俞博.装配式混凝土空心板梁桥整体化加固的试验研 究[D].南京: 东南大学,2011.YU Bo.Experimental Study on Integrative Reinforcement of Precast Concrete Hollow Slab Girder Bridge[D].Nanjing: Southeast University,2011.
[2]
张婷.混凝土空心板铰缝病害及防治措施研究[D].南京: 东南大学,2011.ZHANG Ting.Study on Hinge Joint Diseases of Precast Concrete Hollow Slab and Preventive Measures[D].Nanjing: Southeast University,2011.
[3]
种永峰.空心板梁铰接缝模型试验研究[D]: 西安: 长安大学,2008.CHONG Yong-feng.Experimental Study on Hinge Joint Model of Hollow Slab Beam[D].Xi'an: Chang'an University,2008.
[4]
卫军,李沛,徐岳,等.空心板铰缝协同工作性能影响因素分析[J].中国公路学报,2011,24(2): 29-33.WEI Jun,LI Pei,XU Yue,et al.Influencing Factor Analysis on Coordinated Working Performance of Hinge Joint in Hollow Slab[J].China Journal of Highway and Transport,2011,24(2): 29-33.
[5]
俞博,叶见曙,张剑,等.装配式混凝土铰接板桥铰缝剪力计算[J].深圳大学学报: 理工版,2011,28 (1): 60-64.YU Bo,YE Jian-shu,ZHANG Jian,et al.Transverse Shear of Fabricated Concrete Articulated Plate Bridge[J].Journal of Shenzhen University: Science and Engineering, 2011,28(1): 60-64.
[6]
项贻强,邢骋,邵林海,等.铰接预应力混凝土空心板梁桥的空间受力行为及加固分析[J].东南大学学报: 自然科学版,2012,42(4): 734-738.XIANG Yi-qiang,XING Cheng,SHAO Lin-hai,et al.Spatial Behavior and Strengthening Analysis of Fabricated PC Hollow Slab Beam Bridge with Hinge Joints[J].Journal of Southeast University: Natural Science Edition, 2012,42(4): 734-738.
[7]
ANNAMALAI G,BROWN R C.Shear Strength of Posttensioned Grouted Keyed Connections[J].PCI Journal, 1990,35(3): 64-73.
[8]
范亮.先后浇混凝土界面抗剪性能研究[D].重庆: 重庆交通学院,2004.FAN Liang.Study on the Shear Behaviors of Pre-casting and Post-casting Concrete Interface[D].Chongqing: Chongqing Jiaotong University,2004.
[9]
中国建筑科学研究院.钢筋混凝土构件试验数据集[M].北京: 中国建筑科学研究院,1985.China Academy of Building Research.Test Data Material for Reinforced Concrete Members[M].Beijing: China Academy of Building Research,1985.
HUCKELBRIDGE A A Jr,EL-ESNAWI H,MOSES F.Shear Key Performance in Multi-beam Box Girder Bridges [J].Journal of Performance of Constructed Facilities, 1995,9(4): 271-285.
[12]
周旺华.现代混凝土叠合结构[M]: 北京: 中国建筑工业出版社,2001.ZHOU Wang-hua.Modern Composite Concrete Structure [M].Beijing: China Building Industry Press,2001.
[13]
ACI 318-08.Building Code Requirements for Structural Concrete[S].