基于PERT网络的航空弹药保障人员优化配置

, PP. 69-74

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对航空弹药保障效率和可靠性要求高的问题,在分析保障流程的计划评审技术(PERT,ProgramEvaluationandReviewTechnique)网络图中各工序对任务完工影响程度的基础上,提取了工序关键度指标和重要度指标以及各方案下的按期完工概率,建立了保障人员配置方案评价指标体系,表示为评价函数形式.以基于蒙特卡洛方法的PERT网络仿真为核心,选择在遗传算法进化寻优框架下构建优化模型,该方法不仅得到了最优的保障人员配置方案,而且评估了需要注重的关键工序.算例实验证实了其有效性与实用性.

References

[1]  盛骤, 谢式千, 潘承毅.概率论与数理统计[M].4版.北京:高等教育出版社, 2008:119-126 Sheng Zhou, Xie Shiqian, Pan Chengyi.Probability theory & mathematical statistics[M].4th ed.Beijing:Higher Education Press, 2008:119-126(in Chinese)
[2]  Cho J G, Yum B J.Functional estimation of activity criticality indices and sensitivity analysis of expected project completion time[J].Journal of Operational Research Society, 2004, 55(8): 850-859
[3]  Azaron A, Tavakkoli-Moghaddam R.A multi-objective resource allocation problem in dynamic PERT networks[J].Applied Mathematics and Computation, 2006, 181:163-174
[4]  Premachandra I M.An approximation of the activity duration distribution in PERT[J].Computers & Operations Research, 2001, 28:443-452
[5]  段建中, 李民奎.PERT行为时间参数近似计算公式选优[J].合肥工业大学学报:自然科学版, 2001, 24(3): 365-369 Duan Jianzhong, Li Minkui.Optimizing estimation of PERT activity time parameters[J].Journal of Hefei University of Technology:Natural Science, 2001, 24(3):365-369(in Chinese)
[6]  Kong Xiangxing, Zhang Xuan, Hou Zhenting.Markov skeleton process in pert networks[J].Acta Mathematica Scientia, 2010, 30B(5):1440-1448
[7]  Fatemi G S M T, Teimouri E.Path critical index and activity critical index in PERT networks[J].European Journal of Operational Research, 2002, 141(2):147-152
[8]  李学京.置信分布的贝塔分布近似及其在可靠性统计中的应用[J].强度与环境, 2007, 34(2):17-23 Li Xuejing.Beta distribution approximation of confidence distributions and application in reliability statistics[J].Structure & Environment Engineering, 2007, 34(2):17-23(in Chinese)
[9]  王卓甫, 丁继勇, 刘媛, 等.基于Monte Carlo方法的PERT网 络关键路线和最关键活动分析[J].系统工程与电子技术, 2012, 34(8):1646-1651 Wang Zhuofu, Ding Jiyong, Liu Yuan, et al.Analysis of critical path and most critical activity in PERT networks based on Monte Carlo method[J].Systems Engineering and Electronics, 2012, 34(8) :1646-1651(in Chinese)
[10]  唐建, 严骏, 凌海风, 等.基于随机PERT网络Monte-Carlo仿真的任务可靠性分析[J].计算机应用研究, 2012, 29(8):2948-2951 Tang Jian, Yan Jun, Ling Haifeng, et al.Mission reliability analysis based on Monte-Carlo simulation of stochastic PERT network[J].Application Research of Computers, 2012, 29(8):2948-2951(in Chinese)
[11]  Baradaran S, Fatemi Ghomi S M T, Mobini M, et al.A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks[J].Advances in Engineering Software, 2010, 41:966-975
[12]  Bowman R A.Efficient sensitivity analysis of PERT network performance measures to significant changes in activity time parameters[J].Journal of Operational Research Society, 2007, 58(10): 1354-1360
[13]  Azaron A, Perkgoz C, Sakawa M.A genetic algorithm approach for the time-cost trade-off in PERT networks[J].Applied Mathematics and Computation, 2005, 168:1317-1339
[14]  Azaron A, Tavakkoli-Moghaddam R.A multi-objective resource allocation problem in dynamic PERT networks[J].Applied Mathematics and Computation, 2006, 181:163-174
[15]  Kong Xiangxing, Zhang Xuan, Hou Zhenting.Markov skeleton process in pert networks[J].Acta Mathematica Scientia, 2010, 30B(5):1440-1448
[16]  李学京.置信分布的贝塔分布近似及其在可靠性统计中的应用[J].强度与环境, 2007, 34(2):17-23 Li Xuejing.Beta distribution approximation of confidence distributions and application in reliability statistics[J].Structure & Environment Engineering, 2007, 34(2):17-23(in Chinese)
[17]  盛骤, 谢式千, 潘承毅.概率论与数理统计[M].4版.北京:高等教育出版社, 2008:119-126 Sheng Zhou, Xie Shiqian, Pan Chengyi.Probability theory & mathematical statistics[M].4th ed.Beijing:Higher Education Press, 2008:119-126(in Chinese)
[18]  马登武, 郭小威, 邓力.基于改进蚁群算法的舰载机弹药调度[J].系统仿真学报, 2012, 24(6):1207-1211 Ma Dengwu, Guo Xiaowei, Deng Li.Ammunition scheduling of carrier-based aircraft based on modified ant colony algorithm[J].Journal of System Simulation, 2012, 24(6):1207-1211(in Chinese)
[19]  唐建, 严骏, 凌海风, 等.基于随机PERT网络Monte-Carlo仿真的任务可靠性分析[J].计算机应用研究, 2012, 29(8):2948-2951 Tang Jian, Yan Jun, Ling Haifeng, et al.Mission reliability analysis based on Monte-Carlo simulation of stochastic PERT network[J].Application Research of Computers, 2012, 29(8):2948-2951(in Chinese)
[20]  Baradaran S, Fatemi Ghomi S M T, Mobini M, et al.A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks[J].Advances in Engineering Software, 2010, 41:966-975
[21]  Bowman R A.Efficient sensitivity analysis of PERT network performance measures to significant changes in activity time parameters[J].Journal of Operational Research Society, 2007, 58(10): 1354-1360
[22]  马登武, 郭小威, 吕晓峰.基于网络计划技术的舰载机航空导弹转运流程[J].兵工自动化, 2010, 29(9):48-51 Ma Dengwu, Guo Xiaowei, Lü Xiaofeng.Airborne missile transport process of carrier-based aircraft based on network planning techniques[J].Ordnance Industry Automation, 2010, 29(9): 48-51(in Chinese)
[23]  Azaron A, Perkgoz C, Sakawa M.A genetic algorithm approach for the time-cost trade-off in PERT networks[J].Applied Mathematics and Computation, 2005, 168:1317-1339
[24]  José Manuel Herrerías-Velasco, Rafael Herrerías-Pleguezuelo, Johan René van Dorp.Revisiting the PERT mean and variance[J].European Journal of Operational Research, 2011, 210: 448-451
[25]  Castroa J, Gómeza D, Tejada J.A polynomial rule for the problem of sharing delay costs in PERT networks[J].Computers & Operations Research, 2008, 35:2376-2387