Billinton R, Wangdee W. Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation[J]. IEEE Trans. on Power Systems, 2006, 21(1): 345-351.
[5]
Wangdee W, Billinton R. Bulk electric system well-being analysis using sequential Monte Carlo simulation[J]. IEEE Transactions on Power Systems, 2006, 21(1): 188-193.
[6]
Billinton R, Wangdee W. Predicting bulk electricity system reliability performance indices using sequential Monte Carlo simulation[J]. IEEE Transactions on Power Delivery, 2006, 21(2): 909- 917.
[7]
Billinton R, Wangdee W. Impact of utilising sequential and nonsequential simulation techniques in bulk- electric-system reliability assessment[J]. IEE Proceedings of Generation, Transmission and Distribution, 2005, 152(5): 623-628.
Billinton R, Kumar S N, Chowdhury N, et al. A reliability test system for educational purposes-basic data[J]. IEEE Trans. on Power Systems, 1989, 4(3): 1238-1244.
[16]
IEEE Subcommittee. IEEE reliability test system[J]. IEEE Trans. on Power Apparatus and Systems, 1979, PAS-98(6): 2047-2054.
[17]
Silverman B W. Density estimation for statistics and data analysis [M]. London: Chapman and Hall, 1986.
[18]
Wand M P, Jones M C. Kernel Smoothing[M]. London: Chapman and Hall, 1995.