李兴苏,孙洪波,霍晓春.工程建设项目承发包模式的优选决策[J].重庆交通大学学报:自然科学版,2008,27(5):799-802.LI Xing-su,SUN Hong-bo,HUO Xiao-chun. Research on Selecting an Appropriate Project Delivery System[J].Journal of Chongqing Jiaotong University:Natural Science Edition,2008,27(5):799-802.
[2]
王广斌,张文娟,靳岩.建设项目承发包模式实际案例分析[J].同济大学学报:自然科学版,2002,30 (1):120-123.WANG Guang-bin,ZHANG Wen-juan,JIN Yan. Case Analysis of Project Procurement Model Choice[J]. Journal of Tongji University:Natural Science Edition,2002,30(1):120-123.
[3]
王能,毛鹏,徐星.大型工程项目承发包模式创新研究[J].建筑管理现代化,2008 (4):27-29.WANG Neng,MAO Peng,XU Xing. IInnovation Research on Procurement Model of Large-scale Projects[J]. Construction Management Modernization,2008 (4):27-29.
[4]
WATT D J,KAYIS B,WILLEY K. Identifying Key Factors in the Evaluation of Tenders for Projects and Services[J]. International Journal of Project Management,2009,27(3):250-260.
[5]
WATT D J,KAYIS B,WILLEY K. The Relative Importance of Tender Evaluation and Contractor Selection Criteria[J]. International Journal of Project Management,2010,28(1):51-60.
[6]
张崇宏,张洪涛.境外工程项目管理实践[J].水运工程,2010 (8):19-23.ZHANG Chong-hong,ZHANG Hong-tao. Practice of Management for Overseas Project[J]. Port & Waterway Engineering,2010 (8):19-23.
[7]
齐二石,姜琳.大型工程项目的复杂性及其集成化管理[J].科技管理研究,2008,28(8):191-193.QI Er-shi,JIANG Lin. The Complexity and Integrated Management of Large Engineering Projects [J].Science and Technology Management Research, 2008,28(8):191-193.
[8]
张吉军.模糊层次分析法[J].模糊系统与数学,2000,14(2):80-87.ZHANG Ji-jun. Fuzzy Analytical Hierarchy Process[J]. Fuzzy Systems and Mathematics,2000,14(2):80-87.
[9]
李吉鹏,马丽,陆志强.运用模糊层次分析法优选纸浆造纸废水深度处理方案[J].环境工程学报,2012,6(11):4089-4096. LI Ji-peng,MA Li,LU Zhi-qiang. Selection of Advanced Wastewater Treatment Process for Pulp and Paper Industry Based on the Fuzzy Analytical Hierarchy Process Methods[J]. Chinese Journal of Environmental Engineering,2012,6(11):4089-4096.
[10]
吕跃进.基于模糊一致矩阵的模糊层次分析法的排序[J].模糊系统与数学,2002,16(2):79-85.Lü Yue-jin. Weight Calculation Method of Fuzzy Analytical Hierarchy Process[J].Fuzzy Systems and Mathematics,2002,16(2):79-85.
[11]
孙璐,周正兵,金娇萍,等.基于模糊熵和AHP的山区公路交通气象安全评价[J].公路交通科技,2011,28(12):138-144.SUN Lu,ZHOU Zheng-bing,JIN Jiao-ping,et al. Assessment of Weather Condition for Traffic Safety of Mountain Highway Based on Fuzzy Entropy and Analytic Hierarchy Process[J]. Journal of Highway and Transportation Research and Development,2011,28(12):138-144.
[12]
张劲文,朱永灵,高星林,等.港珠澳大桥岛隧工程设计施工总承包模式构建[J].公路,2012(1):133-135.ZHANG Jin-wen,ZHU Yong-ling,GAO Xing-lin,et al. Design-Build Contracting Model Development for Islands and Tunnel Engineering of Hong Kong-Zhuhai-Macao Bridge Project[J].Highway,2012(1):133-135.