[J].公路交通科技,2006,23 (12):86-90.CAO San-peng,LIU Zhao,YUE Li-qiang Impact Analysis and Crack Prevention for PC Continuous Box Girder Arising form Movable Scaffolding System
[12]
王子健.薄壁箱梁剪力滞效应研究
[13]
[D].西安:西安交通大学,2004.WANG Zi-jian.Study of Shear Lag Effect of Thin-walled Box Girder
[14]
[D].Xi'an:Xi'an Jiaotong University,2004.
[15]
周旺进.基于FBG传感技术的PC连续箱梁桥施工力学研究
[16]
[D].南京:解放军理工大学,2006.ZHOU Wang-jin.Research on Construction Mechanics of PC Continuous Box Girder Bridge Based on FBG Sensoring Technique
[17]
[D].Nanjing:PLA University of Science & Technology,2006.
[18]
孙宝俊.预应力混凝土结构原理
[19]
[M].北京:人民交通出版社,2002.SUN Bao-jun Prestressed Concrete Structure Theory
[20]
[M].Beijing:China Communications Press,2002.
[21]
徐芝纶.弹性力学简明教程
[22]
施颖,郑健群.从设计层面探讨预应力混凝土连续箱梁桥裂缝控制
[23]
[J].重庆交通学院学报,2005,24 (4):13-18.SHI Ying,ZHENG Jian-qun.Cracking Control of PC Continuous Box Girder Bridges form the Design Point of View
[24]
[J].Journal of Chongqing Jiaotong University,2005,24 (4):13-18.
[25]
李方东.预应力混凝土连续箱梁桥常见裂缝成因分析
[26]
[J].公路与汽运,2004 (3):81-83.LI Fang-dong.Causes for Common Cracks of Prestressed Concrete Continuous Box Girders