[J].铁道建筑,2005(3):45-48.CHEN Dongrui.Design and Construction of Treatment Scheme for Side-slope Adjacent to Tunnel Portal
[3]
王祥秋,杨林德,高文化.高速公路偏压隧道施工动态监测与有限元仿真模拟
[4]
[J].岩石力学与工程学报,2005,24(2):284-289.WANG Xiangqiu,YANG Linde,GAO Wenhua.Dynamic Monitoring and FEM Simulation Analysis of an Expressway Tunnel with Unsymmetrical Loadings
[5]
张玉芳,李奇平,张治平.预应力锚索抗滑桩工程中锚索拉力实测与分析
[6]
[J].中国铁道科学,2003,24(3):22-26.ZHANG Yufang,LI Qiping,ZHANG Zhiping.Measuring and Analyzing Tension Force of Anchor Cable in Anti-slide Pile with Pre-stressed Anchor Cable
[7]
[J].China Railway Science,2003,24(3):22-26.
[8]
晏启祥,何川,姚勇.软岩小净距隧道施工力学效应研究
[9]
[J].地下空间与工程学报,2005,1(5)693-697.YAN Qixiang,HE Chuan,YAO Yong.Study on Mechanical Effect of Small-distance Tunnels Located at Soft Ground
[10]
[J].Chinese Journal of Underground Space and Engineering,2005,1(5):693-697.
[11]
[J].公路交通科技,2008,2,4(2):106-112.WANG Hanpeng,LI Shucai,ZHENG Xuefen.Stability and Monitoring on Construction Process of Expressway Forked Tunnel
[12]
[J].Journal of Highway and Transportation Research and Development,2008,24(2):106-112.
[13]
陈强,韩军,艾凯.某高速公路山体边坡变形监测与分析
[14]
[J].Railway Engineering,2005(3):45-48.
[15]
[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(2):284-289.
[16]
杨小礼,眭志荣.浅埋小净距偏压隧道施工工序的数值分析计算
[17]
[J].中南大学学报:自然科学版,2007,38(4):764-770.YANG Xiaoli,SUI Zhirong.Numerical Simulation of Construction Sequence for Shallow Embedded Bias Tunnels with Small Chear Distance
[18]
[J].Journal of Central South University:Science and Technology,2007,38(4):764-770.
[19]
徐银龙.桩板墙加固隧道及路堑施工技术
[20]
[J].铁道工程学报,1996(3):101-105.XU Yinlong.Construction Technique for Strengthening Tunnel and Side Slope of Cut by Retaining Wall with Piles and Concrete Plates
[21]
[J].Journal of Railway Engineering Society,1996(3):101-105.
[22]
靳晓光,刘伟,郑学贵.小净距偏压公路隧道开挖顺序优化
[23]
[J].公路交通科技,2005,22(8):61-64.JIN Xiaoguang,LIU Wei,ZHENG Xuegui.Optimization of Excavating Sequence for Closely Spaced Bias Double-tube Tunnels
[24]
[J].Journal of Highway and Transportation Research and Development,2005,22(8):61-64.
[25]
王汉鹏,李术才,郑学芬.高速公路分岔隧道施工过程稳定性分析与监测研究
[26]
[J].岩石力学与工程学报,2004,23(2)299-302.CHEN Qiang,HAN Jun,AI Kai.Monitoring and Analysis of Slope Deformation along a Speedway
[27]
[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(2):299-302.