OALib Journal期刊
ISSN: 2333-9721
费用:99美元
|
|
|
曲线斜拉桥锚固点与支座偏移设计的分块法
, PP. 47-52
Keywords: 桥梁工程,曲线斜拉桥,分块法,有限元,主梁锚固点偏移,支座偏移
Abstract:
以结构部分与整体力学关系为基础,采用"分块法"计算曲线斜拉桥主梁锚固点和主墩支座偏移值,以使内外侧索力及主梁横梁内外侧负弯矩相等。将曲线主梁划分成若干矩形截面曲线梁,通过分块梁与整体梁段的力学关系来建立平衡方程,应用该方法推导了曲线斜拉桥主梁锚固点和主墩支座偏移值的计算公式。用有限元方法分析了2种偏移对龟韭沟大桥受力的影响,并绘制了偏移值对大桥受力的影响曲线,将曲线反应出的合理偏移值与公式计算结果进行了比较。结果表明偏移主梁锚固点和主墩支座能较好地改善曲线斜拉桥受力,且公式计算结果与有限元分析结果吻合良好。
References
[1] | REISAJ, PEREIRA A, PEDROJO.不对称和弯斜拉桥
|
[2] | [J].楼庄鸿, 译.预应力技术, 2004 (2):30 -34. REISA J, PEREIRA A, PEDRO JO.Asymmetry andCurved Cable-stayed Bridge
|
[3] | [J]. Lou Zhuanghong,translated.PrestressTechnology, 2004 (2): 30 -34.
|
[4] | 余淑琴, 吴伟.石嘴山市龟韭沟大桥总体设计
|
[5] | [J].交通科技, 2008 (5):12 -14.YU Shuqing, WU Wei. Design of Guijiugou-bridge in Shizuishan City
|
[6] | [J]. Transportation Science &Technology, 2008 (5): 12 -14.
|
[7] | LIM CW, WANGCM, KITIPORNCHAIS.Timoshenko Curved Beam Bending Solutions in Terms of Eulerbernoulli Solutions
|
[8] | [J].Archive of Applied Mechanics,1997, 67: 179 -190.
|
[9] | GAOY, WANGM Z, ZHAOBS.The Refined Theory of Rectangular Curved Beams
|
[10] | [J].Acta Mechanica, 2007,189:141 -150.
|
[11] | ZHANG HL, HUANG DZ, WANG TL.Lateral Load Distribution in Curved SteelI-girder Bridges
|
[12] | [J].Journal of Bridge Engineering, 2005, 10 (3):281 -290.
|
[13] | ZHU LL, ZHAO Y H.Exact Solution for Warping of Spatial Curved Beams in Natural Coordinates
|
[14] | [J].Applied Mathematics and Mechanics, 2008, 29 (7):933-941.
|
[15] | KAPANIARK, LIJ.A Formulationand Implementation of Geometrically Exact Curved Beam Elements Incorporating Finite Strains and Finite Rotations
|
[16] | [J].Computational Mechanics, 2003, 30:444 -459.
|
[17] | OKEILAM., EL-TAWILS.Warping Stresses in Curved Box Girder Bridges:Case Study
|
[18] | [J].Journal of Bridge Engineering, 2004, 9 (5):487 -496.
|
[19] | LEE T Y, KIM Y H, KANG S W. Optimization of Tensioning Strategy for Asymmetric Cable-stayed Bridgeand Its Effecton Construction Process
|
[20] | [J].Structural and Sultidisciplinary Optimization, 2008, 35:623 -629.
|
[21] | 陈从春.矮塔斜拉桥设计理论核心问题研究
|
[22] | [D].上海:同济大学, 2006.CHEN Congchun. Studyon Major Problems for Design Theory of Extradosed Cable-stayed Bridges
|
[23] | [D].Shanghai:Tongji University, 2006.
|
[24] | 郑一峰, 黄侨, 张连振.部分斜拉桥结构参数分析
|
[25] | [J].公路交通科技, 2006, 23 (6):60 -65.ZHENG Yifeng, HUANG Qiao, ZHANG Lianzheng.Parameter Analysis for Partially Cable Stayed Bridges
|
[26] | [J].Journal of Highway and Transportation Research and Development, 2006, 23 (6): 60 -65.
|
[27] | 李正仁, 刘祖国.曲线斜拉桥的应用与展望
|
[28] | [J].钢结构, 2003, 18 (6):43 -45.LI Zhengren, LIU Zhuguo. Application and Prospect of Curved Cable-stayed Bridge
|
[29] | [J]. Steel Construction,2003, 18 (6): 43 -45.
|
[30] | 肖海珠, 张强, 高宗余.北京地铁五号线曲线斜拉桥设计
|
[31] | [J].桥梁建设, 2006 (4):38 -41.XIAO Haizhu, ZHANG Qiang, GAO Zhongyu.Design ofCurved Cable-stayed Bridgeon Beijing Subway Line 5
|
[32] | [J].Bridge Construction, 2006 (4):38 -41.
|
[33] | 吕福钢.斜交曲线斜拉桥力学性能研究
|
[34] | [D].大连:大连理工大学, 2005.LVFugang.Stress Properties of Skew Intersection Curved Cable-stayed Bridge
|
[35] | [D].Dalian:Dalian University ofTechnology, 2005.
|
[36] | ASTANEH-ASLA, BLACK RG.Seismic and Structural Engineering ofa Curved Cable-stayed Bridge
|
[37] | [J].Journalof Bridge Engineering, 2001, 6 (6):439 -450.
|
Full-Text
|
|
Contact Us
service@oalib.com QQ:3279437679 
WhatsApp +8615387084133
|
|