Tarantola S, Gatelli D, Mara T A.Random balance design for the estimation of first order global sensitivity indices[J].Reliability Engineering and System Safety, 2006, 91 (6):717-727
[2]
Homma T, Tomita K, Hato S.Uncertainty and sensitivity studies with the probabilistic accident consequence assessment code OSCAAR[J].Nuclear Engineering and Technology, 2005, 37 (3):245-257
[3]
冯强, 曾声奎, 康锐.基于MAS的舰载机动态调度模型[J].航空学报, 2009, 30 (11):2119-2125 Feng Qiang, Zeng Shengkui, Kang Rui.A MAS-based model for dynamic scheduling of carrier aircraft[J].Chinese Journal of Aeronautics, 2009, 30 (11):2119-2125 (in Chinese)
[4]
Pritsker A A B.GERT graphical evaluation and review technique[M].Santa Monica, CAL, USA:Rand Corporation, 1966
[5]
Whitehouse G E.Systems analysis and design using network techniques[M].Englewood Cliffs, New Jersey:Prentice-Hall, 1973:243-250
[6]
Jewel A.Sortie generation capacity of embarked airwings.ADA359178, 1998
[7]
Jewell A, Wiggle M A, Gagnon C M, et al.USS nimitz and carrier airwing nine surge emonstration[R].ADA362472, 1998
[8]
Borgonovo E.A new uncertainty importance measure[J].Reliability Engineering and System Safety, 2007, 92 (6):771-784
[9]
Tarantola S, Gatelli D, Mara T A.Random balance design for the estimation of first order global sensitivity indices[J].Reliability Engineering and System Safety, 2006, 91 (6):717-727
[10]
王学望, 康锐, 张侦英, 等.任务驱动的保障活动时间优化[J].计算机集成制造系统, 2010, 16 (10):2227-2232 Wang Xuewang, Kang Rui, Zhang Zhenying, et al.Task driven support activity time optimization[J].Computer Integrated Manufacturing Systems, 2010, 16 (10):2227-2232 (in Chinese)
[11]
Apostolakis G E.How useful is quantitative risk assessment?[J] Risk Analysis, 2004, 24 (3):515-520
[12]
Homma T, Tomita K, Hato S.Uncertainty and sensitivity studies with the probabilistic accident consequence assessment code OSCAAR[J].Nuclear Engineering and Technology, 2005, 37 (3):245-257
[13]
冯强, 曾声奎, 康锐.基于MAS的舰载机动态调度模型[J].航空学报, 2009, 30 (11):2119-2125 Feng Qiang, Zeng Shengkui, Kang Rui.A MAS-based model for dynamic scheduling of carrier aircraft[J].Chinese Journal of Aeronautics, 2009, 30 (11):2119-2125 (in Chinese)
[14]
文佳, 康锐, 刘瑞, 等.基于保障活动流程的保障设备需求量计算模型[J].系统工程与电子技术, 2010, 32 (09):1903-1906 Wen Jia, Kang Rui, Liu Rui, et al.Quantitative forecast model of support equipment based on support activity flow[J].Systems Engineering and Electronics, 2010, 32 (09):1903-1906 (in Chinese)
[15]
王雷.装备战场抢修时间计划研究[D].长沙:国防科学技术大学信息系统与管理学院, 2010 Wang Lei.Research on time schedule plan for battle field damage assessment and repair[D].Changsha:School of Information System and Management, National University of Defense Technology, 2010 (in Chinese)
[16]
Pritsker A A B.GERT graphical evaluation and review technique[M].Santa Monica, CAL, USA:Rand Corporation, 1966
[17]
Qiao Liu, Toshimitsu Homma.A new computational method of a moment-independent uncertainty importance measure[J] Reliability Engineering and System Safety, 2009, 94 (1):1205-1211
[18]
Whitehouse G E.Systems analysis and design using network techniques[M].Englewood Cliffs, New Jersey:Prentice-Hall, 1973:243-250
Morris M D.Factorial sampling plans for preliminary computational experiments[J].Technometrics, 1991, 33 (2):161-174
[21]
Saltelli A, Tarantola S, Campolongo F.Sensitivity analysis as an ingredient of modeling[J].Statistical Science, 2000, 15 (4):377-395
[22]
Saltelli A.Sensitivity analysis for importance assessment[J].Risk Analysis, 2002, 22 (3):579-590
[23]
Jewel A.Sortie generation capacity of embarked airwings.ADA359178, 1998
[24]
Helton J C, Davis F J, Johnson J D.A comparison of uncertainty and sensitivity analysis results obtained with random and Latin hypercube sampling[J].Reliability Engineering and System Safety, 2005, 89 (3):305-330
[25]
Patelli E, Pradlwarter H J, Schuёller G I.Global sensitivity of structural variability by random sampling[J].Computer Physics Communications, 2010, 181 (12):2072-2081
[26]
Jewell A, Wiggle M A, Gagnon C M, et al.USS nimitz and carrier airwing nine surge emonstration[R].ADA362472, 1998
[27]
Borgonovo E.A new uncertainty importance measure[J].Reliability Engineering and System Safety, 2007, 92 (6):771-784