COOK W D.Goal Programming and Financial Planning Models for Highway Rehabilitation
[12]
[J].Journal of Operational Research Society,1984,35 (3):217 -223.
[13]
CHUA K H,MONISMITH C L,CXANDALL K C.Dynamic Decision Model for Pavement Management using Mechanistic Pavement Performance Submodel
[14]
[J].Transportation Research Record 1993,1397:15-24.
[15]
李志刚,洪锋.动态规划原理在高速公路网级养护决策中的应用
[16]
[J].解放军理工大学学报:自然科学版,2002.3(1):60-62.LI Zhigang,HONG Feng.Application of Theory of Dynamic Programming for Maintenance Decision-making of Freeways Network
[17]
[J].Journal of PLA University of Science and Technology:Natural Science Edition,2002,3(1):60-62.
[18]
刘伯莹,姚祖康.网级路面管理系统优化方法的研究
[19]
[J].中国公路学报,1994,7(3):1-9.LIU Boying,YAO Zukang.Study on Optimization Methodology of Network Level Pavement Management System
[20]
[J].China Journal of Highway and Transport,1994,7 (3):1-9.
[21]
FWA T F,CHAN W T,HOQUE K Z.Multiobjective Optimization for Pavement Maintenance Programming
[22]
[J].Journal of Transportation Engineering,2000,126(5):367-374.
[23]
韩世莲,刘新旺,黄卫.基于模糊推理的公路养护资金多目标分配问题求解
[24]
[J].公路交通科技,2001,18(5):25-28.HAN Shilian.LIU Xinwang.HUANG Wei.A Fuzzy Inference Based Approach for Fund Allocation of Expressway Maintenance Management
[25]
[J].Journal of Highway and Transportation Research and Development,2001,18 (5):25-28.
[26]
张永波,陆化普,熊辉,等.公路资产养护管理优化研究
[27]
[J].中南公路工程,2006,31(5):124-127.ZHANG Yongbo,LU Huapu,XIONG Hui,et al.The Research of Asset Maintenance Management Optimization
[28]
[J].Central South Highway Engineering,2006,31(5):124-127.
[29]
雷英杰.MATLAB遗传算法工具箱及应用
[30]
[M].西安,西安电子科技大学出版社,2005.LEI Yingjie.MATLAB Genetic Algorithm Toolbox and Application
[31]
[M].Xi'an:Xidian University Press,2005.
[32]
朱荣军.高速公路养护管理系统研究和开发-经济效益分析与资金优化分配
[33]
[D].南京:东南大学,2000.ZHU Rongjun.Research and Development of Expressway Maintenance Management System:Economic Benefit Analysis and Optimal Allocation of Funds
[34]
[D].Nanjing:Southeast University,2000.
[35]
张睿.工程项目的风险分析技术与应对方案评价研究
[36]
[D].南京:河海大学,2005.ZHANG Rui.Research on Methods of Risk Analysis and Assessment for Response Options within Project