黄文雄.基于新型弯起器的折线配筋先张梁力学性能 研究[D].武汉:华中科技大学,2012. HUANG Wenxiong.Research on Mechanical Properties of Polyline Pretensioned Beams with New Bend Component [D].Wuhan:Huazhong University of Science and Technology,2012.
[2]
于秋波.HRB500 级钢筋部分预应力混凝土梁受力性 能研究[D].郑州:郑州大学,2008. YU Qiubo.Study on Stress Behavior of Partially Prestressed Concrete Beams with HRB500 Steel Bars [D].Zhengzhou:Zhengzhou University,2008.
[3]
柳学发,陈良江.折线配筋先张梁的设计[J].铁道 标准设计,2004(3):1-5. LIU Xuefa,CHEN Liangjiang.Design of Pre-tensioned Girder with Arrangement of Reinforcements in Broken Line [J].Railway Standard Design,2004(3):1-5.
[4]
黄文雄,谭利英.结构与材料参数变化对折线配筋先 张梁局部应力的影响[J].公路交通科技,2012,29 (1):75-79. HUANG Wenxiong,TAN Liying.Impact of Structural Parameters and Material Parameters on Local Stress Distribution in Polyline Pretensioned Beam [J].Journal of Highway and Transportation Research and Development, 2012,29(1):75-79.
[5]
黄文雄,谭利英.折线配筋先张梁中弯起器的模拟及 其对局部应力的影响分析[J].中外公路,2012,32 (5):132-135. HUANG Wenxiong,TAN Liying.Study on the Bend Component Simulation Method and Its Effects on the Local Stress Distribution in the Polyline Pretensioned Beams [J].Journal of China & Foreign Highway,2012,32 (5):132-135.
[6]
敖猫,郑剑之,黄文雄,等.折线配筋先张梁局部应力 分析[J].华东公路,2012(2):3-5. AO Mao,ZHENG Jianzhi,HUANG Wenxiong,et al. Analysis on Local Stress of Polyline Pretensioned Beams [J].East China Highway,2012(2):3-5.
[7]
陈汉昌,刘立新,宋明慧,等.折线先张梁中钢绞线力 学性能的试验研究[J].建筑技术,2010,41(12): 1108-1111. CHEN Hanchang,LIU Lixin,SONG Minghui,et al.Test Research on Mechanical Property of Steel Strand in Foldline Pre-tension Concrete Beam
黄文雄,谭利英.折线配筋先张梁折点半径优化[J]. 公路,2012(10):54-56. HUANG Wenxiong,TAN Liying.Research on Corner Radius Optimization of Polyline Pretensioned Beams [J]. Highway,2012(10):54-56.
[10]
HUANG Wenxiong,TAN Liying,YANG Hongyin,et al. Discussion on Curve Prestressed Reinforcement Simulation in FEA [J].Applied Mechanics and Materials,2012 (178 /181):2179-2182.
[11]
HUANG Wenxiong,TAN Liying.Analysis of Local Stress and Improvement of Stress State on Key Parts of the Polyline Pretensioned Beam [C]∥2012 International Conference on Electric Technology and Civil Engineering (ICETCE 2012).Wuhan,China:IEEE,2012.
[12]
GB/T 5224—2003,预应力混凝土用钢绞线[S]. GB/T 5224—2003,Steel Stand for Prestressed Concrete [S].
[13]
GB/T 228—2002,金属材料室温拉伸试验方法[S]. GB/T 228—2002,Metallic Materials-Tensile Testing at Ambient Temperature [S].
[14]
JTG D62—2004,公路钢筋混凝土及预应力混凝土桥涵 设计规范[S]. JTG D62—2004,Code for Design of Highway Reinforce Concrete and Prestressed Concrete Bridges and Culverts [S]. 76