Jean-Marie Cremer,Clement Counasse,Jean-Yves Delforno.The Sart Canal-Bridge,Houdeng-Aimeries [J].Begium:Structural Engineering International,2003,13 (1):19-22.
[4]
Michel Virloguex.New trends in prestressed concrete bridges [J].Structural Concrete,2002,3 (2):67-97.
[5]
中交公路规划设计院.滨州黄河公路大桥施工图设计[R].北京:2001.
[6]
王伯惠.斜拉桥结构发展和中国经验[M].北京:人民交通出版社,2003,1-30.
[7]
Wang Feifeng.Research on Segmental Model of Girder for Binzhou Yellow River Bridge [A].International Federation for Structural Concrete Proceeding,fib Symposium 2004 on Segmental Construction in Concrete [C].New Delhi:2004.
[8]
Miguel A Astiz,Javier Manterorola.Aqueduct,Imperial Canal of Aragon [J].Zaragoza,Spain:Structural Engineering International,2003,13 (3):167-168.
[9]
Tim Gosbell.Strengthening of the West Gate Bridge Approach Span,Melbourne [J].Structural Engineering International,2002,12 (1):14-16.
[10]
J Strasky.The power of prestressing [J].Structural Concrete,2003,4(1):25-43.