[J].Journal of Hunan University of Science & Technology:Natural Science Edition,2003,18 (4):41-45.
[3]
[J].岩土工程学报,2007,29(11):1618-1622.ZHAO Minghua,JIANG Chong,CAO Wengui.Study on Bearing Capacity of Rock-socked Piles and Safe Thickness of Cave Roofs in Karst Region
[4]
廖春芳,彭衡和,曹文贵,等.岩溶及采空区路基岩层顶板安全厚度确定方法研究
[5]
[J].公路,2003(1):2-4.LIAO Chunfang,PENG Henghe,CAO Wengni,et al.Research on Determination Method of Safety Tnickness of Top Slab of Rock Bedding of Subgrade in Karst and Mined-out Region
[6]
曹文贵,程哗,赵明华.公路路基岩溶顶板安全厚度确定的数值流形方法研究
[7]
[J].岩土工程学报,2005,27(6):621-625.CAO Wengui,CHENG Ye,ZHAO Minghua.Studies on Numerical Manifold Method for Determinafon of Safe Thickness of Karst Roof in Roadbed
[8]
CHARLES,NG W W,TERENCE,et al.Side Resistance of Large Diameter Bored Piles Socketed into Decomposed Rocks
[9]
曹汉志.桩的轴向荷载传递及荷载-沉降曲线的数值计算方法
[10]
陈龙珠,梁国钱,朱金颖,等.桩轴向荷载-沉降曲线的一种解析算法
[11]
[J].岩土工程学报,1994,16(6):30-38.CHEN Longzhu,HANG Guoqian,ZHU Jinying,et al.Analytical Calculation of Axial tnading-Settlement Curve of Piles
[12]
[J].岩土工程学报,2004,26(1):67-71.ZHAO Minghua,CAO Wengni,LIU Qijian,et al.Methad of Determination of Vertical Bearing Capacity of Rock-socketed Pile by the Settlement of Pile Top
[13]
[J].Chinese Journal of Geotechnical Engineering,2004,26 (1):67-71.
[14]
黎斌,范秋雁,秦风荣.岩溶地区溶洞顶板稳定性分析
[15]
[J].岩石力学与工程学报,2002,21(4):532-536.LI Bin,FAN Qiuyan,QIN Fengrong.Analysis on Roof Stability of Karst Cave in Karst Areas
[16]
[J].Chinese Journal of Rock Mechanics and Engineering,2002,21 (4):532-536.
[17]
赵明华,陈昌富,曹文贵,等.嵌岩桩桩端岩层抗冲切安全厚度研究
[18]
[J].湘潭矿业学院学报:自然科学版,2003,18(4):41-45.ZHAO Minghua,CHEN Changfu,CAO Wengui,et al.Analysis for the Safe Terrane Tnickness of Punching-shear Resistance at the End of Rock-socketed Piles
[19]
赵明华,蒋冲,曹文贵.岩溶区嵌岩桩承载力及其下伏溶洞顶板安全厚度的研究
[20]
[J].Chinese Journal of Geotechnical Engineering,2007,29 (11):1618-1622.
[21]
[J].Highway,2003 (1):2-4.
[22]
赵明华,曹文贵,何鹏祥,等.岩溶及采空区桥梁桩基桩端岩层安全厚度研究
[23]
[J].岩土力学,2004,24(1):64-68.ZHAO Minghua,CAO Wengui,HE Pengxiang,et al.Study on Safe Thickness of Rock Mass at End of Bridge Foundation's Pile in Karst and Worked-out Mine Area
[24]
[J].Rock and Soil Mechanics,213134,24 (1):64-68.
[25]
[J].Chinese Journal of Geotechnical Engineering,2005,27 (6):621-625.
[26]
[J].Journal of Geotechnical and Gee-environmental Engineering,ASCE,2001,127 (8):642-657.
[27]
佐滕悟.基桩承载力机理
[28]
[J].土工技术,1965,20(1):1-5.SATORU S.Besring Capacity Mechanism of Pile
[29]
[J].Geotechnical Engineering,1965,20 (1):1-5.
[30]
[J].岩土工程学报,1986,8(6):37-48.CAO Hanzhi.Numerical Calculation Method for the Axis Loading Transfer and Load-settlement Curve of Pile
[31]
[J].Chinese Journal of Geotechnieal Engineering,1986,8 (6):37-48.
[32]
[J].Chinese Journal of Geotechnical Engineering,1994,16 (6):30-38.
[33]
赵明华,杨明辉,曹文贵,等.确定嵌岩灌注桩竖向承载力的荷载传递法
[34]
[J],岩石力学与工程学报,2004,23(8):1398-1402.ZHAO Minghua,YANG Minghui,CAO Wengui,et al.Load Transfer Method for Determining Vertical Bearing Capacity of Rock-socketed Filling Pile
[35]
[J].Chinese Journal of Rock Mechanics and Engineering,2004,23 (8):1398-1402.