ENRIGHT M P,FRANGOPOL D M.Survey and Evaluation of Damaged Concrete Bridges[J].Journal of Bridge Engineering,ASCE,2000,5(1):31-38.
[2]
NOWAK A S,KIM S J,STANKIEWICZ P R.Analysis and Diagnostic Testing of a Bridge[J].Computers & Structures,2000,77(1):91-100.
[3]
BROWNJOHN J M W,MOYO P,OMENZETTER P,et al.Assessment of Highway Bridge Upgrading by Dynamic Testing and Finite Element Model Updating[J].Journal of Bridge Engineering,2003,8(3):162-172.
[4]
M(O)LLER B,GRAF W,BEER M.Safety Assessment of Structures in View of Fuzzy Randomness[J].Computers & Structures,2003,81(15):1567-1582.
[5]
ZHAO Zhiye,CHEN Chuanyu.A Fuzzy System for Concrete Bridge Diagnosis[J].Computers & Structures,2002,80(8):629-641.
[6]
蒋友宝,刘扬,张建仁.钢筋混凝土拱基于模态频率的承载能力评估[J].公路交通科技,2009,26(8):63-66.JIANG Youbao,LIU Yang,ZHANG Jianren.Evaluation of Load Bearing Capacity of Reinforced Concrete Arch Based on Modal Frequency[J].Journal of Highway and Transportation Research and Development,2009,26(8):63-66.
[7]
钟惠萍.既有钢筋混凝土桥梁构件耐久性试验与可靠性评估研究[D].长沙:长沙理工大学,2004.ZHONG Huiping.Research of Durability Experiment and Reliability Evaluation for Existing Reinforced Concrete Bridge Members[D].Changsha:Changsha University of Science and Technology,2004.
[8]
ZHANG Jianren,LI Chuanxi,XU Feihong,et al.Test and Analysis for Ultimate Load-carrying Capacity of Existing Reinforced Concrete Arch Ribs[J].Journal of Bridge Engineering,ACSE,2007,12(1):4-12.
[9]
奉龙成,罗小华.钢筋混凝土拱桥面内极限承载能力的非线性分析[J].土木工程学报,2002,35(3):20-24.FENG Longcheng,LUO Xiaohua.Nonlinear Analysis for Ultimate Bearing Capacity of Arch Bridges[J].China Journal of Civil Engineering,2002,35(3):20-24.
[10]
叶见曙,张峰.预应力混凝土连续箱梁开裂后的刚度退化模型[J].中国公路学报,2007,20(6):67-72.YE Jianshu,ZHANG Feng.Stiffness Degeneration Model of Prestressed Concrete Continuous Box Girder after Cracking[J].China Journal of Highway and Transport,2007,20(6):67-72.