张征文,赵建峰. 在役预应力混凝土梁式桥结构安全运营监测技术研究报告,2013-54 [R]. 杭州: 浙江交通职业技术学院, 2013.ZHANG Zheng-wen,ZHAO Jian-feng. Research Report ofStructural Health Monitoring Technology of in-servicePrestressed Concrete Girder Bridges,2013- 54 [R].Hangzhou: Zhejiang Institute of Communications, 2013.
[2]
FU Gong-kang, YOU Ji. Trucks Loads and BridgeCapacity Evaluation in China [J]. Journal of BridgeEngineering, 2009, 14 (5): 327-335.
[3]
FU Gong-kang, YOU Ji. Extrapolation for FutureMaximum Load Statistics [J]. Journal of BridgeEngineering, 2011, 16 (4): 527-535.
[4]
OBRIEN E J,ENRIGHT B. Using Weigh-in-Motion Datato Determine Aggressiveness of Traffic for Bridge Loading[J]. Journal of Bridge Engineering,2013,18 (3):232-239.
[5]
MIAO T J,CHAN T H T. Bridge Live Load Models fromWIM Data [J]. Engineering Structures,2002,24 (8):1071-1084.
[6]
杨琪,黄建跃,阮欣,等. 基于 WIM 数据的桥梁实际汽车荷载效应的研究 [J]. 公路工程,2010,35(4): 15-18.YANG Qi,HUANG Jian-yue,RUAN Xin,et al. Study ofthe Actual Vehicle Load Effect of Bridges Base on WIMData [J]Highway Engineering, 2010, 35 ( 4 ):15-18.
[7]
韩万水,李彦伟,乔磊,等. 基于车- 桥耦合振动理论的移动荷载识别 [J]. 中国公路学报,2013,26(1): 74-86.HAN Wan-shui,LI Yan-wei,QIAO Lei,et al. MovingLoad Identification Based on Vehicle-bridge CouplingVibration Theory [J]. China Journal of Highway andTransport, 2013, 26 (1): 74-86.
[8]
项乔君,王炜,李伟. 汽车最小行车时距计算模型的研究 [J]. 东南大学学报, 1998,28 (3): 79-82.XIANG Qiao-jun,WANG Wei,LI Wei. A Study on theVehicle Minimum Time Headway [J]. Journal ofSoutheast University, 1998,28 (3): 79-82.
[9]
JTG D60—2004,公路桥涵设计通用规范 [S].JTG D60—2004,General Code for Design of HighwayBridges and Culverts [S].
[10]
BS5400—2—2006, Steel, Concrete and CompositeBridges-Part 2: Specification for Loads [S].