全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

公路网络可达性研究

, PP. 104-107

Keywords: 公路网,可达性,模型,重要度

Full-Text   Cite this paper   Add to My Lib

Abstract:

可达性是公路网规划方案的重要评价指标之一。由于研究目的、研究范围等不同,国内外在可达性的定义及模型形式等方面存在一定的差异。文章以公路网络的可达性为研究对象,首先剖析了结点的交通需求、结点层次以及驾驶员路径选择行为对可达性的影响,进而对现有可达性模型进行改进,建立了综合考虑结点的交通需求、结点层次以及驾驶员路径选择行为这三个因素,以结点间最短路线长度和最短出行时间以及结点重要度为变量的公路网络可达性模型。

References

[1]  PHILLIP S DUNSTON.Analysing Infrastructure and Mobility in the Baltic Sea Region
[2]  [C].Washington D.C.:TRB 78th Annual Meeting Preprint CD-ROM,TRB,National Research Council,1999.
[3]  JAMES P HALL.Mobility & Accessibility:the yin & yang of planning
[4]  [J].World Transport Policy & Practice,2000,6(2):25-38.
[5]  [C].Washington D.C.:TRB 78th Annual Meeting Preprint CD-ROM,TRB,National Research Council,1999.
[6]  ROBERT E STAMMER,Jr.Gender and individual access to urban opportunities:a study using space-time measures
[7]  [C].Washington D.C.:TRB 78th Annual Meeting Preprint CD-ROM,TRB,National Research Council,1999.
[8]  MALCOLM E BAIRD.A Multicriteria Index to Estimate Accessibility
[9]  [C].Washington D.C.:TRB 77th Annual Meeting Preprint CD-ROM,TRB,National Research Council,1998.
[10]  J CHRISTOPHER KOPP,MARK E PITSTICK.Evaluating Multimodal Access to Transit
[11]  [D].南京:东南大学,2002.
[12]  李旭宏,林小稚,陆建.公路建设项目技术评价方法探讨
[13]  [J].系统工程理论与实践,1997(10):34-38.
[14]  朱顺应.公路网规划建设评价及关键技术研究
[15]  [D].南京:东南大学,1999.
[16]  杨绍峰.县乡公路网布局质量评价研究
[17]  过秀成,胡斌,陈凤军.农村公路网规划布局设计方法探讨
[18]  [C].Washington D.C.:TRB 78th Annual Meeting Preprint CD-ROM,TRB,National Research Council,1999.
[19]  BONNIE M SAVAGE,FRED L MANNERING.Measuring Post-Disaster Transportation System Performance:The 1995 Kobe Earthquake in Comparative Perspective
[20]  SEAN T DOHERTY.Accessibility Indices:A Connection to Residential Land Prices & Location Choices
[21]  [C].Washington D.C.:TRB 77th Annual Meeting Preprint CD-ROM,TRB,National Research Council,1998.
[22]  ARUN R KUPPAM.Bringing Time Back In:A Study on the Influence of Travel Time Variations and Facility Opening Hours on Individual Accessibility
[23]  [C].Washington D.C.:TRB 77th Annual Meeting Preprint CD-ROM,TRB,National Research Council,1998.
[24]  胡文友.公路运输通道项目建设决策与管理方法研究
[25]  [J].中国公路学报,1997,10(4):90-95.
[26]  [J].公路交通科技,2002,19(2):91-94.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133