[D].福州:福州大学,1998.XU Aimin.Research on Thermal Character of Concrete Filled Steel Tube Arch Bridge
[3]
[D].Fuzhou:Fuzhou University,1998.
[4]
范丙臣.中承式钢管混凝土拱桥的温度评价及试验研究
[5]
[D].哈尔滨:哈尔滨工业大学,2001.FAN Bingchen.Thermal Effect Value and Test Study of Half-through CFST Arch Bridge
[6]
[D].Harbin:Harbin Institute of Technology,2001.
[7]
林春姣.钢管混凝土拱计算合龙温度研究
[8]
[D].广西:广西大学,2007.LIN Chunjiao.Research on Calculating Closure Temperature of Concrete Filled Steel Tubular Arch
[9]
[D].Guangxi:Guangxi University,2007.
[10]
柯婷娴.钢管混凝土哑铃形拱的计算温度取值研究
[11]
[D].福州:福州大学,2009.KE Tingxian.Research on Thermal Calculation Magnitude of Concrete Filled Steel Tubular Arch with Dumbbell Cross Section
[12]
[D].Fuzhou:Fuzhou University,2009.
[13]
刘振宇.钢管混凝土桁拱温度问题研究
[14]
[D].福州:福州大学,2010.LIU Zhenyu.Research on Temperature of Concrete Filled Steel Tubular Truss Arch
[15]
[D].Fuzhou:Fuzhou University,2010.
[16]
TANG Shaoqing.A half-through Rigid-Frame Tied CFST Arch Bridge with Two Cantilever Concrete Deck Arches:Xiyangping Bridge in Zhangzhou.China
[17]
[C]//Proceedings of the Fifth International Conference on Arch Bridge.Madeira,Portugal:Portugal Association of Civil Engieers,2007,9:12-14.
[18]
马庆芳,方荣生,项立成.实用热物理性质手册
[19]
[M].北京:中国农业机械出版社,1986.MA Qingfang,FANG Rongsheng,XIANG Licheng.Handbook of Thermo Physical Properties of Material
[20]
[M].Beijing:Agricultural Press,1986.
[21]
西格尔R,豪厄尔J R.热辐射传热
[22]
[M].曹玉璋,黄素逸,陆大有,等译.北京:科学出版社,1990.SIEGEL R,HOWELL J R.Thermal Radiation Heat Transfer
[23]
[M].CAO Yuzhang,HUANG Suyi,LU Dayou,et al translated.Beijing:China Science Press,1990.
[24]
刘振宇,陈宝春.钢管混凝土拱肋施工过程截面温度特性分析
[25]
[J].公路交通科技,2006,23(5):48-52.LIU Zhenyu,CHEN Baochun.Thermal Property Analysis of Concrete Filled Steel Tubular Arch Rib during Construction
[26]
[J].Journal of Highway and Transportation Research and Development,2006,23(5):48-52.
[27]
王铁梦.工程结构裂缝控制
[28]
[M].北京:中国建筑工业出版社,1997.WANG Tiemeng.Control of Cracking in Engineering Structure
[29]
[M].Beijing:China Architecture and Building Press,1997.
[30]
中华人民共和国交通部.JTJ 021-89 公路桥涵设计通用规范
[31]
[S].北京:人民交通出版社,1989.P.R.China.Ministry of Communications.JTJ 021-89 General Code for Design of Highway Bridges and Culverts
[32]
中华人民共和国交通部.JTG D60-2004 公路桥涵设计通用规范
[33]
[S].北京:人民交通出版社,2004.P.R.China.Ministry of Communications.JTG D60-2004 General Code for Design of Highway Bridges and Culverts
[34]
[S].Beijing:China Communications Press,2004.
[35]
陈宝春,刘振宇.钢管混凝土拱桥温度问题研究综述
[36]
[J].福州大学学报:自然科学版,2009,37(3):412-418.CHEN Baochun,LIU Zhenyu.A State-of-art of Research on Temperature Problem of Concrete Filled Steel Tubular Arch Bridge
[37]
[J].Journal of Fuzhou University:Natural Science Edition,2009,37(3):412-418.
[38]
陈宝春,徐爱民,孙潮.钢管混凝土拱桥温度内力计算时温差取值分析
[39]
[J].中国公路学报,2000,13(2):52-56.CHEN Baochun,Xu Aimin,SUN Chao.Analysis of Thermal Difference Magnitude in Thermal Inner Force Calculation of CFST Arch Bridge
[40]
[J].China Journal of Highway and Transport,2000,13(2):52-56.
[41]
[S].Beijing:China Communications Press,1989.
[42]
中华人民共和国铁道部.TB10002.1-99 铁路桥涵设计基本规范
[43]
[S].北京:中国铁道出版社,1999.P.R.China.Ministry of Railways.TB10002.1-99 Fundamental Code for Design on Railway Bridge and Culvert