OALib Journal期刊
ISSN: 2333-9721
费用:99美元
|
|
|
基于条件状态和基于可靠度的桥梁维修方法的比较研究
Keywords: 桥梁维修,条件状态,可靠度,贴现成本
Abstract:
通过探讨基于条件状态的桥梁维修优化方法,并将其与基于可靠度的桥梁维修优化方法进行比较,澄清了有关桥梁养护管理方面的一些容易混淆的概念,阐述了这两种方法的特点、优势和劣势,指出应该着力推动更适合中国桥梁养护现状的基于条件状态的维修优化方法的应用,与此同时还应关注和了解代表未来发展方向的基于可靠度的维修优化方法的最新研究与应用,并在需要时选择运用之。
References
[1] | VAN NOORTWIJK J M,KLATTER H E.The use of lifetime distributions in bridge maintenance and replacement modelling
|
[2] | [J].Computers & Structures,2004,82(13-14):1 091-1 099.
|
[3] | FRANGOPOL D M,MAUTE K.Special Issue:Advances in probabilistic mechanics and structural reliability
|
[4] | [J].Computers and Structures,2004,82(13-14):969-970.
|
[5] | RIJKSWATERSTAAT B V.Workshop on optimal maintenance of structures
|
[6] | [C]//DUNASZEGI L.Proc 5th Int Conf on developments in short and medium span bridge engineering98.1998:1 101-1 113.
|
[7] | KOSKISTO O.Reliability-based optimization of plant precast concrete building systems
|
[8] | [J].Reliability Engineering and System Safety,2003,80(2):185-195.
|
[9] | FRANGOPOL D M,KONG J S,GHARAIBEH E S.Reliability-based life-cycle management of highway bridges
|
[10] | [J].Journal of Computing in Civil Engineering,2001,15(1):27-34.
|
[11] | LIU MIN,FRANGOPOL D M.Optimal bridge maintenance planning based on probabilistic performance prediction
|
[12] | [J].Engineering Structures,2004,26(7):991-1 002.
|
[13] | [Z].The Netherlands.Utrecht:Ministry of Transport,Public Works and Water Management,Civil Engineering Division,2000.
|
[14] | MCKENZIE A.Economic analysis and special studies
|
[15] | [DB/OL].Mn/DOT Office of Investment Management.2001.(http://www.oim.dot.state.mn.us/EASS/).
|
[16] | TILLY G P.Principles of whole life costing
|
[17] | [C]//DAS P C.Safety of Bridges.London:Thomas Telford,1997:138-144.
|
[18] | TROIVE S,SUNDQUIST H.Optimisation of design parameters for lowest life-cycle cost of concrete bridges
|
[19] | [R].Acta Polytechnica Scandinavica civil engineering and building construction series no.108.Espoo (Finland):The Finnish Academy of Technology,1997.
|
[20] | VAN NOORTWIJK J M.Explicit formulas for the variance of discounted life-cycle cost
|
Full-Text
|
|
Contact Us
service@oalib.com QQ:3279437679 
WhatsApp +8615387084133
|
|