钢筋混凝土拱基于模态频率的承载能力评估

, PP. 63-66

Keywords: 桥梁工程,钢筋混凝土拱,极限承载能力,模态频率,损伤

Full-Text   Cite this paper   Add to My Lib

Abstract:

基于钢筋混凝土拱破坏过程中模态频率的变化规律,进行了承载能力评估方法的研究。对某旧桥中的2根钢筋混凝土拱肋进行了加载过程中的模态试验。基于试验结果和有限元分析研究了有初始损伤和完好的钢筋混凝土拱破坏过程中的模态变化规律,并采用曲线拟和的方法对钢筋混凝土拱的极限承载能力进行了预测。结果表明,该拱接近破坏时模态频率会下降,但各阶模态频率的下降程度与最弱刚度截面的位置有关;拱破坏过程中第1阶模态频率值与所受荷载之间的关系可近似用二次方程来描述。

References

[1]  [J].Computers & Structures,2000,77 (1):91-100.
[2]  BROWNJOHN J M W,MOYO P,OMENZETIER P,et al.Assessment of Highway Bridge Upgrading by Dynamic Testing and Finite Element Model Updating
[3]  [J].Journal of Bridge Engineering,2003,8 (3):162-172.
[4]  ENRIGHT M P,FRANGOPOL D M.Survey and Evaluation of Damaged Concrete Bridges
[5]  [J].Journal of Bridge Engineering,ACSE,2000,5 (1):31-38.
[6]  MOILER B,GRAFW,BEER M.Safety Assessment of Structures in View of Fuzzy Randomness
[7]  [J].Computers & Structures,2003,81 (15):1567-1582.
[8]  SASMAL S,RAMANJANEYULU K.Condition Evaluation of Existing Reinforced Concrete Bridges Using Fuzzy Based Analyric Hierarchy Approach
[9]  [J].Expert System with Applications,2008,35 (3):1430-1443.
[10]  YOON S,WANG K,WEISS W.Interaction between loading,Corrosion and Serviceability
[11]  ZHANG Jianren,LI Chuanxi,XU Feihong,et al.Test and Analysis for Ultimate load-carrying Capacity of Existing Reinforced Concrete Arch Ribs
[12]  蒋友宝,冯健,盂少平.结构损伤识别中模态跃迁的研究
[13]  [J].工程力学,2006,23(6):35-40.JIANG Youban,FENG Jian,MENG Shaoping.Mode Jumping Research in Structural Damage Identification
[14]  [J].Engineering Mechanics,2006,23 (6):35-40.
[15]  赵华.钢筋混凝土拱的承载能力研究
[16]  [J].中南公路工程,2004,29(1):24-27.ZHAO Hua.Ultimate Bearing Capacity of Reinforced Concrete Arch
[17]  [J].Central South Highway Engineering,2004,29 (1):24-27.
[18]  NOWAK A S,KIM S J,STANKIEWICZ P R.Analysis and Diagnostic Testing of a Bridge
[19]  ZHAO Zhiye,CHEN Chuanyu.A Fuzzy System for Concrete Bridge Diagnosis
[20]  [J].Computers & Structures,2002,80(8):629-641.
[21]  [J].ACI Materials Journal,2000,97 (6):637-644.
[22]  [J].Journal of Bridge Engineering,ACSE,2007,12 (1):4-12.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133