Ribrant J,Bertling L M.Survey of failures in wind power systems with focus on Swedish wind power plants during 1997-2005[J].IEEE Transactions on Energy Conversion,2007,22(1):167-173.
[2]
Tavner P,Gindele R,Faulstich S,et al.Study of effects of weather & location on wind turbine failure rates[C].European Wind Energy Conference (EWEC),Berlin,2010:1-10.
[3]
Tavner P J,Xiang J,Spinato F.Reliability analysis for wind turbines[J].Wind Energy,2007,10(1):1-18.
[4]
Yang S,Bryant A,Mawby P,et al.An industry-based survey of reliability in power electronic converters[J].IEEE Transactions Industry Applications,2011,47(3):1441-1451.
Yang Zhengui,Zhou Luowei,Du Xiong,et al.Effects of different parameters on reliability of grid side converters based on varied junction temperature in wind turbine devices[J].Proceedings of the CSEE,2013,33(30):41-49.
[11]
D’Arco S,Undeland T M,Bohllander M,et al.A simplified algorithm for predicting power cycling lifetime in direct drive wind power systems[C].The IEEE 9th International Multi-Conference on Systems,Signals and Devices (SSD),Chemnitz,2012:1-6.
[12]
Ma K,Liserre M,Blaabjerg F,et al.Thermal loading and lifetime estimation for power device considering mission profiles in wind power converter[J].IEEE Transactions Power Electronics,2014,30(2):590-602.
[13]
Wei L,Kerkman R J,Lukaszewski R A,et al.Analysis of IGBT power cycling capabilities used in doubly fed induction generator wind power system[J].IEEE Transactions on Industry Applications,2011,47(4):1794-1801.
[14]
Fuchs F,Mertens A.Steady state lifetime estimation of the power semiconductors in the rotor side converter of a 2 MW DFIG wind turbine via power cycling capability analysis[C].The 14th European Conference on Power Electronics and Applications (EPE),Birmingham,2011:1-8.
[15]
Jangamshetti S H,Rau V G.Site matching of wind turbine generators:a case study[J].IEEE Transactions on Energy Conversion,1999,14(4):1537-1543.
[16]
Lutz J,Schlangenotto H,Scheuermann U,et al.Semiconductor Power Devices[M].New York:IEEE Press,2011:360-368.
Li G,Du X,Sun P,et al.Numerical IGBT junction temperature calculation method for lifetime estimation of power semiconductors in the wind power converters[C].The IEEE International Power Electronics Application Conference and Exposition,Shanghai,2014:1-7.
[19]
Busca C,Teodorescu R,Blaabjerg F,et al.An overview of the reliability prediction related aspects of high power IGBTs in wind power applications[J].Microelectronics Reliability,2011,51(9-11):1903-1907.
[20]
Morozumi A,Yamada K,Miyasaka T,et al.Reliability of power cycling for IGBT power semiconductor modules[J].IEEE Transactions on Industry Applications,2003,39(3):665-671.
[21]
Reinhold B,Tobias H,Thomas L,et al.Model for power cycling lifetime of IGBT modules-various factors influencing lifetime[C].The 5th International Conference on Integrated Power Systems,Nuremberg,2008:1-6.
[22]
Gokcek M,Bayulken A,Bekdemir S.Investigation of wind characteristics and wind energy potential in Kirklareli,Turkey[J].Renewable Energy,2007,32(10):1739-1752.
[23]
Burgos R,Chen G,Wang F,et al.Reliability-oriented design of three-phase power converters for aircraft applications[J].IEEE Transactions on Aerospace Electronic Systems,2012,48(2):1249-1263.
[24]
Weiss D,Eckel H G.Fundamental frequency and mission profile wearout of IGBT in DFIG converters for wind power[C].The 15th European Conference on Power Electronics and Applications,Lille,2013:1-6.
Dun laoghaire harbor company[EB/OL].2012[2012-12-01].http://www.dlharbour.ie/.
[27]
Wei L,McGuire J,Lukaszewski R A.Analysis of PWM frequency control to improve the lifetime of PWM inverter[J].IEEE Transactions on Industry Applications,2011,47(2):922-929.
[28]
Wang X,Castellazzi A,Zanchetta P.Regulated cooling for reduced thermal cycling of power devices[C].The 7th International Power Electronics and Motion Control Conference (IPEMC),Harbin,2012:238-244.