金成棣. 预应力混凝土梁拱组合桥梁- 设计研究与实践 [M]. 北京: 人民交通出版社,2001.JIN Cheng-di. Design Research and Practice ofPrestressed Concrete Beam-arch Composite Bridges [M].Beijing: China Communications Press,2001.
姜军,蒲黔辉,勾红叶. 大跨度连续刚构拱组合桥梁拱墩结合块模型试验研究 [J]. 公路交通科技, 2011,27 (7): 69-75.JIANG Jun,PU Qian-hui,GOU Hong-ye. ExperimentalTest on Model of Beam,Arch and Pier Combination Areaof Long-span Continuous Rigid Frame Composite ArchBridge [J]. Journal of Highway and TransportationResearch and Development, 2011,27 (7): 69-75.
[10]
姜军,蒲黔辉,勾红叶. 连续刚构拱组合桥锚固区局部应力模型试验 [J]. 西南交通大学学报,2011,46(5): 726-731.JIANG Jun,PU Qian-hui,GOU Hong-ye. Model Test forLocal Stress Distribution in Anchorage Zones of ContinuousRigid Frame Composite Arch Bridge [J]. Journal ofSouthwest Jiaotong University,2011,46 (5): 726-731.
[11]
勾红叶,蒲黔辉,施洲. 大跨度 V 形刚构拱组合桥 V形墩梁节点模型试 验 研 究 [J]. 土 木 工 程 学 报,2010,43 (3): 100-106.GOU Hong-ye,PU Qian-hui,SHI Zhou. Model Test forthe V-shape Pier-girder Joint of Long-span V-shape RigidFrame Composite Arch Bridge [J]. China CivilEngineering Journal,2010,43 (3): 100-106.
[12]
陈从春. 矮塔斜拉桥设计理论核心问题研究 [D]. 上海: 同济大学,2005CHEN Cong-chun. Study on Major Problems for DesignTheory of Extradosed Cable-stayed Bridges [D].Shanghai: Tongji University,2005.
[13]
刘振宇. 大跨度梁拱组合桥梁结构优化分析 [D]. 武汉: 华中科技大学,2006.LIU Zhen-yu. Optimizing Analysis of Long-span Beam-arch Combination Bridges [D]. Wuhan: HuazhongUniversity of Science and Technology,2006.
[14]
TB10002. 1—2005,铁路桥涵设计基本规范 [S].TB10002. 1—2005, Fundamental Code for Design onRailway Bridge and Culvert[S].
[15]
易云焜. 梁拱组合体系设计理论关键问题研究 [D].上海: 同济大学,2007.YI Yun-kun. Key-problem Study for Design Theory ofBeam-arch Association System [D]. Shanghai: TongjiUniversity,2007.
[16]
勾红叶. 大跨度预应力混凝土 V 形刚构拱组合桥受力行为研究 [D]. 成都: 西南交通大学,2010.GOU Hong-ye. Study on Mechanical Behaviors of Long-span Prestressed Concrete V-shaped Rigid FrameComposite Arch Bridge [D]. Chengdu: SouthwestJiaotong University,2010.