[J].公路交通科技,2008,25(2):101-105.JIN Xiaoguang,LI Xiaohong.Study on Mechanical Properties of Support Structure of Deep Buried Tunnel Soft and Weak Surrounding Rock in High Situ Stress Area
[3]
[J].Journal of Highway and Transportation Research and Development,2008,25(2):101-105.
[4]
邱祥波,李术才,李树忱.三维地应力场回归分析方法与工程应用
[5]
[J].岩石力学与工程学报,2003,22(10):1613-1617.QIU Xiangbo,LI Shucai,LI Shuchen.3D Geostress Regression Analysis Method and Its Application
[6]
[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(10):1613-1617.
[7]
朱光仪,郭小红,陈卫忠,等.雪峰山公路隧道地应力场反演及工程应用
[8]
[J].中南公路工程,2006,31(1):71-75.ZHU Guangyi,GUO Xiaohong,CHEN Weizhong,et al.Inversion of Insitu Stress and Its Application in Xuefengshan Roadway Tunnel
[9]
[J].Central South Highway Engineering,2006,31(1):71-75.
[10]
杨志法,熊顺成,王存玉,等.关于位移反分析的某些考虑
[11]
[J].岩石力学与工程学报,1995,14(1):11-16.YANG Zhifa,XIONG Shuncheng,WANG Cunyu,et al.Some Consideration of the Back-analysis from Displacements
[12]
[J] Chinese Journal of Rock Mechanics and Engineering,1995,14(1):11-16.
[13]
胡斌,冯夏庭,黄小华,等龙滩水电站左岸高边坡区初始地应力场反演回归分析
[14]
[J].岩石力学与工程学报,2005,24(22):4055-4064.HU Bin,FENG Xiating,HUANG Xiaohua,et al.Regression Analysis of Initial Geostress Field for Left Bank High Slope Region at Longtan Hydropower Station
[15]
[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(22):4055-4064.
[16]
郭怀志,马启超,薛玺成.岩体初始地应力场的分析方法
[17]
[J].岩土工程学报,1983,5(3):64-75.GUO Huaizhi MA Qichao XUE Xicheng.Analysis Method of Initial Geostress Field for Rock Mass
[18]
[J].Chinese Journal of Geotechnical Engineering1983,5(3):64-75.
[19]
杨林德.岩土工程问题的反演理论与工程实践
[20]
[M].北京:科学出版社,1996:314-349.YANG Linde.Inversion Theory and Practice about Geotechnical Engineering
[21]
[M].Beijing:Science Press,1996:314-349.
[22]
李莉,何江达,林正伟,等.糯扎渡水电站地下厂房初始地应力场研究
[23]
[J].红水河,2003,22(4):28-32.LI Li,HE Jiangda,LIN Zhengwei,et al.Study on Initial Geo-stress of Underground Powerhouse of Nuo Zhadu Power Station
[24]
[J].Hongshui River,2003,22(4):28-32.
[25]
董志高,吴继敏,施志群,等.某水电站地下厂房区初始地应力场回归分析
[26]
[J].河海大学学报:自然科学版,2003,31(5):543-546.DONG Zhigao,WU Jimin,SHI Zhiqun,et al.Regression Analysis of Initial Geostress for Underground Power Plant Region
[27]
[J] Journal of Hohai University:Natural Science Edition,2003,31(5):543-546.
[28]
浙江省交通规划设计研究院.苍岭隧道施工图设计工程地质勘察报告
[29]
[R].杭州:浙江省交通规划设计研究院,2004.Zhejiang Provincial Institute of Communications Planning,Design & Research.Geo-report of Construction Drawing for Cangling Tunnel
[30]
[R].Hangzhou:Zhejiang Provincial Institute of Communications Planning,Design & Research,2004.
[31]
吴德兴,杨健.苍岭特长公路隧道岩爆预测和工程对策
[32]
[J].岩石力学与工程学报,2005,24(21):3965-3971.WU Dexing,YANG Jian.Prediction and Countermeasure for Rockburst in Cangling Mountain Highway Tunnel
[33]
[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(21):3965-3971.
[34]
张奇华,钟作武,龚壁新.施加边界位移产生纯剪应力及反分析应用
[35]
[J].长江科学院学报,2000,17(2):34-36.ZHANG Qihua,ZHONG Zuowu,GONG Bixin.Method of Generating Pure Shear Stress by Adding Boundary Displacement and Its Application in Back Analysis for Geostress Field
[36]
[J].Journal of Yangtze River Scientific Research Institute,2000,17(2):34-36.