[S].北京:人民交通出版社,2004.P.R.China.Ministry of Communications.JTG D60 -2004 General Code for Design of Highway Bridges of Culverts
[3]
[S].Beijing:China Communications Press,2004.
[4]
中华人民共和国交通部.JTG D62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范
[5]
[S].北京:人民交通出版社,2004.P.R.China.Ministry of Communications.JTG D62-2004 Code for Design of Highway Reinfored Concrete and Prestressed Concrete Bridges of Culverts
[6]
[S],Beijing:China Communications Press,2004.
[7]
中华人民共和国交通部.JTJ 022-85公路钢筋混凝土及预应力混凝土桥涵设计规范
[8]
[S].北京:人民交通出版社,1985.P.R.China.Ministry of Communications.JTG D62 -2004 Code for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges of Culverts
[9]
[S].Beijing:China Communications Press,1985.
[10]
中华人民共和国交通部.JTG/T D65-01-2007公路斜拉桥设计细则
[11]
[S].北京:人民交通出版社,2007.P.R.China.Ministry of Communications.JTG/T D65-01 -2007 Guidelines for Design of Highway Cable-stayed Bridge
[12]
[S].Beijing:China Communications Press,2007.
[13]
官万轶,韩大建.斜拉桥的索力调整
[14]
[J].昆明理工大学学报,2000,25(1):125-128.GUAN Wanyi,HAN Dajian.Adjustment of Cable Force for Cable-stayed Bridges
[15]
[J].Journal of Kunming University of Science and Technology,2000,25 (1):125-128.
[16]
吕建鸣、宋建永.组合截面桥梁结构计算方法研究
[17]
[J].公路交通科技,2005,22(6):68-71.Lu Jianming,SONG Jianyong.Study on Analysis Method for Co-section Bridge Structure
[18]
[J].Journal of Highway and Transportation Research and Development,2005,22(6):68 -71.
[19]
陈可,吕建鸣.桥梁结构检测分析系统研究
[20]
[J].公路交通科技,2005,22(5):87-92.CHEN Ke,LU Jianming.Bridge Test Analysis System Study
[21]
[J].Journal of Highway and Transportation Research and Development,2005,22 (5):87-92.
[22]
吕建鸣,陈云海.预应力混凝土桥梁徐变计算方法的研究
[23]
[J].公路交通科技,2005,22(7):58-63.LU Jianming,CHEN Yunhai.Study of Analysis Method for PC Bridge Creep
[24]
[J].Journal of Highway and Transportation Research and Development,2005,22(7):58 -63.
[25]
李宏江,李万恒,张劲泉,等.既有PC斜拉桥合龙段拆除的施工控制
[26]
[J].公路交通科技,2008,25(8):61-66.LI Hongjiang,LI Wangheng,ZHANG Jinquan,et al.Construction Control for Removal of the Closure Segment in an Existing Prestressed Concrete Cable-stayed Bridge
[27]
[J].Journal of Highway and Transportation Research and Development,2008,25 (8):61-66.
[28]
王标,王艳,常全军.大跨径PC斜拉桥施工监控分析
[29]
[J].交通科技与经济,2010(1):76-79.WANG Biao,WANG Yan,CHANG Quan-jun.Construction Control of Long-span PC Cable-stayed Bridge
[30]
[J].Technology & Economy in Areas of Communications,2010 (1):76-79.
[31]
汪劲丰,施笃铮,徐兴.确定斜拉桥最优恒载索力方法的探索
[32]
[J].浙江大学学报:工学版,2002,36(2):40-43.WANG Jinfeng,SHI Duzheng,XU Xing.Exploration of the Optimal Cable Tension of Cable-stayed Bridge under Permanent Loads
[33]
[J].Journal of Zhejiang University:Engineering Science Edition,2002,36 (2):40-43.
[34]
张开银,张军辉,梁新宇,等.某斜拉桥的病害成因及加固研究
[35]
[J].交通科技,2008(4):25-28.ZHANG Kaiyin,ZHANG Junhui,LIANG Xinyu,et al.The Cable-stayed Bridge Disease Test and Cause Analyses and Reinforcement Research