LUNARDI P.隧道设计与施工:岩土控制变形分析法 (ADECO-RS)[M].北京:中国铁道出版社,2011. LUNARDI P.Design and Construction of Tunnel:ADECO- RS [M].Beijing:China Railway Press,2011.
[2]
安永林,史胜利,彭立敏,等.隧道浅埋软弱围岩段 双下侧导坑施工性态[J].公路交通科技,2009,26 (1):114-119. AN Yonglin,SHI Shengli,PENG Limin,et al. Construction Behavior of Double Down-side Drifts in a Weak Tunnel with Shallow Cover [J].Journal of Highway and Transportation Research and Development,2009,26 (1):114-119.
[3]
刘辉,李波,彭川,等.岩溶隧道掘进时地下附属结 构的监测分析[J].公路交通科技,2010,27(4): 105-109. LIU Hui,LI Bo,PENG Chuan,et al.Analysis of Monitoring Underground Accessory Structure during Tunnel Excavation in Karst Area [J].Journal of Highway and Transportation Research and Development,2010,27 (4):105-109.
[4]
岳键,冷伍明,赵春彦.水下浅埋公路隧道施作仰拱 力学效应的现场试验研究[J].公路交通科技,2011, 28(6):113-121. YUE Jian,LENG Wuming,ZHAO Chunyan.Field Experimental Study on Mechanical Effect of Invert Construction for Shallow Embedded Underwater Highway Tunnel [J].Journal of Highway and Transportation Research and Development,2011,28(6):113-121.
[5]
佘健,何川.软弱围岩段隧道施工过程中围岩位移的 三维弹塑性数值模拟[J].岩石力学与工程学报, 2006,25(3):623-629. SHE Jian,HE Chuan.3D Elastoplastic Numerical Simulation of Surrounding Rock Displacement in Soft Surrounding Rock Section during Construction Process
[6]
[J ].Chinese Journal of Rock Mechanics and Engineering,2006,25(3):623-629.
[7]
程桦,孙钧.软弱围岩复合式隧道衬砌力学机理非线 性大变形数值分析[J].岩石力学与工程学报, 1997,16(4):34-43. CHENG Hua,SUN Jun.Numerical Analysis of Large Nonlinear Deformation Mechanism for Complex Tunnel Lining in Incompetent Country Rock [J].Chinese Journal of Rock Mechanics and Engineering,1997,16(4): 34-43.
[8]
姚显春,李宁,陈蕴生.隧洞中全长黏结式锚杆的受 力分析[J].岩石力学与工程学报,2005,24(13): 2272-2276. YAO Xianchun,LI Ning,CHEN Yunsheng.Theoretical Solution for Shear Stresses on Interface of Fully Grouted Bolt in Tunnels [J].Chinese Journal of Rock Mechanics and Engineering,2005,24(13):2272-2276.
[9]
肖广智,魏祥龙.意大利岩土控制变形(ADECO- RS)工法简介[J].现代隧道技术,2007,44(3): 11-15. XIAO Guangzhi,WEI Xianglong.Introduction to ADECORS Tunneling Method of Italy [J].Modern Tunnelling Technology,2007,44(3):11-15.
[10]
翟进营,杨会军,王莉莉.“新意法”在国外隧道工程 中的应用[J].隧道建设,2008,28(4):470-475. ZHAI Jinying,YANG Huijun,WANG Lili.Application of ADECO-RS Approach in Tunneling in Foreign Countries [J].Tunnel Construction,2008,28(4):470-475.
[11]
李斌,漆泰岳,旷文涛,等.新意法在浏阳河隧道参 数设计中的应用[J].现代隧道技术,2009,46 (4):83-88. LI Bin,QI Taiyue,KUANG Wentao,et al.Application of NITM in the Design of Liuyang River Tunnel [J].Modern Tunnelling Technology,2009,46(4):83-88.
[12]
周捷.大断面隧道超前预加固适应性研究[D].四川: 西南交通大学,2010. ZHOU Jie.Research on Pre-reinforcement Applicability of Tunnel with Large Cross-section
[13]
[D ].Sichuan: Southwest Jiaotong University,2010.
[14]
关宝树,赵勇.软弱围岩隧道施工技术[M].北京: 人民交通出版社,2011. GUAN Baoshu,ZHAO Yong.Constructing of Soft Surrounding Rock Tunnel