ZHANG Qing-hua,LI Qiao,BU Yi-zhi. Load Transmission Mechanism of PBL Shear Connector Group (I):Theoretical Model [J]. China Civil Engineering Journal,2011,44(4):71-77.
SHI Xiao-shuang,WANG Qing-yuan,OUYANG Wen-xin,et al. Push-out Experimental Study on Bond-slip Behaviors of PBL Shear Connector under Static Loading [J]. Engineering Mechanics,2012,29(1):168-175.
ZHENG Shan-suo,YANG Yong,YU Mao-hong. Application Prospect of Composite Bridge in the Full Development of Western China [J]. Industrial Construction,2002,32(10):56-59.
LIU Ming-hu,XU Guo-ping,LIU Feng.Study and Design of Steel-concrete Joint Part of Hybrid Girder of Edong Bridge[J]. Journal of Highway and Transportation Research and Development,2010,27(12):78-85.
ZHANG Hong,LU Yong. Research on the Key Technology for the Hybrid Girder Cable-stayed Bridge Joint [J]. Journal of Wuhan University of Technology,2010,32(15):51-55.
XIAO Lin,WEI Xing,QIANG Shi-zhong. Comparative Study on Two Kinds of Push-out Tests of PBL Shear Connectors[J]. China Civil Engineering Journal,2013,46(11):70-80.
LIU Gao,TANG Liang,TAN Hao,et al. Determination of Rational Steel-concrete Connection Position for Hybrid Girder Cable-stayed Bridge[J]. Journal of Highway and Transportation Research and Development,2010,27(6):52-57.
[15]
金安红. 南京三桥钢塔钢混结合段的设计与制造[J]. 钢结构,2007,22(2):75-77.
[16]
JIN An-hong. Design and Fabrication of the Steel-concrete Section of Steel Towers for No.3 Nanjing Yangtze River Bridge [J] Steel Construction,2007,22(2):75-77.
LI Xiao-zhen,XIAO Lin,ZHANG Xun,et al. Experimental Research on Bearing Capacity of PBL Shear Connectors of Steel-concrete Joint in Cable-stayed Bridge [J]. Steel Construction,2009,24(9):22-27.
ZHANG Qing-hua,LI Qiao,TANG Liang. Research on 3D FEM Nonlinear Simulation Method for Shear Connectors[J]. Journal of Southwest Jiaotong University,2005,40(5):595-599.
HU Jian-hua,PU Huai-ren. Design and Test of the Joint Part of Steel-concrete Girder Bridge with PBL Shear Connector [J]. Steel Construction,2007,22(2):62-68.
HU Jian-hua,YE Mei-xin,HUANG Qiong. Experiment on Bearing Capacity of PBL Shear Connectors[J]. China Journal of Highway and Transport,2006,19(6):65-72.
XIAO Lin,LI Xiao-zhen,WEI Xing. Research on the Static Load Mechanical Properties of PBL Shear Connectors' Push-out Test[J]. China Railway Science,2010,31(3):15-21.
WANG Zhen-hai,LI Qiao,ZHAO Can-hui. Experimental Research on Failure Mode of Perfobond Rib Shear Connectors[J]. Journal of Highway and Transportation Research and Development,2012,29(8):64-70.
HU Jian-hua,HOU Wen-qi,YE Mei-xin. Study of Influence Factors and Formula for the Bearing Capacity of PBL Shear Connectors [J]. Journal of Railway Science and Engineering,2007,4(6):12-18.
[31]
邓青儿. 大跨度连续组合箱梁桥连接件设计方法研究[D].上海:同济大学,2007.
[32]
DENG Qing-er. Study on Design Method of Connections of Large-span Continuous Composite Box Girder Bridges [D]. Shanghai:Tongji University,2007.