Billinton R, Khan E. A security based approach to composite power system reliability evaluation[J]. IEEE Transactions on Power Systems, 1992, 7(7): 65-72.
[2]
Borges C L T, Falcao D M, Mellon J C O. Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environment[J]. IEEE Transactions on Power Systems, 2001, 16(2): 203-208.
[3]
Singh C, Gubbala N V. An alternative approach to rounding off generation models in power system reliability evaluation[J]. Electric Power System Research, 1996, 36(1): 37-44.
[4]
Billinton R, Allan R N. Reliability evaluation of power systems[M]. 2nd ed. New York: Plenum Press, 1996.
[5]
Aboreshaid S, Billinton R. A framework for incor- porating voltage and transient stability considerations in well-being evaluation of composite power systems [C]. IEEE Power engineering Society Summer Meeting, Edmonton, Canada, 1999, 1: 219-224.
[6]
Allan R N, Billinton R, Breipohl A M, et al. Bibli- ography on the application of probability methods in power system reliability evaluation: 1992-1996[J]. IEEE Transactions on Power Systems, 1999, 14(1): 51-57.
[7]
Billinton R, Fotuhi Firuzabad M, Bertling L. Biblio- graphy on the application of probability methods in power system reliability evaluation: 1996-1999[J]. IEEE Transactions on Power Systems, 2001, 16(4): 595-602.
[8]
Billinton R, Kumar S, Chowdury N, et al. A reliability test system for educational purposes[J]. IEEE Trans- actions on Power Systems, 1989, 4(3): 1238-1244.
[9]
Tollefson G, Billinton R, Wacker G, et al. A Canadian customer survey to assess power system reliability worth[J]. IEEE Transactions on Power Systems, 1994, 9 (1): 443-450.
[10]
Celo M, Bualoti R. Integrated indices that reflect reliability assessment for generation and transmission network[C]. IEEE Mediterranean Electrotechnical Conference, Benalmadena (Malaga), Spain, 2006: 978-981.
[11]
Lu M, Dong Z Y, Saha T K. A framework for transmission planning in a competitive electricity market[C]. 2005 IEEE/PES Transmission and Distri- bution Conference & Exhibition: Asia and Pacific, DaLian, China, 2005: 1-6.
[12]
Singh C, Mitra J. Composite system reliability eval- uation using state space pruning[J]. IEEE Transactions on Power Systems, 1997, 12 (1): 471-479.
[13]
Greatbanks J A, Pregelj A, Green T C. On optimi- zation for security and reliability of power systems with distributed generation[C]. 2003 IEEE Bologna Powe Tech Conference, Bologna, Italy, 2003, 1: 1-8.
[14]
Jonnavithula S, Billinton R. Cost-benefit analysis of generation additions in system planning[J]. IEE Proceedings-Generation, Transmission & Distribution, 1998, 145(3): 288-292.
[15]
Okada K, Kitamura M, Asano H, et al. Cost-benefit analysis of reliability management by transmission expansion planning in the competitive electric power market[C]. International Conference on Power System Technology, Perth, Australia, 2000, 2: 709-714.
[16]
Ding Y, Wang P, Goel L, et al. Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques[J]. Electric Power Systems Research, 2007, 77 (12): 1665-1671.
[17]
Khan M E. Bulk load points reliability evaluation using a security based model[J]. IEEE Transactions on Power Systems, 1998, 13 (2): 456-463.
[18]
Allan R N, Billinton R, Breipohl A M, et al. Bibli- ography on the application of probability methods in power system reliability evaluation: 1987-1991[J]. IEEE Transactions on Power Systems, 1994, 9(1): 41-49.
[19]
Billinton R, Fotuhi Firuzabad M. A reliability fram- ework for generating unit commitment[J]. Electric Power Systems Research, 2000, 56(1): 81-88.
[20]
Chowdhury A A, Koval D O. Application of customer interruption costs in transmission network reliability planning[J]. IEEE Transactions on Industry Appli- cations, 2001, 37(6): 1590-1596.
[21]
Neudorf E G, Kiguel D L, Hamoud G A, et al. Cost- benefit analysis of power system reliability: two utility case studies[J]. IEEE Transactions on Power Systems, 1995, 10(3): 1667-1675.