OALib Journal期刊
ISSN: 2333-9721
费用:99美元
|
|
|
水泥路面板高温隆起的力学机理分析
, PP. 1-5
Keywords: 道路工程,水泥路面板,热弹性力学,路面力学,高温隆起
Abstract:
为了避免或延缓水泥路面板在夏季产生高温隆起现象,从力学机理的角度,探讨了水泥路面板在夏季高温隆起的原因,并举例计算水泥路面板板顶与板底全年最大的应力差及水泥路面板压曲临界应力。结果表明,仅从强度的角度来看,如胀缝设置不当,则旧水泥路面板在夏季都是危险的;如果胀缝功能得不到保证,厚度26cm左右的水泥路面板,在夏季出现隆起的临界板长约为85m。因此,建议在南方地区,对于4级及4级以下公路(特别是低造价的农村公路)广泛采用的素混凝土或低配筋混凝土路面,胀缝按80m间距来设置是适宜的。
References
[1] | 邓学均,黄晓明.路面设计原理
|
[2] | 曹东伟,胡长顺.连续配筋混凝土路面温度应力分析
|
[3] | [J].西安公路交通大学学报,2001,2.(2):1-4.CAO Dong-wei,HU Chang-shun.Analysis of the Thermal Stressfor Continuously Reinforced Concrete Pavement(CRCP)
|
[4] | [J].中南公路工程,2004,29(4):59-61.LOU Yi-hong,LUO Qi-zhi,ZHANG Yu-hong.Thermal StressAnalysis of Prestressed Concrete Pavement
|
[5] | 谈至明,姚祖康,刘伯莹.双层水泥混凝土路面板的温度应力
|
[6] | [J].中国公路学报,2003,16(2):10-12.TAN Zhi-ming,YAO Zu-kang,LIU Bo-ying.Thermal StressAnalysis of Two-layered Concrete Slabs
|
[7] | [J].China Journal of Highway and Transport,2003,16(2):10-12.
|
[8] | 谈至明,姚祖康.层间约束引起的双层水泥混凝土路面板的温度应力
|
[9] | [J].交通运输工程学报,2001,1(1):25-28.TAN Zhi-ming,YAO Zu-kang.Thermal Stress in Two-layerConcrete Slab due to Restraint of Interface
|
[10] | [J].Journal of Traffic and Transportation Engineering,2001.(1):25 -28.
|
[11] | 谈至明,姚祖康.非线性温度场下的水泥混凝土路面温度应力
|
[12] | [J].公路交通科技,2008,25(3 ):1-7.LIU Han-bing,ZHANG Yun-long,GAO Yuan.Analysis ofThermal Stress for Continuously Reinforced Concrete Pavement(CRCP)
|
[13] | [J].Journal of Highway and Transportation Researchand Development,2008,25(3):1-7.
|
[14] | 牛开民,田波.水泥混凝土路面等效疲劳温度应力系数
|
[15] | [J].中国公路学报,2006,19(5):23-28.NIU Kai-min,TIAN Bo.Equivalent Fatigue Thermal StressCoefficient of Cement Concrete Pavement
|
[16] | [J].China Journalof Highway and Transport,2006,19(5):23-28.
|
[17] | 陈锋锋,黄晓明,秦永春.连续配筋混凝土路面横向裂缝分布模型的研究
|
[18] | [J].公路交通科技,2006,23(6):18-21.CHEN Feng-feng,HUANG Xiao-ming,QIN Yong-chun.Study onthe Probability DistributionModel of Continuously Reinforced ConcretePavement Transverse Cracks
|
[19] | [J].Journal of Highway andTransportation Research and Development,2006,23(6):18-21.
|
[20] | 顾兴宇,董侨,倪富健.连续配筋水泥混凝土路面裂缝发展规律研究
|
[21] | [J].公路交通科技,2007,24(6):37-40.GU Xing-yu,DONG Qiao,NI Fu-jian.Research on CrackProgression of Continuously Reinforced Concrete Pavement
|
[22] | [J].Journal of Highway and Transportation Research and Development,2007,24(6):37-40.
|
[23] | 倪富健,董侨,顾兴宇.连续配筋水泥混凝土路面面板位移研究
|
[24] | [J].公路交通科技,2007,24(5):35-38.NI Fu-jian,DONG Qiao,GU Xing-yu.Research on the SlabMovement of Continuously Reinforced Concrete Pavement
|
[25] | [J].Journal of Highway and Transportation Research and Development,2007,24(5):35-38.
|
[26] | HICKS R G.Development of the 2002 Guide for Design of Newand Rehabilitated Pavement Structure
|
[27] | [R].NCHRP 1-37.Washington D C,USA:Transportation Research Board,1997.
|
[28] | AASHTO.The 2002 AASHTO Guide for Design of Pavement
|
[29] | [M].Washington D C,USA:American Association of StateHighway and Transportation Officials,2002.
|
[30] | RUIZ JM,RASMUSSEN R O,NELSON P K1Paving the Way
|
[31] | 徐芝纶.弹性力学
|
[32] | [M].第3版.北京:高等教育出版社,1990.XU Zhi-lun.Elastic Mechanics
|
[33] | [M].3rded.Beijing:Higher Education Press,1990.
|
[34] | [M].北京:人民交通出版社,2001.DENG Xue-jun,HUANG Xiao-ming.Principles and Design Methods of Pavement
|
[35] | [M].Beijing:China CommunicationsPress,2001.
|
[36] | [J].Journal of Xi. an Highway University,2001,21(2):1-4.
|
[37] | 娄奕红,罗旗帜,张玉红.预应力混凝土路面的温度应力分析方法
|
[38] | [J].Central SouthHighway Engineering,2004,29(4):59-61.
|
[39] | [J].中国公路学报,1993,16(4):9-17.TAN Zhi-ming,YAO Zu-kang.Thermal Stress of ConcreteSlabs under Nonlinear Temperature Field
|
[40] | [J].China Journalof Highway and Transport,1993,16(4):9-17.
|
[41] | 刘寒冰,张云龙,高远.连续配筋混凝土路面温度应力分析
|
[42] | [J].Public Road,2002,66(1):15-19.
|
[43] | JTG D40O2003,公路水泥混凝土路面设计规范
|
[44] | [S].JTG D40O2003,Specifications of Cement Concrete PavementDesign for Highway
|
[45] | [S].
|
Full-Text
|
|
Contact Us
service@oalib.com QQ:3279437679 
WhatsApp +8615387084133
|
|