Souza O H, Barbieri N. Study of hydraulic transients in hydropower plants through simulation of nonlinear model of penstock and hydraulic turbine model [J]. IEEE Trans. on Power Systems, 1999, 14(4): 1269- 1272.
Andre Turgeon. Daily operation of reservoir subject to yearly probabilistic constraints[J]. Journal of Water Resources Planning and Management, 2005, 10(9): 342-350.
[5]
Naresh R, Sharma J. Hydro system scheduling using ANN aproach[J]. IEEE Trans. on Power Systems, 2000, 15(1): 388-395.
Chang G W, Aganagic M, Waight J G, et al. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling[J]. IEEE Trans. on Power Systems, 2001, 16(4): 743- 749.
[9]
IEEE working group. Hgdraulic turbine and turbine control models for system dynamic studies[J]. IEEE Trans. on Power Systems, 1992, 7(1): 167-179.
Lyra C, Ferreira L R M. A multiobjective approach to the short-term scheduling of a hydroelectric power system[J]. IEEE Trans. on Power Systems, 1995, 10(4): 1750-1755.
[14]
Arnold E, Tatjewski P, Wolochowicz P. Two methods for large-scale nonlinear optimization and their comparison on a case study of hydropower optimization[J]. Journal of Optimization Theory and Applications, 1994, 81(2): 221-248.