OALib Journal期刊
ISSN: 2333-9721
费用:99美元
|
|
|
南京长江三桥钢索塔施工测量技术
, PP. 73-80
Keywords: 桥梁工程,钢索塔,预拼装测量,拼装测量,控制网
Abstract:
南京长江三桥为我国首座采用钢索塔结构的特大型斜拉桥。针对机加工车间的钢索塔节段预拼装工艺流程和桥位现场的钢索塔拼装施工流程,研究了预拼装过程中的微型控制网建立、测量点选择、钢索塔节段温度测量、钢索塔轴线偏差等方面的测量技术和数据处理方法。根据钢索塔的施工流程,提出了钢索塔拼装控制网布设、拼装定位等测量与数据处理方案;通过预拼装测量获取钢索塔已预拼装节段的状态,指导了钢索塔后继节段加工与调整,为桥位施工现场钢索塔拼装提供数据和保证了钢索塔拼装的顺利进行。南京三桥钢索塔的各项竣工数据指标均优于钢索塔验收标准,说明所采用的钢索塔施工测量方法完全满足特大型桥梁钢索塔设计、施工的需要,可以为同类型的工程提供参考。
References
[1] | 刘世忠,陈权,李少波.同安银湖独塔单索面部分斜拉桥
|
[2] | [J].Journal of Highway and Transporlation Research and Development,2006,23(5):57-59.
|
[3] | [M].北京:人民交通出版社.2002.LIU Shi-lin,LIANG Zhi-tao.Cable-stayed Bridge
|
[4] | [M].Be-ijing:China Communications Press,2002.
|
[5] | 华锡生,黄腾.精密工程测量技术及应用
|
[6] | [M].南京:河海大学出版社,2002.HUA Xi-sheng,HUANG Teng.Techniques and Application of Precise Engineering Surveying
|
[7] | [M].Nanjing:Hohai Univer-sity Press.2002.
|
[8] | 孔祥元,梅是义.控制测量学
|
[9] | [M].武汉:武汉大学出版社,2004.KONG Xiang-yuan.NEI Shi-yi.Control Surveying
|
[10] | [M].W-uhan.Wuhan University Press,2004.
|
[11] | GB50026-93,工程测量规范
|
[12] | [S].GB50026-93,Norm of Engineering Surveying
|
[13] | [S].
|
[14] | [J].Bridge Construction,2002(6):23-26.
|
[15] | 刘来君,贺拴海,宋一凡.大跨径桥梁施工控制温度应力分析
|
[16] | [J].中国公路学报,2004,17(1):53-56.LIU Lai-jtm,HE Shuan-hai,SONG Yi-fan.Analysis of Tern-perature Stress in Control of Long-spann Bridge Consuuction
|
[17] | [M].Wuhan:Wuhan University Press,2004.
|
[18] | 张宝魁,马清珍.云阳长江公路大桥施工控制
|
[19] | [J].公路交通科技,2007,24(8):73-77,82.ZHANG Bao-kui,MA Qing-zhen.Conslruction Control of a Highway Cable-stayed Bnage on the Yangtze River
|
[20] | [J].Jou-real of Highway and Transportation Research and Development,2007,24(8):73-77,82.
|
[21] | [J].石油化工设备,1995,24(6):33-35.LIU Yi-en,LENG Hao.Analysis of the Influential Factors to Boiler and Pressure Vessel
|
[22] | [J].Petro-Chemical Equipment,1995,24(6):33-35.
|
[23] | 杜振兵.高强度螺栓安装施工技术
|
[24] | [J].山西建筑,2003,29(3):111-112.DU Zheng-bing.Construction Technology of High Strength Bolt Imtallation
|
[25] | [J].Shanxi Architecture,2003,29(3):111-112.
|
[26] | 陈明宪.斜拉桥建造技术
|
[27] | [M].北京:人民交通出版社,2004.CHEN Ning-xian.The Construction Technology of Pony Tower Cable-Stayed Bridge
|
[28] | [J].公路交通科技,2006,23(5):57-59.LIU Shi-zhong,CHEN Quan,Ll Shao-bo.Tongan Yinhu Sin-gle P)rlon Partial One-side Cable-Stayed Bridge
|
[29] | 刘世林,梁智涛.斜拉桥
|
[30] | 刘成龙,李振伟.现代桥梁施工平面控制网建网方法研究
|
[31] | [J].桥梁建设,2002(6):23-26.LIU Cheng-long,LI Zhen-wei.Research of Methods for Estal-lishing Horizontal Control Network for Nodern Bridge Constmc-tion
|
[32] | [J].Claim Journal 0f Highway and Transport,2004,17 (1):53-56.
|
[33] | 冯闻灏.工业测量
|
[34] | [M].武汉:武汉大学出版社,2004.FENG Wen-hao.Industrial Surveying
|
[35] | 刘溢恩,冷豪.锅炉与压力容器检验测量影响因素的分析
|
[36] | [M].Beijing:China Communications Press.2004.
|
Full-Text
|
|
Contact Us
service@oalib.com QQ:3279437679 
WhatsApp +8615387084133
|
|