Alvarado F J R, Kirsh D, Stevenson L. The value of transactions security[R]. Electric Power Research Institute Report, RP4000-14, 1993.
[2]
Liu F B, Li Y, et al. A novel strategy of pricing for steady-state security in deregulated environment[C]. Proceeding of IEEE Power Engineering Society Winter Meeting, 2002, 1(1): 428-433.
[3]
Kuo D H, Bose A. A generation rescheduling method to increase the dynamic security of power systems[J]. IEEE Transactions on Power Systems, 1995, 10(1): 68-75.
[4]
Milano F, Canizares C A, Invernizzi M. Multiobjective optimization for pricing system security in electricity markets[J]. IEEE Transactions on Power Systems, 2003, 18(2): 596-604.
[5]
McCalley J D, Vittal V, Wan H, et al. Voltage risk assessment[C]. In Proceedings IEEE Power Engineering Society Summer Meeting, Edmonton, 1999: 179-184.
[6]
Singh H. The art of market design[J]. IEEE Power and Energy Magazine, 2003, 1(5): 12-16.
[7]
Canizares C A, Chen H, Rosehart W. Pricing system security in electricity markets[C]. In: Proceedings Bulk Power Systems Dynamics and Control-V, Onomichi, Japan, 2001: 1-11.
[8]
Chen H. Security cost analysis in electricity markets based on voltage security criteria and web-based implementation[D]. University of Waterloo, 2002.
Guan X H, Luh P B, Prasannan B. Power system scheduling with fuzzy reserve requirements[J]. IEEE Transactions on Power Systems, 1996, 11(2): 864-869.
[12]
Kaye R J, Wu F F, Varaiya P. Pricing for system security[J]. IEEE Transactions on Power Systems, 1995, 10(2): 575-583.
[13]
Ni M, McCalley J D, Vittal V, et al. Online risk-based security assessment[J]. IEEE Transactions on Power Systems, 2003, 18(1): 258-265.
[14]
Wan H, McCalley J D, Vittal V. Risk based voltage security assessment[J]. IEEE Transactions on Power Systems, 2000, 15(4): 1247-1254.
[15]
David A K, Lin X J. Dynamic security enhancement in power market systems[J]. IEEE Transactions on Power Systems, 2002, 17(2): 431-438.
[16]
Rajaraman R, Sarlashkar J V, Alvarado F L. The effect of demand elasticity on security prices for the PoolCo and multi-lateral contract models[J]. IEEE Transactions on Power Systems, 1997, 12(3): 1177-1184.