[M].北京:人民交通出版社,2007.LI Zhu-long.Design and Construction of Corrugated Steel Cul-verts
[3]
[J].西安工业学院学报,2006,26(1):83-86.LIU Bai-lai,LI Zhu-long,WANG Shuang-jie.The Accuracy of Finite Element Analysis about the Mechanical Performance of Corrugated Steel Culvert
[4]
[M].北京:中国铁道出版社,1981.YANG Yao-qian.Thin Shell Theory
[5]
[J].Journal of Railway Engineering Society,2002(2):50-54.
[6]
陈昌伟.波形钢板结构及其在公路工程中的应用
[7]
[J].Highway,2000 (7):48-54.
[8]
王永岗,吕英民,张进国.波纹管力学性能研究水平述评
[9]
[J].石油机械,1999,27(12):47-50.WANG Yong-gang,LV Ying-min,ZHANGJin-guo.A Review of Mechanical Behavior Studies on Bellows
[10]
Corrugated Steel Pipe Institute,American Iron and Steel Insti-tute.Handbook of Steel Drainage &Highway Construction Prod-ucts
[11]
[M].Second Canadian Edition.Cambridge,Canada:2002.
[12]
National Corrugated Steel Pipe Association.Field Performance Evaluation of Polymer Coated CSP Structures in Wisconsin
[13]
[R].Washington D C:2002.
[14]
[M].Beijing:China Communications Press,2007.
[15]
李祝龙,刘百来.钢波纹管涵洞力学性能现场试验研究
[16]
[J].公路交通科技,2006,23(3):79-82.LI Zhu-long,LIU Bai-lai.Field Mechanical Performance Test of Corrugated Steel Culvert
[17]
[J].Journal of Highway and Transportation Research and Development,2006,23(3):79-82.
[18]
刘百来,李祝龙,汪双杰.钢波纹管涵洞力学性能的有限元分析
[19]
[J].Journal of Xi'an Institute of Technology,2006,26(1):83-86.
[20]
杨耀乾.薄壳理论
[21]
[M].Beijing:China Rail-way Press,1981.
[22]
王秉勇.涵洞顶填土压力的讨论及计算
[23]
[J].铁道工程学报,2002(2):50-54.WANGBing-yong.Discussion and Calculation on Loading Pres-sure of Soil Filled on Top of Culvert
[24]
[J].公路,2000(7):48-54.CHEN Chang-wei.The Usage and the Structure of Corrugated Steel Plate in Highway Engineering
[25]
[J].China Petro-leum Machinery,1999,27(12):47-50.
[26]
National Corrugated Steel Pipe Association.Field Performance Evaluation of Polymer Coated CSP Structures in New York
[27]
[R].Washington D C:2002.
[28]
American Iron and Steel Institute.Modern Sewer Design
[29]
[M].Fourth Edition.Washington D C:United States American Iron and Steel Institute,1999:25.-270.