[J].工程力学,2001,18(1):103-109.WANG Zhi-gang,SUN Bing-nan.Cable Vibration of Cable Stayed Briage by Parametic Response
[4]
[J].Journal of Chongqing Jiaotong Uni-versity,2007,26(3):10-13.
[5]
余报楚,张哲,朱巍志,等.大跨度斜拉桥与T构协作体系的动力特性分析
[6]
[J].公路交通科技,2007,24(4):84-89.YU Bao-chu.ZHANG Zhe,ZHU Wei-zhi,et al.Analysis of Dynamic Characteristics of Collaborated System with Long-span Cable-stayed Briage and T-shape Rigid Structure
[7]
[J].Journal of Highway and Transportation Research and Development,2007,24(4):84-89.
[8]
孙正华,李兆霞.润扬斜拉桥有限元模拟及模态分析
[9]
[J].地震工程与工程振动,2006,26(2):25-32.SUN Zheng-hua.LI Zhao-Xia.Finite Element Modeling and Nodal Analysis of Runyang Cable-stayed肺dge
[10]
[J].Eart-hqllake Engineering and Engineering Vibration,2006,26(2):25-32.
[11]
张浩,陈应波.大跨度斜拉桥模态测试与分析
[12]
[J]武汉理工大学学报,2007,29(4)79-81.ZHANG Hao,CHIEN Ying-bo.Modal Test and Analysis of Long-span Cable-stayed Bridge
[13]
范立础.桥梁抗震
[14]
[M].上海:同济大学出版社,2001.FAN Li-chu.Earthquake Prod of Bridge
[15]
[J].Engineering Me-chanics.2001,18(1):103-109.
[16]
陈水生,孙炳楠.斜拉桥索-桥耦合非线性参数振动数值研究
[17]
[J].土木工程学报,2003,36(4):70-75.CHEN Shui-sheng.SUN Bing-nan.Ntmerical Stuay on Nonlinear Pametic Vibration of Coupled Cables and Bridge Decks