[J].Journal of Highway and Transportation Research and Development,2003,20 (3):73-76.
[2]
王毅,叶见曙.温度梯度对混凝土曲线箱梁影响的计算方法
[3]
[J].东南大学学报(自然科学版),2005,35(6):924-929.WANG Yi,YE Jian-shu.Computing Method of Effect of Ther-mal Gradient on Concrete Curved Box-girders
[4]
[J].Journal of Southeast University (Natural Science Edition),2005,35 (6):924-929.
[5]
罗旗帜,杜嘉斌,吴幼明,等.连续曲线箱梁模型试验研究
[6]
张元海,李乔.桥梁结构日照温差二次力及温度应力计算方法研究
[7]
[J].中国公路学报,2004,17(1):49-52.ZHANG Yuan-hai,LI Qiao.Study of the Method for Calcula-tion of the Thermal Stress and Secondary Force of Bridge Struc-ture by Solar Radiation
[8]
[J].China Journal of Highway and Transport,2004,17(1):49-52.
[9]
[J].中国公路学报,2004,17(1):53-56.LIU Lai-jun,HE Shuan-hai,SONG Yi-fan.Analysis of Tem-perature Stress in Control of Long-span Bridge Construction
[10]
[J].Bridge Construction,2003 (1):39-42.
[11]
[J].森林工程,2003,19(5):55-57.YANG Xiong-wei,WU Wen-ming.Analysis of Temperature Deformation Control of Long-span PC Box Girder Bridge in Can-tihver Construction
[12]
[J].Forest Engineering,2003,19 (5):55-57.
[13]
龙佩恒,陈惟珍.温度应力对既有混凝土连续箱梁桥开裂的影响分析
[14]
[J].公路交通科技,2007,24(3):68-76.LONG Pei-heng,CHEN Wei-zhen.Analysis of Temperature Stress for Existing Continuons Concrete Box Girders Cracking
[15]
[J].Journal of Southwest Jiaotong University,2006,41 (4):452-455.
[16]
KIM K,YOO C H.Effects of External Bracing on Horizontally Curved Box Girder Bridges during Construction
[J].公路交通科技,2006,23(9):54-57.QI Xing-jun,LI Xiao-jun,TANG Hui.Study on Semi-active Control of Seismic Bond Torsion Coupling for Curved Bridge
[20]
[J].Journal of Highway and Transportation Research and De-velopment,2006,23 (9):54-57.
[21]
程晓东,戴利平,周松国,等.连续曲线箱梁桥的空间有限元分析及试验研究
[22]
[J].公路交通科技,2003,20 (3):73-76.CHENG Xiao-dong,DAI Li-ping,ZHOU Song-guo,et al.Spatial FEM Analysis and Experiments of Continuous Curved Box Girder Bridge
[23]
[J].实验力学,2006,21(4):502-512.LUO Qi-zhi,DU Jia-bin,WU You-ming,et al.A Model Ex-perimental Study of the Continuous Curved Box Girder
[24]
[J].Journal of Experimental Mechanics,2006,21 (4):502-512.
[25]
王钧利,贺拴海.高墩大跨度曲线桥悬臂施工阶段非线性分析
[26]
[J].公路交通科技,2005,22(10):64-67.WANG Jun-li,HE Shuan-hai.Nonlinear Analysis of Long-span Curve Rigid Bridge with High Piers During Cantilever Construc-tion
[27]
[J].Journal of Highway and Transportation Research and Development,2005,22(10):64-67.
[28]
刘来君,贺拴海,宋一凡.大跨径桥梁施工控制温度应力分析
[29]
[J].China Journal of Highway and Transport,2004,17(1):53-56.
[30]
刘成龙,陈强,李振伟.温度对悬臂法施工桥梁长悬臂箱梁标高的影响及其对策
[31]
[J].桥梁建设,2003(1):39-42.LIU Cheng-long,CHEN Qiang,LI Zhen-wei.Influence of Temperature on Elevation of Long Cantilever Box Girder Cast with Balanced Cantilever Method and Countermeasures Against Temperature Influence
[32]
杨雄伟,吴文明.大跨度预应力混凝土箱形梁桥悬臂施工中温度变形控制
[33]
[J].Journal of Highway and Transportation Research and De-velopment,2007,24 (3):68-76.
[34]
彭友松,强士中.混凝土桥梁结构温度自应力计算方法探讨
[35]
[J].西南交通大学学报,2006,41(4):452-455.PENG You-song,QIANG Shi-zhong.Investigation into Compu-tational Method of Self equilibrating Thermal Stress in Concrete Bridges