat-inspired algorithm[J].Nature Inspired Cooperative Strategies for Optimization,2012,284:65-74.
Cheng Junzhao,Li Shusen,Cheng Qiang.A predictor-corrector interior point method for optimal reactive power[J].Transactions of China Electrotechnical Society,2010,25(2):152-157.
Li Xinbin,Zhu Qingjun.Application of improved particle swarm optimization algorithm to multi-objective reactive power optimization[J].Transactions of China Electrotechnical Society,2010,25(7):137-143.
[23]
EL-Dib A A,Youssef H K M,EL-Metwally M M,et al.Optimum VAR sizing and allocation using particle swarm optimization[J].Electric Power Systems Research,2007,77(8):965-972.
Li Zhihuan,Duan Xianzhong.Comparison and analysis of multio-bjective evolutionary algorithm for reactive power optimization[J].Proceedings of the CSEE,2010,30(10):57-65.
[26]
Liu X,Xu W.Economic load dispatch constrained by wind power availability:a here-and-now approach[J].IEEE Transactions on Sustainable Energy,2010,1(1):2-9.
Li Hongxin,Li Yinhong,Chen Jinfu,et al.Multiple evolutionary algorithms with adaptive selection strategies for multi-objective optimal reactive power flow[J].Proceedings of the CSEE,2013,33(10):71-78.
Wang Hanyun,Hu Hua,Zhu Weidong,et al.The impact of parameter uncertainty on reactive souurce optimization[J].Proceedings of the CSEE,2005,25(13):24-28.
Zhao Jingjing,Fu Yang,Li Dongdong.Reactive power optimization in distribution network considering reactive power regulation capability of DFIG wind farm[J].Automation of Electric Power Systems,2011,35(11):33-38.
He Yuqing,Peng Jianchun,Mao Lilin,et al.Reactive power optimization in distribution system with multiple wind power generators[J].Automation of Electric Power Systems,2010,34(19):37-41.
[37]
Hong Yingyi,Luo Yifeng.Optimal VAR control considering wind farms using probabilistic load-flow and gray-based genetic algorithms[J].Transactions Power Delivery,2009,24(3):1441-1449.
Wang Chun,Gao Yuanhai.Probability statistics based reactive power optimization of distribution network containing intermittent distributed generations[J].Power System Technology,2014,38(4):1032-1037.
[40]
Chen Peiyuan,Siano P,Bak-Jensen B,et al.Stochastic optimization of wind turbine power factor using stochastic model of wind power[J].IEEE Transactions on Sustainable Energy,2009,1(1):19-29.
Xiong Hu,Xiang Tieyuan,Chen Hongkun,et al.Research of fuzzy chance constrained unit commitment containing large-scale intermittent power[J].Proceedings of the CSEE,2013,33(13):36-44.