[D].西安:长安大学,2001.CAO Dong-wei.Research on Structure of Continuously Rein-forced Concrete Pavement
[2]
[D].Xi'an:Chang'an University,2001.
[3]
陈云鹤,邓学钧,周早生.连续配筋混凝土路面温度应力的弹性解
[4]
[J].应用力学学报,2000,17(4):36-42.CHEN Yun-he,DENG Xue-jun,ZHOU Zao-sheng.Elastic Solution for Thermal Stress in Continuously Reinforced Concrete Pavement(CRCP)
[5]
陈云鹤,邓学钧,杨树才,等.连续配筋混凝土路面早期裂缝宽度分析
[6]
[J].中国公路学报,1998,11(Sup):36-42.CHEN Yun-he,DENG Xue-jun,YANG Shu-cai,et al.Analysis of Crack Width in Continuously Reinforced Concrete Pavement(CRCP)at Early Ages
[7]
[J].China Journal of Highway and Transport,1998,11(Sup):36-42.
[8]
陈锋锋,黄晓明,秦永春.连续配筋混凝土路面横向裂缝分布模型的研究
[9]
[J].公路交通科技,2006,23(6):18-21.CHEN Feng-feng,HUANG Xiao-ming,QIN Yong-chun.Study on the Probability Distribution Model of Continuously Reinforce Concrete Pavement Transverse Cracks
[10]
[J].Journal of Highway and Transportation Research and Development,2006,23(6):18-21.
[11]
倪富健,董侨,顾兴宇.连续配筋水泥混凝土路面面板位移研究
[12]
[J].Journal of China & Foreign Highway,2003,23(2):26-28.
[13]
王虎,胡长顺,王秉纲.连续配筋混凝土路面在横向荷载作用下的解析解
[14]
[J].西安公路交通大学学报,1999,19(4):1-5.WANG Hu,HU Chang-shun,WANG Bing-gang.Analytic Solution for Continuously Reinforced Concrete Pavement under Transverse Loading
[15]
宋玉普,赵国藩.钢筋与混凝土间粘结应力2滑移关系的应力变分模型
[16]
汤广来.钢筋与混凝土粘结应力计算模式的研究
[17]
曹东伟,胡长顺.连续配筋混凝土路面温度应力分析
[18]
[J].西安公路交通大学学报,2001,21(2):1-5.CAO Dong-wei,HU Chang-shun 1Analysis of the Thermal Stress for Continuously Reinforced Concrete Pavement(CRCP)
[19]
[J].Journal of Xi'an Highway University,2001,21(2):1-5
[20]
JTGD4022002,公路水泥混凝土路面设计规范
[21]
[S].JTG D4022002,Specifications of Cement Concrete Pavement Design for Highway
[22]
[S].
[23]
曹东伟.连续配筋混凝土路面结构研究
[24]
[J].Chinese Journal of Applied Mechanics,2000,17(4):36-42.
[25]
[J].公路交通科技,2007,24(5):35-38.NI Fu-jian,DONG Qiao,GU Xing-yu.Research on the Slab Movement of Continuously Reinforced Concrete Pavement
[26]
[J].Journal of Highway and Transportation Research and Development,2007,24(5):35-38.
[27]
顾兴宇,董侨,倪富健.连续配筋水泥混凝土路面裂缝发展规律研究
[28]
[J].公路交通科技,2007,24(6):37-40.GU Xing-yu,DONG Qiao,NI Fu-jian.Research on Crack Progression of Continuously Reinforced Concrete Pavement
[29]
[J].Journal of Highway and Transportation Research and Development,2007,24(6):37-40.
[30]
李卓,查旭东,张起森.连续配筋混凝土路面早期横向开裂分析
[31]
[J].中外公路,2003,23(2):26-28.LI Zhuo,ZHA Xu-dong,ZHANG Qi-sen.Analysis of Dehis-cence in Continuously Reinforced Concrete Pavement(CRCP)at Early Ages
[32]
[J].Journal of Xi'an Highway University,1999,19(4):1-5.
[33]
[J].大连理工大学学报,1994,34(1):59-67.SONG Yu-pu,ZHAO Guo-fan.Stress Variation Model of Bond Stress-slip Relationship between Steel Bar and Concrete
[34]
[J].Journal of Dalian University of Technology,1994,34(1):59-67.
[35]
[J].合肥工业大学学报(自然科学版),1999,23(5):103-107.TANG Guang-lai.Study on Calculating Model of Bond Stress between Reinforcing Bar and Concrete
[36]
[J].Journal of Hefei University of Technology,1999,23(5):103-107.