全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

岩质边坡锚杆(索)框架梁加固的数值模拟

, PP. 21-26

Keywords: 道路工程,边坡加固,数值模拟,锚杆(索)框架梁,单元耦合

Full-Text   Cite this paper   Add to My Lib

Abstract:

采用一维弹塑性锚索单元及三维弹塑性锚杆单元与三维线弹性梁单元耦合的方法,模拟边坡工程中的锚杆框架、预应力锚索框架以及它们与加固岩体的相互作用,对西攀高速公路K132岩质高边坡加固进行了方案的评价比选。结果表明,与锚杆框架梁相似,无框架的锚杆加固方案能对坡体浅部位移及应力场有所改进,不同的是,锚杆框架能够显著限制坡体表面变形;预应力锚索框架体系中,锚索的布置及预应力设计值在较大范围内显著影响坡体内部的位移及应力场的分布。因此,预应力锚索框架梁方案是提高K132岩质高边坡稳定性的首选方法之一。

References

[1]  [J]Chinese Journal of Geotechnical Engineering,2000,22 (4):471-474.
[2]  丁秀美,黄润秋,臧亚君.预应力锚索框架作用下附加应力的FLAC-3D模拟
[3]  [J].成都理工大学学报(自然科学版),2003,30 (4):339-345.DING Xiu-mei,HUANG Run-qiu,ZANG Ya-jun.Three Dimension Simulation with FLAC on the Subsidiary Stress Induced by Frame Beam with Prestressd Cable
[4]  吕庆,孙红月,尚岳全,等.预应力锚索框格梁体系加固破碎岩质边坡合理间距研究
[5]  [J].岩石力学与工程学报,2006,25(1):136-140.LV Qing,SUN Hong-yue,SHANG Yue-quan,et al.Study on Proper Interval of Prestressed Cables in Reinforcing Crush Rock Slope
[6]  [J].Chinese Journal of Rock Mechanics and Engineering,2006,25(1):136-140.
[7]  宋修广,张思峰,李英勇.路堑高边坡开挖、锚固数值模拟及稳定性分析
[8]  [J].公路交通科技,2005,22(4):38-40.SONG Xiu-guang,ZHANG Si-feng,LI Ying-yong.Stability Analysis and Simulation of Excavation and Reinforcement of High Slope of Expressway
[9]  [J].Journal of Highway and Transportation Research and Development,2005,22 (4):38-40.
[10]  [J].Chinese Journal of Rock Mechanics and Engineering,2005,24 (6):1 010-1 013.
[11]  成永刚.顺层滑移路堑边坡的开挖及治理分析
[12]  [J].公路交通科技,2006,23(4):56-59.CHENG Yong-gang.Analysis and Treatment of Bedding-slip Cut Slope
[13]  [J].Journal of Highway and Transportation Research and Development,2006,23(4):56-59.
[14]  朱合华,李新星,蔡永昌,等.隧道施工中洞口边仰坡稳定性三维有限元分析
[15]  [J]公路交通科技,2005,22(6):119-122.ZHU He-hua,LI Xin-xing,CAI Yong-chang,et al 3D Nonlinear FEM analysis on the Stability of the Slope at Tunnel Face During the Construction of the Twin Tunnels
[16]  [J]岩石力学与工程学报.2005,24(22):4055-4064 HU Bin,FENG Xia-ting,HUANG Xiao-hua,et al.Regression Analysis of Initial Geostress Field for Left Bank High Slope Region at Longtan Hydropower Station
[17]  [J].Chinese Journal of Rock Mechanics and Engineering,2005,24 (22):4 055-4 064.
[18]  Itasca Consulting Group Inc..FLAC3D User's Manual Version 2.0
[19]  朱焕春.某边坡锚杆应力状态测试与分析
[20]  [J].岩土工程学报,2000,22 (4):471-474.ZHU Huan-chun.Measurements and Analysis on Bolt Stresses at a Slope
[21]  [J].Journal of Chengdu University of Technology (Science & Technology Edition),2003,30 (4):339-345.
[22]  冯君,周德培,李安洪.顺层岩质边坡开挖稳定性研究
[23]  [J].岩石力学与工程学报,2005,24 (9):1 474-1 478.FENG Jun,ZHOU De-pei,LI An-hong.Research on Stability of Rock Bedded Slopes Excavation
[24]  [J].Chinese Journal of Rock Mechanics and Engineering,2005,24(9):1474-1478.
[25]  廖秋林,曾钱帮,刘彤,等.基于ANSYS平台复杂地质体FLAC3D模型的自动生成
[26]  [J].岩石力学与工程学报,2005,24(6):1010-1013.LIAO Qiu-lin,ZENG Qian-bang,LIU tong,et al.Automatic Model Gene ration of Complex Geologic Body with Flac3D Based on ANSYS Platform
[27]  [J].Journal of Highway and Transportation Research and Development,2005,22 (6):119-122.
[28]  吴礼舟,黄润秋.锚杆框架梁加固膨胀土边坡的数值模拟及优化
[29]  [J].岩土力学,2006,27 (4):605-614.WU Li-zhou,HUANG Run-qiu.Numerical Simulation and Optimum Design of Anchor Frame Beam Strengthening Expansive Soil Roadcut Slope
[30]  [J].Rock and Soil Mechanics,2006,27 (4):605-614.
[31]  郑惠峰,汪卫明,陈胜宏.弹粘塑性块体单元法在龙滩水电站右坝肩边坡稳定分析中的应用
[32]  [J].岩土力学,2006,27(1):107-111.ZHENG Hui-feng,WANG Wei-ming,CHEN Sheng-hong.Application of Elasto-viscoplastic Block Element Method to Stability Analysis of Right Abutment Slope in Longtan Hydropower Project
[33]  [J].Rock and Soil Mechanics,2006,27 (1):107-111
[34]  胡斌,冯夏庭,黄小华,等.龙滩水电站左岸边坡区初始地应力场反演回归分析
[35]  [R].USA:Itasca Consulting Group Inc.,1997.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133